My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PD-17-00001 Marian Meadows Full Record with Index (2)
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
PD-17-00001 Marian Meadows Full Record with Index (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 2:21:02 PM
Creation date
4/10/2018 12:02:05 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Meeting to Consider the Hearing Examiner's Recommendation for Marian Meadows Planned Unit Development (PD-17-00001) Conditional Use Permit (CU-17-00001) and Plat (LP-17-0001)
Order
1
Placement
Board Discussion and Decision
Row ID
42915
Type
Conduct closed record meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1800
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement 3-124 <br />6 What measures would mitigate effects on park and recreational demand and <br />facilities? <br />The most straightforward means of mitigating demand for park and recreation facilities is to provide such <br />facilities on the site or provide a proportional contribution to the cost of such facilities. Table 3-17 <br />indicates both the Kittitas County and NRPA Guidelines that may be used to determine appropriate <br />facilities. <br />Provision of park and recreation facilities, including trails, would require not only provision of land but <br />also development of facilities. <br />Providing facilities for ORV and snowmobile use would differ according to whether Forest Service and <br />DNR plans provided for use of existing informal trails, such as along the BPA transmission line <br />easement. If provisions for this corridor are not provided on Forest Service and other lands, an off-road <br />system could be provided on-site. If such system utilized only the BPA corridor, about a third of a mile of <br />trail would be provided. This could loop within the corridor. An alternative design would provide a loop <br />through the lower portion of the site and could total up to about a mile of trail. In either case, users likely <br />would not limit themselves to this corridor and would likely range widely to both the north and sough <br />along the corridor. This wide ranging use would be especially prevalent for snowmobiles which would <br />not be restricted by fencing or signage when snow is deep. <br />If provision is made in Forest Service plans for off-site use of the BPA transmission line, the likely use <br />patterns would be similar to use of the existing informal trail, with the potential for more effective <br />containment of impacts on trails and avoidance of some of the adverse impacts of uncontrolled use. <br />Maintenance of such facilities on the site could be provided by a homeowner association. Maintenance of <br />off-site or regional facilities could be provided by the County or a locally established and funded parks <br />district. Kittitas County Park and Recreation District No. 1, also known as the Upper County Park <br />District, has expanded into the Easton area and could provide such service through voter-approved tax <br />assessments. <br />3.4 PUBLIC SERVICES <br />3.4.1 Public Services - Schools <br />1 What school facilities and services are currently provided in the area? <br />The Easton School District boundaries are shown on Figure 3-20 and generally extend from south of <br />Easton to Snoqualmie Pass. <br />The district provides kindergarten to 12th grade education from a central campus on Railroad Way in <br />Easton. Enrollment has been stable for the past 5 years and has varied from 105 to 120 as indicated in <br />Table 3-18.
The URL can be used to link to this page
Your browser does not support the video tag.