Laserfiche WebLink
<br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement 2-5 <br />provided from Sparks Road at the eastern margin of the flat western portion of the site across <br />adjacent property. <br /> Three roads are stubbed to the east to provide access to the remainder of the site. Two of these <br />roads provide for access to the mini-storage site. <br />Proposed infrastructure to serve the project includes: <br /> Approximately 2.6 miles in the current preliminary plat application (and an estimated 3.8 miles in <br />the eastern portion for 6.4 miles of road at full buildout). <br /> Water service would be provided by the Easton Water District No. 3. <br /> Sewage disposal is proposed through a wastewater treatment plant to be built by the applicant, and <br />designed such that treated effluent would meet standards for recycled water. The lot size proposed <br />in Alternative 1, however, would allow individual on-site sewage disposal systems under <br />Washington State Board of Health standards. Multi-family development in Alternative 2 likely <br />would not be accommodated by on-site systems. <br />The Kittitas County Board of Commissioners will consider the subdivision as a quasi-judicial decision <br />only if the rezone is approved. The preliminary plat will first be reviewed by the Planning Commission <br />who will make a recommendation to the County Commissioners. The criteria for approval of a <br />subdivision under Kittitas County Code 16.12.160 and 170 are: <br /> Whether the proposal includes appropriate provisions for drainage, roads, alleys, and other public <br />ways, water supplies, sanitary wastes, parks, playgrounds, fire protection facilities, school sites and <br />grounds, and other public and private facilities and improvements; <br /> Whether the proposal conforms to the general purposes of the comprehensive plan; and <br /> If the public use and interest will apparently be served by the proposal (Ord. 2005-31, 2005). <br />2 What alternatives have been considered? <br />Two general approaches to alternatives to the applicant’s proposal have been developed. <br /> Alternatives 3A, 3B, 3C, and 3D illustrate development at the existing rural zoning without PUD <br />approval. This would not allow averaging or clustering of lots. All lots would be 3 acres in size or <br />greater. The alternatives vary slightly in elements included and lot size. <br /> Alternatives 4 and 5 incorporate PUD provisions to vary lot size and cluster development to avoid <br />environmental impacts. They differ primarily in whether the steeper western steeper portion of the <br />site is developed. <br />Alternative 3A: No Action with Uniform 3-Acre Lots <br />This alternative illustrates development at the existing zoning without PUD approval. This option would <br />include water district service but would employ individual on-site sewage disposal rather than a <br />wastewater treatment plant. The proposal includes distribution of lots over the site at the minimum 3-acre <br />lot size allowed by existing zoning. This would allow up to 147 total lots. Figure 2-3 provides a