My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields Master File
>
Meetings
>
2016
>
05. May
>
2016-05-17 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:14 AM
Creation date
4/7/2018 10:52:04 AM
Metadata
Fields
Template:
Meeting
Date
5/17/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider a Proposed Development Agreement to Allow Preliminary Plat, Palomino Fields, to Receive Final Plat Review in Five Separate Phases.
Order
1
Placement
2:00pm Public Hearing
Row ID
29616
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applicant Development of Class A Reclaimed Water System as an Alternative to <br />City Of Ellensburg Sewer Services: The applicant will enter into an agreement with <br />LCU, Inc., a private utility company, to produce a plan for providing sewer services to this <br />proposal through the development of a Class A Reclaimed Water system as provided for in <br />RCW 90.46 if the City of Ellensburg declines to serve the proposal with sewer collection <br />service. This planning for said Class A reclaimed Water System will start if the applicant <br />is denied access to the City of Ellensburg utilities through an Utility Extension Agreement. <br />LCU, Inc. is currently in the process of building the first Class A Reclaimed Water System <br />in the county in the Ronald area. The system that is proposed for this project will be <br />similar in design and operation as the approved Ronald Class A Reclaimed Water Facility. <br />This Class A Reclaimed Water facility could use the treated water to augment in stream <br />flow, aquifer recharge, or any or all uses allowed by Washington State Law. <br />Approximately I20 acre feet of reclaimed water could be produced by the Calls A <br />Reclaimed Water facility. <br />2) Describe waste materials that will be discharged into the ground from septic tanks or <br />other sources, if any (for example: domestic sewage; industrial, containing the following <br />chemicals...; agricultural; etc.). Describe the general size of the system, the number of <br />such systems, the number of houses to be served (if applicable), or the number of animals <br />or humans the system(s) are expected to serve. <br />It is intended that urban services will be supplied by the City of Ellensburg via an <br />outside utility extension agreement. <br />If this does not happen then the landowner is prepared to provide his own services <br />through the creation of a Group A Water System, Individual or Community Septic <br />systems, and the development of a Class A Reclaimed Water System. The use of <br />approved Washington State Department of Health or Kittitas County Environmental <br />Health Department Community Septic Systems as well as individual septic systems will <br />be used to treat the initial needs of the development with discharges to the ground as <br />allowed by Washington State Law. A licensed septic designer or a licensed professional <br />engineer will design these systems. These systems will discharge treated wastewater in <br />the amount allowed by Washington State law. <br />Option 1: Applicant Development of Group A Water System as an Alternative to <br />City Of Ellensburg Water Service: If the City of Ellensburg declines to provide the <br />project with water service, the applicant, who owns a number of senior water rights <br />associated with the proposed project, will develop a Group A water system to serve the <br />property. One of the senior water rights would be converted from a surface water right to <br />a ground water right and used to serve the domestic water required for this proposal. This <br />water right would then be used as the basis to form a Group A water system which would <br />be approved by the Washington State Department of Health (DOH). The Group A water <br />system would be managed by LCU, Inc, an approved Satellite Management Agency <br />approved by the DOH and Kittitas County. Irrigation water would be provided through <br />the other existing rights. <br />Option 2: Applicant Development of Class A Reclaimed Water System as an <br />Alternative to City Of Ellensburg Sewer Services: The applicant has an agreement <br />with LCU, Inc., a private utility company, to produce a plan for providing sewer services <br />to this proposal through the development of a Class A Reclaimed Water system as <br />provided for in RCW 90.46 if the City of Ellensburg declines to serve the proposal with <br />sewer collection service. This planning for said Class A reclaimed Water System will <br />start if the applicant is denied access to the City of Ellensburg utilities through an Utility <br />Extension Agreement. LCU, Inc. is currently in the process of building the first Class A <br />Reclaimed Water System in the county in the Ronald area. The system that is proposed <br />
The URL can be used to link to this page
Your browser does not support the video tag.