Laserfiche WebLink
<br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement 2-10 <br />This scenario includes 25 percent workforce families, with 25 percent retired residents, and <br />50 percent part-time recreational residents. <br />These scenarios do not affect the physical layout of the site, but have different impacts on public services <br />such as schools and utility services. <br />3 What is the project schedule and phasing? <br />The project schedule and phasing are unknown due to current economic condition. After initiation of <br />construction of infrastructure, the applicant estimates that for the 225-unit preliminary plat in the western <br />portion of the site 45 lots placed on the market each year. <br />Between 2000 and 2008 an average of 43 new homes were built each year in the Easton School District, <br />which extends from south of Easton to Snoqualmie Pass. Since 2008 there have been very few new <br />building permits issued in the area. <br />For the entire 443-unit PUD, buildout of the project has been assumed to take about 10 years after <br />initiation of construction of infrastructure.