My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-17-00005 Highway 9 Master
>
Meetings
>
2017
>
06. June
>
2017-06-06 2:00 PM - 2:00pm Public Hearing
>
LP-17-00005 Highway 9 Master
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2018 2:13:48 PM
Creation date
1/16/2018 11:54:13 AM
Metadata
Fields
Template:
Meeting
Date
6/6/2017
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
b
Item
Public Hearing to Consider Highway 9 Preliminary Plat (LP-17-00005).
Order
2
Row ID
37130
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Part 1 Introduction <br />The proposed project consists of seven structures, each consisting of two attached residential <br />townhomes. Information presented in this document pertains to the proposed roads, <br />illumination, drainage, water and sewer facilities, and solid waste management program to serve <br />the plat of Phase 1 Division 12. <br />Information on the proposed roads reflects the requirements of Exhibit J to the Development <br />Agreement. Information on the storm drainage reflects the requirements of the Department of <br />Ecology Stormwater Management Manuals, the 1999 Master Drainage Plan and preliminary <br />stormwater engineering for Phase 1. Information of the proposed water supply, storage and <br />distribution system, is taken from the June 2001 MPR Water System Plan and the July 2002 <br />Reservoir, Pumping and Transmission Design Reports that were approved by the Washington <br />State Department of Health and preliminary water system engineering performed for Phase 1. <br />Information on the proposed sewage collection, treatment and disposal system is taken from <br />preliminary engineering for Phase 1 and the March 2000 Site Engineering Technical Summary <br />document for the MPR (Appendix A of the FEIS). <br />September 2016 Phase 1 Division 12 Engineering <br />Summary <br />Encompass Engineering & Surveying <br />
The URL can be used to link to this page
Your browser does not support the video tag.