Laserfiche WebLink
BID PROPOSAL <br />SCHEDULE C <br />FURNISH MAINTENANCE ROCK <br />PRICE PER TOM DELIVERED TO LOWER COUNTY <br />ITEM <br />ESTIMATED <br />ITEM <br />PRICE <br />NO. <br />QUANTITY <br />DESCRIPTION <br />PER TON <br />1C <br />4,000 <br />TONS <br />Maintenance Sand <br />$ <br />10,000 <br />Crushed Surfacing Top Course <br />2C <br />TONS <br />(WSDOT Standard Specifications) <br />$ <br />3C <br />8,000 <br />TONS <br />Crushed Surfacing Base Course <br />(WSDOT Standard Specifications) <br />$ <br />500 <br />Common Borrow <br />4C <br />TONS <br />(WSDOT Standard Specifications) <br />$ <br />5C <br />500 <br />TONS <br />Light Loose Rip Rap <br />(WSDOT Standard Specifications) <br />$ <br />500 <br />Quarry Spalls <br />6C <br />TONS <br />(WSDOT Standard Specifications) <br />