Laserfiche WebLink
1.1. Review conceptual plans for adherence to permits and exemptions. <br />2. STRUCTURAL <br />2.1. Produce one (1) Progress set of plans. <br />2.2. Attend one (1) review meeting with COUNTY, CONSULTANT, and STAKEHOLDER staff. <br />3. HYDRAULICS <br />3.1. Provide design details) for scour/bank protection. <br />3.2. Attend one (1) review meeting with COUNTY, CONSULTANT, and STAKEHOLDER staff <br />via conference call. <br />4. ROADWAY <br />4.1. Coordination with COUNTY staff for incorporation of MOT and upstream bank <br />stabilization plans and special provisions provided by the COUNTY .. <br />4.2. Produce one (1) Progress set of plans <br />4.3. Develop Preliminary Cost Estimate. <br />4.4. Assemble run list of Special Provisions <br />4.5. Attend one (1) review meeting with COUNTY, CONSULTANT, and STAKEHOLDER staff. <br />5. DELIVERABLES <br />5.1. 60°% Progress Set of Design Drawings. <br />5.2. Preliminary Cost Estimate <br />5.3. Comment Log of comments provided at 60% Over -The -Shoulder review meeting. <br />TASK 12 90% DESIGN <br />1. ENVIRONMENTAL <br />1.1. Review plans for adherence to permits and exemptions; continue project commitment <br />tracking. <br />2. STRUCTURAL <br />2.1. Prepare contract plans forthe Manastash Road Bridge, which shall include the <br />following information: <br />2.1.1. General notes on design, construction and materials. <br />2.1.2. Bridge layouts, elevations, and typical sections. <br />2.1.3. Foundation details <br />2.1.4. Plan, elevation and section of each abutment <br />2.1.5. Bridge framing and deck framing plans <br />2.1.6. Precast concrete girder details <br />2.1.7. Traffic barriers and railings <br />2.1.8. Approach slabs <br />2.1.9. Reinforcing Bar list <br />2.1.10. Dimensions and configurations of structural components <br />2.1.11. Design details including reinforcing, prestressing, bearings and joints <br />2.1.12. Partial Demolition Limits of Existing Bridge <br />2.2. Develop Special Provisions for bridge construction <br />2.3. Develop 90% Summary of Quantities <br />