My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoApproveChairSignatureFHWATeanawayHydraulics
>
Meetings
>
2017
>
08. August
>
2017-08-15 10:00 AM - Commissioners' Agenda
>
ResolutiontoApproveChairSignatureFHWATeanawayHydraulics
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:11:49 PM
Creation date
1/16/2018 12:17:25 PM
Metadata
Fields
Template:
Meeting
Date
8/15/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
m
Item
Request to Approve a Resolution Authorizing the Chair's Signature on the Interagency Agreement with the Federal Highway Administration Authorizing the Reimbursement of Funds to Kittitas County Public Works for the Teanaway Hydraulic Improvement Project
Order
13
Placement
Consent Agenda
Row ID
38819
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3. Submit before, during, and post construction photographs to FHWA-WFL to document <br />project progress. <br />4. Submit a copy of the final construction acceptance letter. <br />D. Summary of Deliverables <br />Task <br />Reference <br />Delivery Due On or <br />Para rah <br />Before Date <br />B. PRELIMINARY DESIGN <br />1. DESIGN <br />• Submit a copy of the preliminary plan package and <br />II.C.1.2 <br />March 31, 2018 <br />preliminary cost estimate <br />2. ENVIRONMENTAL COMPLIANCE <br />• If applicable, submit a cultural resources report for <br />Il.C.2.2.i.b <br />With Preliminary Plan <br />FHWA-WFL review. <br />Package <br />• Submit a report or memorandum identifying the <br />II.C.2.2.2.b <br />With Preliminary Plan <br />presence or absence of'urisdictional wetlands <br />I1.C.2.2.2.c <br />Package <br />• If applicable, submit a report documenting T&E and <br />ILC.2.2.3.b <br />With Preliminary Plan <br />EFH species findings to FHWA-WFL. <br />II.C.2.2.3.c <br />Package <br />• If applicable, submit other environmental surveys, <br />studies, and assessments as needed to support <br />II.C.2.2.4.b <br />With Preliminary Plan <br />Package <br />environmental compliance to FHWA-WFL. <br />C. FINAL DESIGN <br />1. DESIGN <br />• Submit final plans, specifications, and construction <br />II D.l 2 <br />Dec 31, 2018 <br />estimate. <br />2. ROW ACQUISITION <br />• Submit certification of rights-of-way and/or easements <br />to FHWA-WFL -or- include certification that all <br />II.D.2.2 <br />With Final PS&E <br />work will occur within existing right-of-way as part of <br />the administrative record. <br />3. UTILITY RELOCATION <br />• Submit certification of Utility Relocation <br />II.D.3.2 <br />With Final PS&E <br />4. PERMITS <br />• Submit a list of all permits necessary for construction <br />IID 4 1 <br />With Preliminary Plan <br />to FHWA-WFL <br />Package <br />• Submit copies of all completed applications for <br />II.D.4.2 <br />With Final PS&E <br />necessary permits to FHWA-WFL: <br />• Submit copies of approved permits. <br />I1 -D.4.3 <br />With Final PS&E <br />5. ADVERTISEMENT <br />• Submit Notice of Contract Award to FHWA-WFL <br />11.D.5.3 <br />Upon Award/ (March, 31 <br />2019) <br />W CONSTRUCTION <br />• Submit before, during, and post construction <br />ILE3 <br />Ongoing <br />photographs to FHWA-WFL <br />
The URL can be used to link to this page
Your browser does not support the video tag.