My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PD-17-00001 Marian Meadows Full Record with Index (2)
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
PD-17-00001 Marian Meadows Full Record with Index (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 2:21:02 PM
Creation date
4/10/2018 12:02:05 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Meeting to Consider the Hearing Examiner's Recommendation for Marian Meadows Planned Unit Development (PD-17-00001) Conditional Use Permit (CU-17-00001) and Plat (LP-17-0001)
Order
1
Placement
Board Discussion and Decision
Row ID
42915
Type
Conduct closed record meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1800
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement 3-133 <br />books, computer supplies, or power. In Easton, local tax assessments account for about 28 percent <br />of the school budget. <br /> The full cost of facilities, including utilities (heating fuel, electricity, water) and facility <br />maintenance are not fully funded. <br /> Transportation costs are generally funded at about 70 percent of cost (although the 2009 Legislature <br />changed the formula, which would increase the state share somewhat). <br />Easton School currently is eligible for a larger allocation of funding from the state as compared to the <br />standard per student allocation because it is classified as a “small school.” <br />If additional enrollment increases beyond the threshold under which the Easton School District is <br />currently classified for “small school funding,” the contribution from the state becomes substantially <br />lower on a per-pupil bases. The loss from the additional funding from the “small school” category would <br />be greater than the additional incremental increase in revenues from the state based on the increase in <br />student population. <br />In the future, if current funding formulas continue, the local community would need to provide between <br />20 and 30 percent of the cost of instruction and transportation. The actual cost to homeowners on an <br />assessment per $1,000 value of property is affected by the overall value of improvements in the district as <br />compared to the number of students. A large percentage of seasonal residents who do not send children <br />to local schools increase the tax base with the value of their homes without increasing school costs; <br />therefore, they lower the average amount paid in local tax levies for schools. <br />An important consideration in rapidly developing communities is the willingness of existing residents to <br />pass operating levies (and construction bond levies) to support additional growth. If local citizens are not <br />willing to pass such levies, the quality of school service would decline from the current level to the level <br />that would be supported by state funding alone. <br />Impacts on Facilities <br />The projected student population in Table 3-20 range from about 260 with Alternative 1 with 443 units <br />with all full-time residents to about 90 with Alternative 3A, 3B and 4 with 147 units with the same tenure <br />scenario with up to 50 percent seasonal residents. This population would result in a need to increase the <br />size of facilities by a factor of up to two and a half of the existing school. <br />At the lower end of the tenure range with up to 50 percent of residents seasonal, Alternative 1 would add <br />an additional 80 students and Alternative 3A, 3B and 4 would add about 30. This student population <br />likely could be accommodated for the first few years by capacity in existing classrooms. After a period of <br />several years, at least two and possibly three new classrooms would need to be added to the existing <br />school for Alternative 1, depending on the grade breakdown of new students. If new students are <br />primarily in elementary grades, as expected, a larger number of classrooms would be needed. Expansion <br />of the existing school would necessitate acquisition of adjacent parcels. For the 30 new students from <br />Alternatives 3A, 3B, and 4 under this scenario, at least one new classroom would be needed.
The URL can be used to link to this page
Your browser does not support the video tag.