My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City of Roslyn Transmission Water Main
>
Meetings
>
2018
>
01. January
>
2018-01-16 10:00 AM - Commissioners' Agenda
>
City of Roslyn Transmission Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:48:48 PM
Creation date
1/16/2018 9:07:47 AM
Metadata
Fields
Template:
Meeting
Date
1/16/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution for the 2018 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
20
Placement
Consent Agenda
Row ID
41806
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
number or approximate number will not be considered a complete answer and will result in your <br />application being rejected from consideration. <br />Question 12: You must include the key assumptions (if any) and their justifications, methodology, <br />and calculations upon which your jobs created/retained estimate is based. Simply providing a <br />number or approximate number will not be considered a complete answer and will result in your <br />application being rejected from consideration. <br />Potential Example Answer for Question 12. <br />We have completed a survev of local contractors likely to bid on a project such as this. Our resuhs <br />(data provided as attachmeno show that due to current economic conditions, a greater supply f<r <br />building services necessary for this project exists in the local market than demand, for those servicer. <br />As a result, most of those surveyed indicate lower levels of employment than in the past, including <br />reducing workforce levels up to SO% and/or intermittent work with extended periods of temporary <br />layoffs due to lack of work. <br />A project this size, according to our estimates (data provided as attachment) will require (a) skilled <br />construction laborers for approximately (X period of time). (A) subcontractors employing (X) <br />laborers for approximately (X period of time), and well as (X) support stuff (administrative, clerical, <br />management) fin (X period time). The agency will also be employing a half tine project manager to <br />oversee the project. <br />Most studies (two examples attached) believe that Il'ashington State's building industry is only <br />beginning to recover and may never reach employment levels previously seen. Keeping shat in mind <br />and being conservative while taking into account the current economic environment of'Upper Kittitas <br />County and especially the depressed construction industry, we estimate ar least (x) jobs will be <br />retained for at least (A) months (the term of the construction phase of the project). In addition, as the <br />agency does not currently employ a qualifued project manager, at least one part-time professional job <br />will be created for the same period. <br />This, ofcorse does not consider anv impact to other local suppliers and supporting businesses <br />which will certainly provide services fir this project as well as those who are directly employed as a <br />result of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.