My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoRatifyCoEngSignatureTO12
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
ResolutiontoRatifyCoEngSignatureTO12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 2:25:31 PM
Creation date
4/10/2018 2:24:55 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
u
Item
Request to Approve a Resolution to Ratify the County Engineer's Signature on Task Order No. 12 with KPFF
Order
21
Placement
Consent Agenda
Row ID
42911
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� IiZTTIT�iac3 GOLY7nTT`Y <br />DEPARTMENT OF PUBLIC WORDS <br />AITTI'lAS COLNiY <br />2. The field inspection schedule is anticipated to be as provided below (November -April). KPFF <br />assumes the County inspector is also available for these time frames. <br />3. Note: Good ambient light for bridge inspections is often in short supply during the months of <br />November through February. Accordingly, the days below are generated based on the estimated <br />time to drive from bridge -to -bridge and perform the inspection, within the hours each day from <br />sun -rise to sun -set minus two hours_ <br />4. No allowance is made for weather in the attached fee. Our general policy is to inspect in difficult <br />weather conditions but not engage in conditions or situations resulting from the weather that the <br />Team Leader feels are clearly un -safe- If such situations arise the inspection will be rescheduled <br />for as -soon -as possible. Additional costs resulting from weather delays will be issued to the <br />County prior to any changes of the current schedule or budget, for approval. <br />5. The attached budget also assumes the following; <br />• The County, will provide a detailed schedule, day-to-day program and map of all the <br />bridges for months of November and December. For the months of Feb -April the County <br />will share their CAU map of the bridge locations, and KPFF will provide a detailed <br />schedule and day-to-day program and map (assume 10 min per bridge). <br />November 2017: <br />• 23 routine bridge inspections <br />0 19 under 20 ft. bridge inspections <br />• 2 separate trips <br />0 8 days of inspection, on site. <br />0 Per -diem: 8 nights and 8 days - includes travel, one person. <br />December 2017: <br />• 28 under 20 ft. bridge inspections <br />• I trip <br />• 6 days of inspection, on site. <br />• Per -diem: 6 nights and 6 days - includes travel, one person. <br />February 2018: <br />• 9 under 20 ft. bridge inspections <br />• 1 trip <br />0 2 day of inspection. on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.