Laserfiche WebLink
<br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement 3-76 <br />portion of the site is likely to be much higher than the lower portion. The relative difficulty of snow <br />removal may result in longer road closures in that area due to delays in clearing roads. The difference in <br />the amount and cost of snow removal within the development may be addressed by higher charges for <br />higher elevation areas. <br />19 Would there be changes to how local roads fit into the character of the local <br />community? <br />As described above, roadways in the study area currently provide several functions, including general <br />mobility, freight transportation, direct property access, play areas for children, and recreational facilities <br />(e.g., ATV and snowmobile routes). <br />The character of shared use roadways would change over time. <br />Without or with the project, roadways would likely be used more by <br />motor vehicles compared to other uses and the build scenarios would <br />further increase motor vehicle usage. Although the proportionate <br />share of motor vehicles using the roadways would increase, the <br />functional classifications and general character of shared use <br />roadways are not expected to change. General mobility, freight <br />transportation, direct property access, and recreational usage would <br />be maintained. Roadways could still serve as extensions of front <br />yard and play areas; however, the increase in traffic volumes may <br />tend to lead to less use. Within the existing Easton Village <br />subdivision, volumes on Country Road are projected to increase <br />more than four-fold with 10 percent of project trips presumed to take <br />that route. If more project trips chose that route, the increase would be greater. The total number of trips <br />is relatively low, but it may be great enough to change perceptions of safety for children playing in the <br />area. <br />20 What mitigation is needed for the alternatives? <br />Level of Service mitigation <br />From the traffic operations perspective, all of the study intersections under Alternative 1, Tenure Scenario <br />1with 443 units and full-time residents operate acceptably above the LOS C standard. Therefore, no <br />mitigation is needed with respect to traffic operations. <br />The potential need for left-turn lanes were examined along Sparks Road at Pit Way, Country Drive, and <br />the project access point (West Sparks Access) where the left turns are highest. WSDOT provides <br />guidance (not standards, regulations, or criteria) on when a left-turn lane should be constructed in the <br />WSDOT Design Manual, Exhibit 1310-12a. In this exhibit, the need for a turn lane is based on the <br />volume of left-turns compared to the total through-movement volume of the roadway and the posted <br /> <br />