My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PD-17-00001 Marian Meadows Full Record with Index (2)
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
PD-17-00001 Marian Meadows Full Record with Index (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 2:21:02 PM
Creation date
4/10/2018 12:02:05 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Meeting to Consider the Hearing Examiner's Recommendation for Marian Meadows Planned Unit Development (PD-17-00001) Conditional Use Permit (CU-17-00001) and Plat (LP-17-0001)
Order
1
Placement
Board Discussion and Decision
Row ID
42915
Type
Conduct closed record meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1800
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement 1-27 <br />Alternatives 2, 3C, and 5 with no development on the steep eastern portion of the site would avoid <br />features visible from I-90 and much of the community and retain the forested ridgeline. <br />Alternatives 3A, 3B, and 3D with 3-acre lots on both the eastern and western portions of the site would <br />also result in substantial cleared areas for roads and residences, including the residential structures, on the <br />steep eastern portion of the site. The amount of clearing would be less because fewer residences would <br />be developed. That change, however, would contrast sharply with the existing unity of forest cover and <br />would be generally apparent as a contrast to the forested slopes that currently frame the valley. <br />Alternative 3D would have slightly less clearing than Alternatives 3A and 3B due to decreased density in <br />ASZs. <br />Development on the lower flat portion of the site would be large lots similar to existing large lots in the <br />area with extensive retention of forest cover. The large lots coupled with preservation of extensive areas <br />of open space for the ASZs and debris flow areas would contribute to maintaining the rural character of <br />the area. <br />Alternative 4, a PUD with reduced density on the entire site, would also result in significant, identifiable <br />impacts to the character of the eastern sloping areas. However, impacts would be less than those <br />associated with Alternative 1 because development would be avoided on the most visible upper portions <br />of the site. <br />Noise <br />In general, the long-term noise impacts associated with a given residential development are directly <br />related to the number and tenure of the persons inhabiting a development. Impacts would be the largest <br />where residences are most densely clustered and under the tenure scenarios with the highest population <br />and activity levels. <br />Air Quality <br />Regardless of the alternative that is ultimately selected, the existing data for Cle Elum and Ellensburg do <br />not indicate that exceedance of air quality standards is likely, even with a greater population. The upper <br />Yakima River Valley in the vicinity of Easton has good air circulation, no inversions, and no topographic <br />or other features that contain air masses. <br />A restriction on all wood-burning stoves could be imposed on all privately owned units, including the <br />single-family residences. This restriction would reduce emissions from the project, but would be likely to <br />be difficult to enforce over the lifetime of the project. <br />Hazardous Materials <br />The site has not hosted past industrial or commercial activities that are likely to have resulted in <br />hazardous materials being located on the site. It is possible that unregulated dumping on the site has <br />resulted in deposition of household hazardous waste, but no such evidence has yet been observed in field <br />work or reconnaissance on the site by numerous professionals.
The URL can be used to link to this page
Your browser does not support the video tag.