Laserfiche WebLink
<br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement 3-123 <br />activities to serve residents. The population likely served the least would be the demand for youth sports. <br />Off-site facilities most affected would likely be informal use of State of Washington public land and U.S. <br />Forest Service land to the northeast and north, as well as existing playfields at the Easton School. <br />Under Alternative 3D with 33 units, the FTE cumulative population would vary between 970 with all <br />full-time residents and 625 with primarily seasonal residents, primarily from development of existing lots <br />and subdivision outside of the proposal. As with cumulative impacts of other alternatives, the lack of <br />provision for recreation likely would result in greater use of off-site facilities at a slightly lower level. <br />Such facilities are well below the capacity to serve such a population or would result in a lack of <br />opportunities for recreational activities to serve residents. The population likely served the least would be <br />the demand for youth sports. Off-site facilities most affected would likely be informal use of State of <br />Washington public land and U.S. Forest Service land to the northeast and north, as well as existing <br />playfields at the Easton School. <br />5 What are the likely cumulative impacts on parks and recreational facilities with <br />development of nearby land at densities similar to the proposal? <br />The cumulative demand for park and recreation facilities under both Kittitas County and NRPA <br />guidelines are included in Table 3-17. The NRPA guidelines are included as a benchmark against which <br />to measure possible impacts. <br />Alternatives 1 and 2 cumulative FTE populations would vary between about 2,635 with all full-time <br />residents and 1,700 with primarily seasonal residents. For comparative purposes, this would represent a <br />population half as large as the 2009 population of Cle Elum (1,870) to about 90 percent of the size of <br />Cle Elum. At the highest population projections, this would warrant between 16 and 28 acres of parks <br />and between 10 and 18 acres at the lower FTE population. <br />Under existing County LOS standards, it is unlikely that adequate provision for parks and recreational <br />facilities would take place in conjunction with new development. The lack of provision for recreation <br />likely would result in a lack of opportunities for recreational activities to serve residents because off-site <br />facilities are either not in existence or well below the capacity to serve such a population. The population <br />likely served the least would be the demand for youth sports if a substantial proportion of the population <br />were to be families. Off-site facilities most affected would likely be informal use of State of Washington <br />public land and U.S. Forest Service land to the northeast and north, which likely would result in a level of <br />use far beyond that contemplated in management plans for those facilities. Active recreation facilities <br />affected would be existing playfields at the Easton School, which are not adequate to serve the potential <br />demand for youth sports and would likely deteriorate as a result or require a substantial investment to <br />respond to the public need.