My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoApproveChairSignatureFHWATeanawayHydraulics
>
Meetings
>
2017
>
08. August
>
2017-08-15 10:00 AM - Commissioners' Agenda
>
ResolutiontoApproveChairSignatureFHWATeanawayHydraulics
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:11:49 PM
Creation date
1/16/2018 12:17:25 PM
Metadata
Fields
Template:
Meeting
Date
8/15/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Interagency Agreement with the Federal Highway Administration Authorizing the Reimbursement of Funds to Kittitas County Public Works for the Teanaway Hydraulic Improvement Project
Order
13
Placement
Consent Agenda
Row ID
38819
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
E. PROJECT BACKGROUND I SCOPE: <br />The proposed project is along T-eanaway Road at approximate Milepost (MP) 6.90 and at <br />approximate MP 8.64 with approximate coordinates 47.25480. - 120-8754 and 47-27587. - <br />120.8821 respectively. <br />Objectives of the project <br />• To improve storm water drainage, fish passagge, and clean water passage <br />• To reduce pavement damage during high water and roadway maintenance cost <br />• To improve safety through the section by providing a facility that safely accommodates <br />vehicular traffic and bike/pedestrian for locals and visitors <br />• To reduce possible roadway closure during high water runoff and overtopping <br />SCOPE <br />• Remove existing undersized culverts and replace with the following (both locations are fish <br />bearing stream and having roadside stability issues. Install bridge rail or guardrail): <br />• MP 6.9, Story Creek — Remove 9'x 3' concrete box. culvert; Install 19'W xl0'Hx60'L <br />concrete box culvert or appropriate structure as identified throughout the design <br />• MP 8.64. Lick Creek (MP 1.36 North Fork Teanaway Road) — Remove 36" CMP and 54" <br />RCP: Rerouting stream channel dependent on hydraulic analysis - Creek is not flowing <br />through the natural downstream channel which created flooding: Construct a single span 80' <br />long bridge or appropriate structure as identified throughout the design; <br />• Reconstruct roadway, repave, and restripe <br />• Install guardrail <br />F. PROJECT BUDGET: <br />This is the anticipated budget for the project based on information developed to date. Federal <br />Lands Access Program funds in conjunction with matching funds provided by County will fund <br />this project as detailed in Section K. Exceeding the budget of one phase does not require this <br />agreement to be amended if the overall budget is not exceeded. <br />Engineering, <br />Preliminary Engineering <br />scoping ane(\ EPA (PE) <br />Stewardship and oversigj <br />Construction (CN) <br />\4odi <br />Cont <br />TOT <br />$40.000 <br />i <br />uding S434.835 <br />S 20.0_00 <br />---1 S 1,514.710 <br />5295.37 i <br />(CM) 5135,:03 <br />- '' 52.440.221 <br />WA Kitwas (I1 Ican.may Road Ilydraulic Improvement- Arad;+I <br />PE previously completed by <br />WFLHD <br />WFLHDS&O <br />Reserved for construction phase. <br />Page 4 of 11 July 34. 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.