My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PD-17-00001 Marian Meadows Full Record with Index (2)
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
PD-17-00001 Marian Meadows Full Record with Index (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 2:21:02 PM
Creation date
4/10/2018 12:02:05 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Meeting to Consider the Hearing Examiner's Recommendation for Marian Meadows Planned Unit Development (PD-17-00001) Conditional Use Permit (CU-17-00001) and Plat (LP-17-0001)
Order
1
Placement
Board Discussion and Decision
Row ID
42915
Type
Conduct closed record meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1800
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement 3-137 <br />recreational residents. The number of school buses required to transport that many students would range <br />from about six to two. <br />Student transportation is funded jointly by the state and local districts. The current transportation funding <br />system was developed and incorporated in RCW 28A.160.150 through 28A.160.180. The statute defines <br />specific transportation funding eligibility criteria for students, and prescribes a methodology based on the <br />direct radius mile (“crow’s flight”) distance of each student’s assigned bus stop location to their <br />destination school, the number of students transported, minimum load factors, and weighted distance <br />factors. The allocation amount is ultimately based upon a per-student allocation rate, which is adjusted <br />each year by the Legislature. <br />The school district budgets about $50,000 for transportation of which the state pays about 70 percent. <br />The district’s share of the transportation budget funded from the local operations levy is about 30 percent, <br />although the local share also includes transportation for activities for student trips and athletic trips not <br />funded by the state. <br />School districts can collect local property tax levies for purchase of school buses. Such levies require a <br />60 percent approval rate. <br />4 What are the likely cumulative impacts on school facilities and services with <br />development of nearby land at existing zoning or PUD densities? <br />The potential cumulative impacts of development of nearby land in the vicinity were evaluated for the <br />area north of I-90 served by Sparks Road. The state-owned land surrounding the Easton State Airport was <br />excluded from redevelopment scenarios. The area covered totals about 1.5 square miles (excluding the <br />airport). <br />Cumulative projections include both development of land at existing rural zoning densities and at <br />densities allowed by PUD approval. The methodology for calculating future cumulative development is <br />discussed in Section 3.1, Land Use. The methodology for school student population is discussed above. <br />Potential student populations are indicated in Table 3-21. If development reflecting PUD density were <br />applied to the area as a whole, additional student enrollment would vary from around 850 at the high end <br />to around 153 at the low end. At the upper end of the range, this would be equivalent to current student <br />enrollment in the Cle Elum School District. With buildout of the project vicinity at rural density with 3- <br />acre lots, the district would have about three-quarters the number of students as the Cle Elum School <br />District. <br />In general, the impacts on instruction, facilities, and transportation discussed above for the project would <br />occur at a magnitude three times greater. The same need for local school levies to support instruction, <br />facilities, and transportation would be required but at a greater level.
The URL can be used to link to this page
Your browser does not support the video tag.