My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-17-00005 Highway 9 Master
>
Meetings
>
2017
>
06. June
>
2017-06-06 2:00 PM - 2:00pm Public Hearing
>
LP-17-00005 Highway 9 Master
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 2:13:48 PM
Creation date
1/16/2018 11:54:13 AM
Metadata
Fields
Template:
Meeting
Date
6/6/2017
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
b
Item
Public Hearing to Consider Highway 9 Preliminary Plat (LP-17-00005).
Order
2
Row ID
37130
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Part 3 Stormwater Management Plan <br />Introduction <br />The preliminary Stormwater Management Plan for Phase 1 Division 12 of the Suncadia Master <br />Planned Resort (MPR) is described in this part. The Stormwater Management Plan reflects <br />application of design guidelines detailed in the Department of Ecology Stormwater Management <br />Manuals as well as information presented in the April 1999 (Rev. July 1, 1999) Master Drainage <br />Plan (MDP) that was prepared by W&H Pacific for the MPR. The MDP outlines stormwater design <br />procedures, guidelines, and protocols for the development. <br />Updates to the MDP include; <br />(1) Adoption of the drainage standards set forth in Washington State Department of Ecology's <br />Stormwater Management Manual for Western Washington August 2001 (DOE SMM) per the <br />RIDGE Settlement Agreement Section 1.9 and <br />(2) An addendum to the MDP dated August 2002 that provides (a) water quality protocol <br />information for golf course areas that discharge to surface waters, and (b) revision of golf <br />course water quality protocol summary information for infiltration to conform with the <br />detailed protocol information. <br />Design specifics addressed in this part include: <br />➢ Stormwater runoff collection and conveyance <br />➢ Water quality treatment <br />➢ Overflow routing <br />➢ Conceptual Stormwater Plan <br />The proposed land use for the resort is shown in the General Site Plan for Phase 1. Phase 1 <br />Division 12 is located west of the Prospector golf course in Phase 1 Division 2, bordering the golf <br />course driving range, and south of Suncadia Trail. The Suncadia stormwater system will be <br />privately owned, operated and maintained by the Suncadia Water Company. Construction of <br />Division 12 facilities will be determined at the time of construction plan approval. <br />September 2016 Phase 1 Division 12 Engineering <br />Summary <br />Encompass Engineering & surveying <br />
The URL can be used to link to this page
Your browser does not support the video tag.