Laserfiche WebLink
civil narrative (cont.) <br />•Electricity/Power (city of Ellensburg)-Paul Meyer (509)925-8602 <br />•Gas (City of Ellensburg)-Heather Forgey (509)925-8603 <br />See Appendix D for additional information. <br />Proposed Water <br />It is recommend that the rodeo demolish and remove the existing domestic water system in the <br />project area all the way back to the existing 2"water meter.Coordination with the mechanical <br />engineer has determined that a 2"water meter will not be sufficient.The existing water meter <br />will be removed and returned to the city and 3"water meter will be installed.The proposed <br />water service will run from the proposed 3"meter and run around the north side of the arena <br />and terminate at the Gold Buckle Club.The proposed line will need to be sized to serve the <br />proposed bathrooms and food service buildings.Valves will be installed on proposed water <br />line services to allow the owner the opportunity to shutoff certain parts of the facility while not <br />affecting service to the rest of the facility. <br />Based on our coordination with the fire department,3 new fire hydrants will be required to be <br />installed as part of this project.The fire department has preliminarily selected the locations of <br />the proposed fire hydrants which are: <br />•South of the rodeo arena and stands (and east of the 4 H Building). <br />•Northeast of the rodeo arena,near the southeast corner of the Western Town. <br />•West of the rodeo arena in the parking area southeast of the National Guard building. <br />The last fire hydrant is located outside the project area and will be replaced as part of the <br />upcoming Barn Replacement project.Additional coordination with the fire department will be <br />required to finalize the locations of the proposed fire hydrants. <br />Proposed Sewer <br />All onsite sanitary sewer/waste water will gravity flow to a new onsite sewer lift station with the <br />exception of the existing Gold Buckle Club.Flows will then be routed from the sewer lift station <br />design developrnent report •alsc architects (01-24-2017)