Laserfiche WebLink
Part 5 Sewer System Plan <br />General Description <br />The proposed project consists of seven structures, each consisting of two attached residential <br />townhomes. The collected raw wastewater from developed portions of Phase 1 Division 12 will <br />be conveyed by means of on-site gravity sewers to the existing sanitary sewer system in Suncadia <br />Trail and further continue to off-site gravity sewers to the Waste Water Treatment Plant (WWTP) <br />in Cie Elum. <br />September 2016 Phase 1 Division 12 Engineering <br />Summary <br />Encompass Engineering & Surveying <br />