Laserfiche WebLink
BID PROPOSAL <br />SCHEDULE B <br />FURNISH MAINTENANCE ROCK <br />PRICE PER TON DELIVERED TO UPPER COUNTY <br />ITEM <br />ESTIMATED <br />ITEM <br />PRICE <br />NO. <br />QUANTITY <br />DESCRIPTION <br />PER TON <br />16 <br />4,000 <br />TONS <br />Maintenance Sand <br />$ <br />26 <br />6,000 <br />TONS <br />Crushed Surfacing Top Course <br />(WSDOT Standard Specifications) <br />$ <br />3B <br />6,000 <br />TONS <br />Crushed Surfacing Base Course <br />(WSDOT Standard Specifications) <br />$ <br />4B <br />500 <br />TONS <br />Common Borrow <br />(WSDOT Standard Specifications) <br />$ <br />56 <br />500 <br />TONS <br />Light Loose Rip Rap <br />(WSDOT Standard Specifications) <br />$ <br />66 <br />500 <br />TONS <br />Quarry Spalls <br />(WSDOT Standard Specifications) <br />$ <br />