My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields Master File
>
Meetings
>
2016
>
05. May
>
2016-05-17 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:14 AM
Creation date
4/7/2018 10:52:04 AM
Metadata
Fields
Template:
Meeting
Date
5/17/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider a Proposed Development Agreement to Allow Preliminary Plat, Palomino Fields, to Receive Final Plat Review in Five Separate Phases.
Order
1
Placement
2:00pm Public Hearing
Row ID
29616
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
are met. <br />6) Does the proposal involve any discharges of waste materials to surface waters? If so, <br />describe the type of waste and anticipated volume of discharge. <br />No discharges of waste materials to surface waters will occur if urban services are <br />supplied by the City of Ellensburg via an outside utility extension agreement. It is <br />the intent of the landowner to use the urban services provided by the City of <br />Ellensburg if possible. <br />If this does not happen then the use of approved Washington State Department of <br />Health or Kittitas County Environmental Health Department Community Septic <br />Systems as well as individual septic systems will be used to treat the initial meds of <br />the development. A licensed septic designer or a licensed professional engineer will <br />design these systems. These systems will discharge treated wastewater in the <br />amount allowed by Washington State law. <br />Further if the City of Ellensburg declines to enter into a utility extension agreement with <br />the applicant the applicant will entered into a agreement with LCU, Inc., a private utility <br />company, to produce a plan for providing sewer services to this proposal through the <br />development of a Class A Reclaimed Water system as provided for in RCW 90.46. The <br />Class A reclaimed water system will be constructed once there is adequate volume, <br />approximately 10,000 gallons per day, the Class A Reclaimed Water System will be <br />constructed. This planning for said Class A reclaimed Water System will start if the <br />applicant is denied access to the City of Ellensburg utilities through an Utility Extension <br />Agreement. LCU, Inc. is currently in the process of building the first Class A Reclaimed <br />Water System in the county in the Ronald area. The system that is proposed for this <br />project will be similar in design and operation as the approved Ronald Class A Reclaimed <br />Water Facility. <br />b. Ground <br />1) Will ground water be withdrawn, or will water be discharged to surface waters? If so, give <br />general description, purpose, and approximate quantities if ]mown. <br />There will be no ground water withdrawal or water discharged to surface waters if <br />the City of Ellensburg approves an outside utility extension. <br />If this doesn't happen then the applicant will development a Group A water system <br />to serve this proposal, which will require the withdrawal of ground water. This <br />action will require a water right change from a surface seasonal water right to a year <br />around ground water withdrawal for domestic use. <br />Applicant Development of Group A Water System as an Alternative to City Of <br />Ellensburg Water Service: If the City of Ellensburg declines to provide the project with <br />water service, the applicant, who owns a number of senior water rights associated with the <br />proposed project, will develop a Group A water system to serve the property. One of the <br />senior water rights would be converted from a surface water right to a ground water right <br />and used to serve the domestic water required for this proposal. This water right would then <br />be used as the basis to form a Group A water system which would be approved by the <br />Washington State Department of Health (DOH). The Group A water system would be <br />managed by LCU, Inc, an approved Satellite Management Agency approved by the DOH <br />and Kittitas County. Irrigation water would be provided through the other existing rights. <br />This Group A water system would require the withdrawal of approximately 125 acre feet water <br />from a well annually. <br />
The URL can be used to link to this page
Your browser does not support the video tag.