Laserfiche WebLink
E. PROJECT BACKGROUND I SCOPE: <br />The proposed project is along T-eanaway Road at approximate Milepost (MP) 6.90 and at <br />approximate MP 8.64 with approximate coordinates 47.25480. - 120-8754 and 47-27587. - <br />120.8821 respectively. <br />Objectives of the project <br />• To improve storm water drainage, fish passagge, and clean water passage <br />• To reduce pavement damage during high water and roadway maintenance cost <br />• To improve safety through the section by providing a facility that safely accommodates <br />vehicular traffic and bike/pedestrian for locals and visitors <br />• To reduce possible roadway closure during high water runoff and overtopping <br />SCOPE <br />• Remove existing undersized culverts and replace with the following (both locations are fish <br />bearing stream and having roadside stability issues. Install bridge rail or guardrail): <br />• MP 6.9, Story Creek — Remove 9'x 3' concrete box. culvert; Install 19'W xl0'Hx60'L <br />concrete box culvert or appropriate structure as identified throughout the design <br />• MP 8.64. Lick Creek (MP 1.36 North Fork Teanaway Road) — Remove 36" CMP and 54" <br />RCP: Rerouting stream channel dependent on hydraulic analysis - Creek is not flowing <br />through the natural downstream channel which created flooding: Construct a single span 80' <br />long bridge or appropriate structure as identified throughout the design; <br />• Reconstruct roadway, repave, and restripe <br />• Install guardrail <br />F. PROJECT BUDGET: <br />This is the anticipated budget for the project based on information developed to date. Federal <br />Lands Access Program funds in conjunction with matching funds provided by County will fund <br />this project as detailed in Section K. Exceeding the budget of one phase does not require this <br />agreement to be amended if the overall budget is not exceeded. <br />Engineering, <br />Preliminary Engineering <br />scoping ane(\ EPA (PE) <br />Stewardship and oversigj <br />Construction (CN) <br />\4odi <br />Cont <br />TOT <br />$40.000 <br />i <br />uding S434.835 <br />S 20.0_00 <br />---1 S 1,514.710 <br />5295.37 i <br />(CM) 5135,:03 <br />- '' 52.440.221 <br />WA Kitwas (I1 Ican.may Road Ilydraulic Improvement- Arad;+I <br />PE previously completed by <br />WFLHD <br />WFLHDS&O <br />Reserved for construction phase. <br />Page 4 of 11 July 34. 2017 <br />