My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PD-17-00001 Marian Meadows Full Record with Index (2)
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
PD-17-00001 Marian Meadows Full Record with Index (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 2:21:02 PM
Creation date
4/10/2018 12:02:05 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Closed Record Meeting to Consider the Hearing Examiner's Recommendation for Marian Meadows Planned Unit Development (PD-17-00001) Conditional Use Permit (CU-17-00001) and Plat (LP-17-0001)
Order
1
Placement
Board Discussion and Decision
Row ID
42915
Type
Conduct closed record meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1800
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FACT SHEET (continued) <br />Marian Meadows Rezone and Subdivision Final Environmental Impact Statement ii <br /> <br />113 lots. <br />The Mitigated Alternatives include specific measures to reduce <br />impacts. <br />Alternative 4: PUD with Reduced Density on the Entire Site <br />includes development on both the western and eastern portions <br />of the site with reduced density and specific design changes and <br />about 147 lots. <br />Alternative 5: PUD with All Development Clustered on the <br />Western Portion of the Site includes development only on the <br />western portion of the site with reduced density and specific <br />design changes. This alternative results in about 113 lots. <br />PROPONENT Easton Ridge Land Company <br />103 South Second Street <br />PO Box 687 <br />Roslyn, WA 98941 <br />509-649-2211 <br />DATE OF IMPLEMENTATION <br /> <br />Build-out is estimated to occur after 2015, and would depend on <br />market conditions.. <br />LEAD AGENCY Kittitas County <br />Community Development Services <br />411 N. Ruby Street, Suite 2 <br />Ellensburg, WA 98962 <br />RESPONSIBLE OFFICIAL Kirk Holmes, Kittitas County Interim Planning Director <br />CONTACT PERSONS Dan Valof, Senior Planner 509- 962-7506 <br />LICENSES, PERMITS, AND <br />APPROVALS POTENTIALLY <br />REQUIRED <br />Kittitas County: <br />Planned Unit Development Rezone Approval <br />Preliminary and Final Plat Approval <br />Master Drainage Plan Approval <br />Environmentally Critical Area Modification Approval <br />Road Improvement Plan Approval <br />Right-of-way Permit for Utility Construction <br />Clearing and Grading Permit(s) <br />Fire Marshal Hydrant Permit Approval <br />Agreement to Locate Utilities (Franchise) <br />Development Agreement (optional) <br />Washington State Department of Ecology: <br />Wastewater Treatment Facility Design Approval <br />Recycled water application permit
The URL can be used to link to this page
Your browser does not support the video tag.