My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoRatifyCoEngSignatureTO12
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
ResolutiontoRatifyCoEngSignatureTO12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 2:25:31 PM
Creation date
4/10/2018 2:24:55 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
u
Item
Request to Approve a Resolution to Ratify the County Engineer's Signature on Task Order No. 12 with KPFF
Order
21
Placement
Consent Agenda
Row ID
42911
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET <br />Iii CONSULTING ENGINEERS <br />June 22, 2017 <br />Protect <br />Technical <br />Propel <br />Design <br />Protect <br />1 <br />Manager <br />Specialist <br />Engineer <br />Engineer <br />Coordinator. <br />MULTIPLIER <br />ITEM - SCOPE DESCRIPTION <br />6]50 '. $4558 $4039 $3589 $2550 <br />26552 <br />1 <br />-- <br />MANAGEMENT <br />I <br />Contract Cori20 <br />$358 <br />InOi <br />vcmroject g B PSummaries <br />4.0 <br />4 0 <br />$986 <br />Client Comuntion <br />mica <br />4.0 <br />'. <br />40 <br />S1.146 <br />Pribect Coordination <br />60 <br />80 <br />$1.933 _ <br />Management Labor Subtotal: <br />16.0 <br />0.0 <br />12.0 <br />0.0 <br />4.0 <br />$4,425 <br />$0 <br />2 <br />TRAVEL TO SITE - RT <br />.Travel Ellensburg) Sear, RT Assume Ym <br />TO <br />4.0 <br />280 <br />230 <br />33003 <br />Travel Labor Subtotal: <br />1 <br />3 <br />0.0 <br />0.0 <br />28.0 <br />0.0 <br />0,0 <br />$3,003 <br />3 <br />INSPECTION <br />i <br />31 <br />This PlanninglReviewlEpuipment Prep <br />E4,078 <br />SePlendxr Tnps <br />3 <br />4.0 <br />12.0 <br />3A <br />120 <br />��- <br />$1.025 <br />October Lips <br />c <br />r <br />j <br />40 <br />16.0 <br />30 <br />16 C' <br />$2254 <br />32 <br />Bridge Inspection - Field Work <br />f1b.643 <br />September Trips <br />27 <br />225 <br />60.8 <br />$6.515 <br />October Trips <br />3? <br />2.25 <br />BY 3 <br />$8,928 <br />33 <br />'.Inspection R ports - ORice Work <br />i <br />$4 633 <br />Prep areLen lby COunlyl <br />� <br />I <br />Review Hope. (before FinaO <br />64 <br />05 14.0 <br />32.0 <br />$4.149 <br />Plot Soundings@y Coanly; <br />Technical Review <br />° " <br />$484 <br />Inspection Labor Subtotal: <br />_136 _'. <br />0.0 125 0.5 1 <br />28.0 <br />10.0 <br />4.0 <br />204.0 <br />00 <br />0,0 <br />$24,164 <br />TO <br />34 <br />Management Reserve <br />ACditiOnal Inspection Time <br />80 <br />lime <br />Adel Per Diem <br />$191 <br />Labor Subtotal: <br />$1.039 <br />80 <br />TOTAL LABOR HOURS <br />26.0 <br />a,0 <br />244.0 <br />0.0 <br />4.0 <br />27BD <br />TOTAL LABOR COSY. <br />$ 3262! <br />'o <br />� <br />o <br />TOTAL REIMBURSABLE COSTS: <br />5 387$ <br />TOTAL PROJECT COST <br />S 36,48617 <br />
The URL can be used to link to this page
Your browser does not support the video tag.