My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City of Roslyn Transmission Water Main
>
Meetings
>
2018
>
01. January
>
2018-01-16 10:00 AM - Commissioners' Agenda
>
City of Roslyn Transmission Water Main
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2018 2:48:48 PM
Creation date
1/16/2018 9:07:47 AM
Metadata
Fields
Template:
Meeting
Date
1/16/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
t
Item
Request to Approve a Resolution for the 2018 Distressed County Sales and Use Tax Infrastructure Improvement Program Agreement with the City of Roslyn
Order
20
Placement
Consent Agenda
Row ID
41806
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Question Instructions <br />Applicant Information (page 1 of the application): Please fill in all areas completely. The applicant is the <br />agency requesting funding. The contact name will be considered the leader of the project for the applicant <br />agency. The contact should also be the individual who will present the project and will be available for <br />questions from the COG. <br />Applicant Thresholds (page 1 of the application): Your project must meet each of these requirements to <br />be considered. Please check each box and include the necessary documentation with your application. If <br />your project does not meet all of the listed requirements and/or your application does not include the <br />necessary documentation to support your claims, it will not be considered for funding. <br />Project Budget (page 2 of the application): The top line (Distressed County Funds Requested) is to list <br />how much funding you are asking the COG to consider awarding your project. The columns to the right then <br />ask you to include the specific breakdown as to how and in what phase or phases (if a construction project) <br />the money will be utilized. Please be as accurate as possible. <br />The following lines and columns are for other funding sources you have secured or for which you have <br />applied. Again, please be as accurate as possible and fill in the final column for each signifying the status of <br />the funding source (whether or not the funding has been secured). <br />The "Project Total" line is for the total cost of the project the application represents. The sum of all the <br />funding sources lines should accurately add to the figure listed here. Additionally, please also accurately <br />include the breakdown for phases listed to the right, again making sure the sums of the previous columns are <br />equal to the amount placed on each line. <br />Distressed Countv Fund Matching Ratio (page 2 of the application): This line is to show what <br />percentage of the total project budget the applicant is providing in local funding. For instance, if the total <br />project budget is $100,000 and the application is for $50,000 with combined other funding sources of <br />another $50,000 and the local funding source component is $20.000, the Ratio would be 20%. <br />A simple equation to answer this question from the Project Budget is <br />(Local Government + Other (if a local funding source)) / Project Total = <br />Distressed County Fund Matching Ratio (converted to a percentage) <br />Project Narrative (starts on page 3 of the application): Please answer each question and sub -question <br />completely. Incomplete applications will not be considered for funding. You may attach additional <br />information necessary to answer the questions as needed. <br />Special Instructions: Please review the following instructions as listed below for specific <br />questions in the Project Narrative. <br />Question 6: Please attach the pertinent sections of the agency's plans as listed with which the <br />application is consistent. <br />Question 9: Please attach a copy of any feasibility or predevelopment studies. <br />Question 11: You must include the key assumptions (if any) and their justifications, methodology, <br />and calculations upon which your businesses created/retained estimate is based. Simply providing a <br />
The URL can be used to link to this page
Your browser does not support the video tag.