KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />AGENDA STAFF REPORT <br />AGENDA DATE: May 3, 2016 <br />ACTION REQUESTED: Authorize the Director's Signature on Task Order No. 13 <br />with Watershed Science and Engineering Supporting Final <br />Preparation of 2016 Floodplain by Design Grant <br />Applications in the amount of $49,956.00. <br />BACKGROUND: Recently, the Board of County Commissioners approved a <br />task order with Watershed Science and Engineering <br />(WS&E) supporting preparation and submittal of <br />preliminary 2016 Floodplain by Designs grants. The <br />granting agency has since noticed us that our applications <br />have been selected to move to the final evaluation round. <br />Lack of staffing in Public Works requires outside grant <br />preparation support. <br />WS&E has an open task order contract with Public Works. <br />Jacobs has recently acquired grant writing expertise as a <br />result of company purchase. We propose having Jacobs <br />subcontract to Watershed Science producing final <br />Floodplain by Design (FBD) grant applications for: Phase <br />III Reecer Creek, Yakima River Corridor Implementation <br />and Manastash Creek. The cost for WS&E plus Jacobs is <br />$49,956.00. <br />INTERACTION: Public Works <br />RECOMMENDATION: Move to authorize the Director's signature on Task Order <br />No. 13 with Watershed Science and Engineering. <br />HANDLING: Return one original to Public Works <br />ATTACHMENTS: EXHIBIT 1: Task Order No. 13 with Watershed Science <br />and Engineering <br />LEAD STAFF: Mark R. Cook, Director <br />Page 1 of 1 <br />