My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-17-00005 Highway 9 Master
>
Meetings
>
2017
>
06. June
>
2017-06-06 2:00 PM - 2:00pm Public Hearing
>
LP-17-00005 Highway 9 Master
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 2:13:48 PM
Creation date
1/16/2018 11:54:13 AM
Metadata
Fields
Template:
Meeting
Date
6/6/2017
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
b
Item
Public Hearing to Consider Highway 9 Preliminary Plat (LP-17-00005).
Order
2
Row ID
37130
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Part 4 Project Water Plan <br />additional 353.8 acre-feet per year of consumptive use during the April 1 through October 15 <br />irrigation season. <br />In addition to the transfer of water rights and Order Pendente Lite from the mainstream Yakima <br />River, Suncadia applied to Ecology to transfer eleven water rights in four Yakima River tributaries. <br />These tributary water rights are to be transferred to instream flows in mitigation of impacts from <br />the transfer and use of the Yakima River water rights. Ecology approved the transfer of water <br />rights from two of the four tributaries, Big Creek and the Teanaway River, on May 10, 2002. <br />Transfers of the two remaining tributaries, Swauk and First Creeks, were approved by Ecology on <br />January 7, 2004. Ecology's transfer authorizations for Swauk and First Creek rights were appealed <br />to the Yakima Superior Court. The appeal remains pending as of the date of this Plan. Suncadia, <br />LLC has filed a motion with the Yakima Superior Court to authorize conveyance of all of its water <br />rights from the four tributaries to the State Trust Water Program for mitigation of consumptive <br />water use or other cumulative impacts by the Suncadia Resort for the 2005 and subsequent <br />irrigation seasons which was approved by the Yakima Superior Court during its regularly <br />scheduled Oversight Hearing on February 10, 2005. There are limitations imposed by Ecology on <br />the consumptive use portion of the Pautzke water rights until the tributary rights are transferred <br />to the State Trust Water Program. The tributary water rights and Suncadia's general mitigation <br />strategy is discussed in more detail in Chapter 4 of the June 2001 WSP. <br />Phase 1 Division 12 System Description <br />The preliminary transmission and distribution system for Phase 1 Division 12 is illustrated on the <br />enclosed Conceptual Utility Plan. The water for Phase 1 Division 12 will be supplied by the MPR <br />water reservoirs. The reservoirs are located in the northeast section of the MPR. <br />The project site will propose a looped 8 -inch diameter main that will connect to the water main <br />in Suncadia Trail. All homes are to be fire sprinklered on site. Hydrants will be placed at a <br />maximum of 500 feet spacing. Fire flow calculations were developed using a flow of 1500 gallons <br />per minute at 20 pounds per square inch (psi) pressure. <br />September 2016 Phase 1 Division 12 Engineering <br />Summary <br />Encompass Engineering & Surveying <br />
The URL can be used to link to this page
Your browser does not support the video tag.