My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DA-15-00001 Palomino Fields Master File
>
Meetings
>
2016
>
05. May
>
2016-05-17 2:00 PM - 2:00pm Public Hearing
>
DA-15-00001 Palomino Fields Master File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2018 9:15:14 AM
Creation date
4/7/2018 10:52:04 AM
Metadata
Fields
Template:
Meeting
Date
5/17/2016
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Public Hearing to Consider a Proposed Development Agreement to Allow Preliminary Plat, Palomino Fields, to Receive Final Plat Review in Five Separate Phases.
Order
1
Placement
2:00pm Public Hearing
Row ID
29616
Type
Hold Public Hearing
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Management and Maintenance <br />Preserve or initiate management that will keep, maintain, and improve the planting and other riparian <br />vegetation. Proper management is necessary to maintain healthy, competitive plants that function for the <br />intended objectives. This is as important as the planting itself to ensure long- term rehabilitation of the <br />riparian area. Some maintenance will be needed on site for several years after planting. Vegetation should <br />be evaluated and monitored annually. Some replanting will be needed in succeeding years. If you don't <br />replant the first or second year, your continuous barrier could be jeopardized. Once water gets behind the <br />protected line you have planted, it is extremely difficult to repair the damage. <br />Monitoring thesu e is necessary so any in -stream organic material-(i.e: oold-logs, deadroot mas s, <br />branches, etc.) can be removed before stream flow is deflected or gravel bars form. It is much easier to <br />prevent this kind of damage than it is to repair it. As the planting ages and plants start to develop their <br />growth form, some may need to be trimmed or cut to stimulate smaller and denser growth. Trimming <br />should be done in the dormant season so willow growth is not slowed during the growing season. During <br />the establishment period, leave standing dead branches in the clump plantings to reduce stream flow <br />velocities, thus protecting the establishing clumps. <br />If livestock use the area, a prescribed grazing plan should be developed. Little to no grazing should occur <br />during the establishment period. This can take 2-5 years depending on growing conditions. Larger <br />planting stock may be more resistant to grazing pressure, but should be monitored closely to avoid serious <br />damage. <br />Temporary fencing may be necessary to control livestock and wildlife use of the planting during the <br />establishment period. Permanent fencing is an option to prevent grazing by livestock and/or wildlife. <br />Consideration should be given to the creation of "riparian pastures", i.e. grazing units that include riparian <br />zones and floodplains as a majority of the pasture. These riparian pastures increase management <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.