Laserfiche WebLink
CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET <br />Iii CONSULTING ENGINEERS <br />June 22, 2017 <br />Protect <br />Technical <br />Propel <br />Design <br />Protect <br />1 <br />Manager <br />Specialist <br />Engineer <br />Engineer <br />Coordinator. <br />MULTIPLIER <br />ITEM - SCOPE DESCRIPTION <br />6]50 '. $4558 $4039 $3589 $2550 <br />26552 <br />1 <br />-- <br />MANAGEMENT <br />I <br />Contract Cori20 <br />$358 <br />InOi <br />vcmroject g B PSummaries <br />4.0 <br />4 0 <br />$986 <br />Client Comuntion <br />mica <br />4.0 <br />'. <br />40 <br />S1.146 <br />Pribect Coordination <br />60 <br />80 <br />$1.933 _ <br />Management Labor Subtotal: <br />16.0 <br />0.0 <br />12.0 <br />0.0 <br />4.0 <br />$4,425 <br />$0 <br />2 <br />TRAVEL TO SITE - RT <br />.Travel Ellensburg) Sear, RT Assume Ym <br />TO <br />4.0 <br />280 <br />230 <br />33003 <br />Travel Labor Subtotal: <br />1 <br />3 <br />0.0 <br />0.0 <br />28.0 <br />0.0 <br />0,0 <br />$3,003 <br />3 <br />INSPECTION <br />i <br />31 <br />This PlanninglReviewlEpuipment Prep <br />E4,078 <br />SePlendxr Tnps <br />3 <br />4.0 <br />12.0 <br />3A <br />120 <br />��- <br />$1.025 <br />October Lips <br />c <br />r <br />j <br />40 <br />16.0 <br />30 <br />16 C' <br />$2254 <br />32 <br />Bridge Inspection - Field Work <br />f1b.643 <br />September Trips <br />27 <br />225 <br />60.8 <br />$6.515 <br />October Trips <br />3? <br />2.25 <br />BY 3 <br />$8,928 <br />33 <br />'.Inspection R ports - ORice Work <br />i <br />$4 633 <br />Prep areLen lby COunlyl <br />� <br />I <br />Review Hope. (before FinaO <br />64 <br />05 14.0 <br />32.0 <br />$4.149 <br />Plot Soundings@y Coanly; <br />Technical Review <br />° " <br />$484 <br />Inspection Labor Subtotal: <br />_136 _'. <br />0.0 125 0.5 1 <br />28.0 <br />10.0 <br />4.0 <br />204.0 <br />00 <br />0,0 <br />$24,164 <br />TO <br />34 <br />Management Reserve <br />ACditiOnal Inspection Time <br />80 <br />lime <br />Adel Per Diem <br />$191 <br />Labor Subtotal: <br />$1.039 <br />80 <br />TOTAL LABOR HOURS <br />26.0 <br />a,0 <br />244.0 <br />0.0 <br />4.0 <br />27BD <br />TOTAL LABOR COSY. <br />$ 3262! <br />'o <br />� <br />o <br />TOTAL REIMBURSABLE COSTS: <br />5 387$ <br />TOTAL PROJECT COST <br />S 36,48617 <br />