My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ResolutiontoApproveChairSignatureTOJacobsManastash
>
Meetings
>
2017
>
08. August
>
2017-08-15 10:00 AM - Commissioners' Agenda
>
ResolutiontoApproveChairSignatureTOJacobsManastash
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 3:11:51 PM
Creation date
1/16/2018 12:15:22 PM
Metadata
Fields
Template:
Meeting
Date
8/15/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
h
Item
Request to Approve a Resolution Authorizing the Chairman's Signature on Formal Task Order Document Number 001 with Jacobs Engineering Group, Inc.
Order
8
Placement
Consent Agenda
Row ID
38819
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2.4. Develop 90% cost estimate for bridge and structure elements <br />2.5. Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />2.6. Provide responses to 60% Over -The -Shoulder review comments <br />3. HYDRAULICS <br />3.1. Develop stream grading plan(s), planting plan(s), and detail(s) incorporating comments, <br />if any, from the 60% milestone meeting. <br />3.2. Develop Special Provision(s) for scour and/or bank protection. <br />3.3. Develop 90% cost estimate for hydraulic elements. <br />3.4. Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />4. ROADWAY <br />4.1. Prepare contract plans for the Manastash Road Bridge, which shall include the <br />following information: <br />4.1.1. Horizontal Alignment <br />4.1.2. Vertical Alignment <br />4.1.3. Typical Sections <br />4.1.4. Traffic Barrier(s) location (outside of bridge limits) <br />4.1.5. Detail(s) <br />4.2. Coordination with COUNTY staff for incorporation of MOT and upstream bank <br />stabilization plans and special provisions provided by the COUNTY .. <br />4.3. Develop Special Provisions for roadway construction <br />4.4. Produce a compiled set of plans, Special Provisions, and cost estimate from all <br />disciplines <br />4.5. Develop 90% Summary of Quantities <br />4.6. Develop 90% cost estimate for roadway elements <br />4.7. Provide responses to 60°% Over -The -Shoulder review comments <br />4.8. Update the Preliminary Basis of Design document for any outstanding issue resolution, <br />project change(s), new/changed design decisions, etc. This document will be <br />considered the Draft Basis of Design. <br />4.9. Perform Quality Control per the Project Specific Quality Plan on the deliverables prior <br />to submission to the COUNTY. <br />5. DELIVERABLES <br />5.1. STRUCTURAL <br />S.I.I. Responses to 60% Over -The -Shoulder Review comments <br />5.1.2. 90% Design Plans (PDF and CAD files) <br />5.1.3. Special Provisions for bridge and structure elements <br />5.1.4. 90% Summary of Quantities <br />5.1.5. 90% Estimate of Cost <br />5.2. HYDRAULICS <br />5.2.1. 90% Design Plan <br />5.2.2. Special Provisions for scour and/or bank protection <br />
The URL can be used to link to this page
Your browser does not support the video tag.