My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City of Roslyn Transmission Water Main
>
Meetings
>
2018
>
01. January
>
2018-01-16 10:00 AM - Commissioners' Agenda
>
City of Roslyn Transmission Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:48:48 PM
Creation date
1/16/2018 9:07:47 AM
Metadata
Fields
Template:
Meeting
Date
1/16/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution for the 2018 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
20
Placement
Consent Agenda
Row ID
41806
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
8. Explain how the infrastructure project will help meet the economic development goals of your community <br />and/or region. If this project is not done, will the anticipated private development still take place? <br />Consistent, safe, and reliable potable water supplies are key elements to an overall healthy infrastructure that <br />supports economic development. If this project is not completed in a timely manner, planned improvements <br />in the downtown core may become severely restricted. Currently the City is undertaking a massive <br />improvement project, funded by local dollars and the Transportation Improvement Board to ensure <br />infrastructure is in place to support planned economic expansion and tourism. This project continues with <br />that local initiative. <br />9. Describe any feasibility or predevelopment studies that demonstrate the linkage between the proposed <br />Distressed County Infrastructure improvements and the anticipated economic outcomes. <br />The City of Roslyn Water System Plan provides a planning strategy for the City's water <br />utility over 6- and 20 -year periods. The plan has been prepared consistent with <br />Department of Health requirements as specified in the Washington Administrative Code <br />(WAC) Chapter 246-290. The plan represents a commitment by the City to pursue and <br />implement the Plan's recommendations and capital improvements. The City utilizes a single surface water <br />source for its supply of water and growth is projected within the City and UGA based on County -wide <br />projections. By 2032, the City and UGA population for the water system is projected to reach 1,655 people. <br />10. Indicate if other needed infrastructure (e.g., sewer, water, power) is in place or if there is a plan for getting <br />it in place. <br />The City of Roslyn complies with all necessary aspects of mandated comprehensive planning. Currently the <br />city has multiple infrastructure improvement projects under design and construction to support and enhance <br />continued economic development. <br />11. Indicate the Estimated Number of Businesses CreatedlRetained by the Project. 44 <br />See attached narrative. <br />12. Indicated the Estimated Number of Jobs Created/Retained by the Project. 299 <br />See attached narrative. <br />Submit the original application to: <br />Kittitas County Department of Public Works <br />411 N. Ruby, Suite 41 <br />Ellensburg, WA 98926 <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.