Laserfiche WebLink
f C��fD .,. TO nfp� <br />4`"� KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />IRI'iITAS COIMTV <br />Task 02 — Data Analysis (4 hours) - $274 <br />Task 03 — Geotechnical Field Investigation (32 hours) — $3,920 <br />Task 04 — Geotechnical Engineering Analysis and Report (113 hours) - $14,986 <br />Task 05 — NEPA/SEPA Documentation (263 hours) - $32,566 <br />Task 06 — Environmental Permitting (74 hours) - $8.171 <br />Task 07 — Hydraulics (344 hours) - $46,508 <br />Task 08 — Right of Way (130 hours) - $16,170 <br />Task 09 — Project Kickoff Meeting (32 hours) - $4,065 <br />Task 10 — 30% Design (208 hours) - $20,491 <br />Task 11 — 60% Over The Shoulder Meeting (162 hours) - $15,338 <br />Task 12 — 90% Design (472 hours) - $44,111 <br />Task 13 — 100% Design (200 hours) - $20,565 <br />Other direct costs: Third -party services; mileage; Project field supplies - $23,154 <br />Project Schedule: <br />Project Kickoff Meeting: 8/22/17 <br />• 30% Design: September 2018 <br />• 60% Over The Shoulder: late October/early November 2017 <br />• 90% Design: January 2018 <br />100% Design: March 2018 <br />Agency Signature: Date: <br />Consultant Signature: �LD /u2j Date: <br />7 <br />