Kittitas County Upper Road Maintenance Facility <br />Exhibit A - Scope of Work <br />January 8, 2017 <br />3.08 Cost Estimator. Engineers probable bid construction cost updating the schematic design <br />estimate to reflect project additions and alterations made at the 75% milestone. This cost <br />estimate will be used as the final cost estimate prior to project bid. <br />3.09 QA/QC. The project QA/QC lead will conduct a review of all 75% design milestone <br />documentation prior to submittal to the County. Review comments will be coordinated and <br />provided for consultant team members to incorporate into their drawing sets. This includes: <br />specifications, and building permit documentation. This may include review of county's <br />Division 01 specifications for coordination with the project. <br />Task 3 Meetings: <br />• Bi -weekly Consultant meetings with the County, up to four (4) meetings by teleconference using <br />Go -To Meeting, an hour in duration. <br />• Regular weekly team teleconferences, email and phone communication and coordination. <br />• Meetings required by regulatory agencies, up to two (2) meetings, an hour in duration for up to (3) <br />three team members. <br />• Phone meeting with building permit officials prior to building permit intake submittal, up to 1 -hour <br />duration meeting. <br />Task 3 Deliverables: <br />• Stamped, signed building permit documents, foundation calculations, and site grading permits <br />labeled as required by the Authority Having Jurisdiction, typically 'Permit Documents' or 'For <br />Permit' and building permit application. <br />• 75% coordination and review deliverables include: cost estimate, specifications nearly ready for <br />bid, in -progress drawing set. <br />Task 3 Assumptions: <br />• At the completion of Task 2 - Schematic Design, the County will evaluate the project cost estimate <br />and other project deliverables and elect whether to authorize subsequent design tasks and permit <br />submittals. KPG will not proceed with Task 3 until authorized in writing by Kittitas County. <br />• No design changes will be made following this task with the exception of notations and <br />coordination to comply with building permit officials. <br />• The County will provide formal review comments of a consolidated 75% in -progress drawing set <br />and specifications. <br />• All comments (including one round of permit comments) received during the submittal review will <br />be addressed on the next submittal. <br />• Deliverables of this task will be used by the County for submittal for Building Permit and Grading <br />Permits. No other permits are included within this Task. Consultant shall provide drawings and <br />calculations suitable for permit review and assist with application documentation. Pre-engineered <br />building elements will be noted as a 'Deferred Submittal' and will be submitted at a future date <br />following construction contract procurement. <br />• Members of the consultant team do not need to be present for building permit intake submittal, <br />the County will deliver permits for intake. <br />Page 17 Maintenance Facility Design Phase 1 KPG <br />