Laserfiche WebLink
<br />pg. 4 <br />Lastly, as the last work scope component of the Construction Documents phase, ART <br />will prepare all submittal documents and submit to the City of Ellensburg for plan <br />review of the project. Upon the completion of this review, ART and its subconsultants <br />will incorporate into the construction documents any review comments/revisions as <br />may be required. <br /> <br />We will propose that A/E design fees be based on the State Department of Financial <br />Management’s Guidelines for Determining A/E Fees for Public Works Building <br />Projects current fee schedule for the project type and anticipated hard cost. The project <br />will include Basic Services (Architectural design, structural engineering, mechanical <br />engineering, and electrical engineering) and Additional Services (such as for <br />landscape architectural design, civil engineering, acoustic engineering design, low <br />voltage/telecomm/security electronics engineering, hazardous materials investigation <br />and abatement design services, and detailed cost estimating). Our Phase 3 fee will be <br />presented as fixed lump sum fee. We will also propose that a reimbursable expenses <br />allowance be included above and beyond the lump sum fee to cover travel, lodging <br />and meals, and printing/binding expenses as may be incurred. ART will include as an <br />attachment to our proposal our most current schedule of our hourly billable rates. <br /> <br />Phase 2 Proposed Fee: <br />We propose to provide the Phase 2 services on an hourly basis with a not-to-exceed fee of $132,500. <br />This not-to-exceed fee includes a reimbursable expenses allowance of $2,585. Please see our attached <br />fees and expenses spreadsheet itemizing the above tasks, associated hours, and resultant fees. Also <br />please see attached fee proposal memos or letters from our subconsultant team members. <br /> <br />We trust our proposed scope of services and accompanying proposed not-to-exceed fee are consistent <br />with your expectations. If you find this fee proposal acceptable, we suggest that a change order to our <br />original agreement be executed for this second phase of the project. <br /> <br />Should you have any questions or comments on any of the above or on any of the attachments, please <br />do not hesitate in contacting either myself or Peter. We are excited about this next phase of the <br />project and are ready to proceed at your direction. <br /> <br /> <br />Respectfully submitted, <br /> Kenn D. Triebelhorn, AIA <br />Principal/Vice President <br />Architects Rasmussen Triebelhorn, AIA/ps <br /> <br />Attachments