Laserfiche WebLink
H. ROLES AND RESPONSIBILITIES - MILEs,TONE SCHEDULE: <br />Respoitsibl <br />lI Product/Service <br />Schedule Start/Finish <br />Lead <br />Coun <br />County �H% <br />Design <br />017/ <br />Sept 2March 201_8�� <br />County <br />--� <br />NEPA documentation <br />Sept 2017/ March 2018 <br />FHV✓A <br />NEPA Decision <br />Sepi 2018/ Oct 2018 <br />County <br />95% PS&E <br />i <br />j Sept 2018/ Dec 2018 <br />FHWA-WFL <br />eview95%PS&Epackage <br />30 days after FIIWA-WFI, <br />and other documentation and <br />receives 95% PS&E package <br />return certification letter <br />County i <br />Advertise/Award <br />-- <br />Jan 2019/ March 2019 <br />I <br />County I <br />Constntction <br />---- <br />May 2019% Oct 2019 <br />1. PROPOSED DESIGN STANDARDS: <br />Preferred design alternatives will be determined through the NEPA process. <br />r(:riteria <br />i <br />Comments <br />i Standard <br />Roadway Design Manual <br />AASI ITO -A Policy on <br />i <br />Geometric Design <br />Functional Classification <br />Minor Collector <br />Surface type <br />Asphalt Concrete Pavement <br />T <br />Design Volume <br />5500 ADT <br />Design exceptions to standards, will be documented and sent to the FIIWA-WPC. <br />WA Kafitas (I)-lcanawa}' Road Ilvdraulic Improvement- Amd a I Page 6 of I 1 July 24, '017 <br />