Laserfiche WebLink
<br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement 3-136 <br /> <br />In general, in order to qualify for state funding a district must have an existing deficiency. In rapidly <br />growing communities, it generally means that schools must be overcrowded and be using portable <br />classrooms for a substantial number of students before the state will provide funding. <br />Because availability of state match funds has not kept pace with the rapid enrollment growth occurring in <br />many of Washington’s school districts, matching funds from the state may not be received by a school <br />district until after a school has been constructed. In such cases, the district must “front fund” a project. <br />That is, the district must finance the complete project with local funds (the future state’s share coming <br />from funds allocated to future district projects). When the state share is finally disbursed (without <br />accounting for escalation), the future district project is partially reimbursed (OSPI 2008b). <br />School districts can collect two types of local property tax levies for capital facilities: <br /> Capital Project – These levies must be used for school facilities and other capital purposes. Levies <br />can be for 1 to 6 years. <br /> Debt Service (also called “bond levies”) – Voter approval of the levy allows a district to issue <br />bonds (borrow money) and collect property taxes to repay principal and interest over the life of the <br />bond (typically 20 to 30 years). Levies must be used to purchase land and build or renovate school <br />buildings. <br />Local funds must be used for the entire cost of the following items because they are not eligible for the <br />state match (OSPI 2008a): <br /> Acquisition cost of the site. <br /> Area in excess of the space allocations provided in WAC 392-343-035. <br /> All costs associated with the purchase, installation, or relocation of portable classrooms. <br /> Alterations, repair, or demolitions (except alterations necessary to connect new construction to an <br />existing building). <br /> Costs incidental to advertising for bids, site surveys, soil testing for site purchase, or costs other <br />than those connected directly with construction of facilities. <br /> Bus garages, except interdistrict cooperatives. <br /> Central administration buildings. <br /> Stadia/grandstands. <br />Impacts on Transportation <br />Transportation costs are also related to facility decisions. Development of a single school campus for the <br />district would require all students from the site to be bused. Development of schools closer to the site <br />might allow some students to walk. For Alternative 1, the student population could vary from about 260 <br />students with all full-time residents to about 80 students with half the units occupied by seasonal