Laserfiche WebLink
DEPARTMENT OF PUBLIC WORKS <br />K111 ELLS COUNT1 <br />• September 2017: <br />i. 27 routine bridge inspections <br />ii. 3 separate trips <br />iii. 8 days of inspection, on site. <br />iv. Per -diem: 8 nights and 9 days including travel. one person. <br />• October 2017: <br />1. 37 routine bridge inspections <br />ii. 4 separate trips <br />iii. 11 days of inspection, on site. <br />iv. Per -diem: I I nights and 12 days including travel .. one person <br />3. KPFF Bridge Inspector will provide a review of draft -final inspection reports to ensure accuracy <br />with Yield conditions, consistency with the co -inspector's notes, and conformance with NBI and <br />WSDOT inspection standards. <br />4. If requested by the Team Leader, or the County, the Kpff Co- Inspector with also the sign the <br />final Inspection Report for each bridge. <br />Assumptions: <br />I. County Bridge Inspector will provide a schedule and the route for each bridge inspection trip. <br />County Bridge Inspector will enter all reports into WSBIS/Bridgeworks bridge database. County <br />Bridge Inspector will act as Lead Inspector and sign all inspection reports and add to bridge file. <br />2. If, for whatever reason, the County desires Kpff to have a greater role in the inspections (such as <br />serve as Team Lead, and/ or provide a second co -inspector this would be considered an extra and <br />we would like to revisit the budget accordingly. <br />Cost Breakdown: See Attached <br />Completion Date: December 31, 2017 <br />Agency Signature: <br />Consultant Signature: 14,Jrw GCl <br />Thomas 11 Whiteman, Associate <br />Date: <br />Date: 07/12/17 <br />Manager <br />