HomeMy WebLinkAboutStaffReport_Amend_IF_Contract KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS AGENDA STAFF REPORT AGENDA DATE: December 1, 2026 ACTION REQUESTED: Request to Approve the Resolution to Authorize Chair Signature on Amendment No. 4 to Professional Services Agreement with Inter-Fluve, Inc. for Lower Kittitas Reach Floodplain Reconnection Project Restoration Engineering, Design, and Permitting Services. ___________________________________________________________________________________ BACKGROUND: Resolution 2024-155 selected Inter-Fluve, Inc. for restoration engineering, design, and permitting services for the Lower Kittitas Reach Floodplain Reconnection Project and authorized the Public Works Water Resource Manager to negotiate and execute the professional services agreement. A contract amendment is needed to 1) extend the period of performance by 1 year, 2) add additional scope of work to conduct a phase 1 cultural resources survey, and 3) add $180,476 to the budget for the phase 1 cultural resources survey and additional required coordination, technical analysis, design support, and project management. This cost increase will be covered by grant funding from the Recreation and Conservation Office and Department of Ecology for the Design and Permitting of the Lower Kittitas Reach Floodplain Reconnection Project. INTERACTION: Public Works. RECOMMENDATION: Approve the Resolution to Authorize Chair Signature on Amendment No. 4 to Professional Services Agreement with Inter-Fluve, Inc. for Lower Kittitas Reach Floodplain Reconnection Project Restoration Engineering, Design, and Permitting Services. HANDLING: Return two (2) originals to Public Works. ATTACHMENTS: Resolution and Amendment No. 4 LEAD STAFF: Arden Thomas, Water Resource Program Manager. BOARD OF COUNTY COMMISSIONERS COUNTY OF KITTITAS STATE OF WASHINGTON RESOLUTION NO. ______________ RESOLUTION TO AUTHORIZE CHAIR SIGNATURE ON AMENDMENT NO. 4 TO PROFESSIONAL SERVICES AGREEMENT WITH INTER-FLUVE, INC. FOR LOWER KITTITAS REACH FLOODPLAIN RECONNECTION PROJECT RESTORATION ENGINEERING, DESIGN, AND PERMITTING SERVICES WHEREAS: Resolution 2024-155 selected Inter-Fluve, Inc. for restoration engineering, design, and permitting services for the Lower Kittitas Reach Floodplain Reconnection Project and authorized the Public Works Water Resource Manager to negotiate and execute the professional services agreement; and WHEREAS: Section 12 of the General Conditions of the contract authorizes modifications that are in writing and signed by each of the parties; and WHEREAS: Amendment No. 4 to Professional Services Agreement with Inter-Fluve, Inc. for Lower Kittitas Reach Floodplain Reconnection Project Restoration Engineering, Design, and Permitting Services is attached hereto and incorporated herein by this reference. NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners finds it in the best interest of the public to authorize Chair Signature on Amendment No. 4 to Professional Services Agreement with Inter-Fluve, Inc. for Lower Kittitas Reach Floodplain Reconnection Project Restoration Engineering, Design, and Permitting Services. DATED this 1st day of December 2026, at Ellensburg, Washington. BOARD OF COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON ________________________________ Brett Wachsmith, Chairman Attest: ☐ Clerk of the Board- Julie Kjorsvik ________________________________ Laura Osiadacz, Vice-Chairman ☐ Deputy Clerk of the Board- Mandy Buchholz _______________________________ ________________________________ Jeff Leichleiter, Commissioner Professional Services Agreement Amendment No. 4 Lower Kittitas Reach Floodplain Project Page 1 AMENDMENT NO. 4 TO PROFESSIONAL SERVICES AGREEMENT WITH INTER-FLUVE, INC. FOR LOWER KITTITAS REACH FLOODPLAIN RECONNECTION PROJECT RESTORATION ENGINEERING, DESIGN, AND PERMTTING SERVICES The terms and provisions of the Agreement for Professional Services executed on September 13, 2024 apply herein unless otherwise specifically revised. Amendment to Project Schedule The contract is extended to December 31, 2027 and the project schedule is revised as follows: Task Original Schedule Revised Schedule Draft Final Design (90%) April 30, 2026 December 31, 2026 Final (100%) Design September 30, 2026 April 23, 2027 Environmental Permitting January 2026 - December 2026 July 2026 December 2027 CLOMR Submitted May 31, 2026 February 28, 2027 Response to Permitting/CLOMR Questions Through December 31, 2026 Through December 31, 2027 Contract Completion December 31, 2026 December 31, 2027 Amendment to Project Scope The scope of work is revised as follows: A. Additional Design Services by Inter-Fluve: Additional coordination, technical analysis, design support, project management, and related services are added to support planting plan development, final design coordination, cultural resources coordination, and project delivery requirements, as described in this amendment. B. Cultural Resources Survey by HRA The scope of work is further amended to include a cultural resources pedestrian survey to be performed by HRA in accordance with the scope of work attached as Exhibit A. Amendment to Project Budget The project budget is increased by $180,476, from $984,184 to $1,164,660. A budget breakdown for the amendment is provided below. Professional Services Agreement Amendment No. 4 Lower Kittitas Reach Floodplain Project Page 2 Reason for Amendment: This amendment includes two components: Additional Design Services by Inter-Fluve: This contract amendment covers additional coordination, specification development, technical analysis, and design support necessary to advance planting plan development in collaboration with Mid-Columbia Fisheries Enhancement Group (MCFEG) as the project progresses through final design. Previous contract amendments addressed similar coordination and technical support needs, and these have continued to evolve as the project progresses. In addition, the project schedule has extended beyond the duration originally anticipated during contract development, resulting in an increased need for project management, team coordination, meeting participation, and ongoing design support reflecting landowner needs and phased construction logistics. Additional effort has also been required to support cultural resources planning and coordination activities led by HRA. This amendment will support ongoing coordination with MCFEG and the broader project team, including meetings, communications, technical review, data analysis, project management, and the development and delivery of design support materials necessary to refine the planting plan and support its successful integration with the overall restoration design. This amendment will also include assistance with the development of technical specifications for revegetation, support for cultural resources coordination efforts, and continued project management associated with the extended design schedule. Specific amendment tasks include the following: Meetings and coordination with MCFEG regarding planting plan integration. Analysis for supporting planting plan, including development of custom relative elevation models, GIS analysis for depth-to-groundwater calculations, GIS-based Professional Services Agreement Amendment No. 4 Lower Kittitas Reach Floodplain Project Page 3 mapping, processing of model outputs for vegetation-specific flows, and other supporting analyses. AutoCAD drafting support including preparation of standalone revegetation planset, typical drawings and iterative coordination with MCFEG staff to customize details for site-specific conditions. Assistance to MCFEG with development of planting plan technical specifications. Assistance to MCFEG with determining access and maintenance plan for plantings. Meetings and coordination with HRA, MCFEG, BLM, RCO, and County staff to inform and refine the needs for cultural resources work related to early action plantings and agency requirements. Technical support to HRA related to cultural resources planning and coordination, including assistance with development and review of the Cultural Resources Monitoring Work Plan, coordination of project information, responses to data requests, GIS and mapping support, and participation in meetings related to cultural resources permitting and compliance. Additional design iterations to account for landowner requests. Additional coordination and design work to prepare for 2-year phased construction approach. Project management, team coordination, meeting participation, scheduling, budget tracking, and administrative support associated with continued design development and the extended project schedule. Cultural Resources Survey by HRA: Additional cultural resources services are required to support project permitting and compliance efforts. This amendment includes funding for HRA to complete a cultural resources pedestrian survey and associated deliverables as described in Exhibit A. APPROVED: Inter-Fluve, Inc. Kittitas County Signature of Signatory Date __________ Date_______________ Print Name of Signatory Print Name of Signatory EXHIBIT A Lower Kittitas Floodplain Reconnection and Restoration Project-Pedestrian Survey October 16, 2026 The prices and schedule of this SOW expire after 30 calendar days. 1 Scope of Work: Lower Kittitas Floodplain Reconnection and Restoration Project- Pedestrian Survey Historical Research Associates, Inc. (HRA), is pleased to submit this proposal to Floyd Snider to provide pedestrian survey investigations for the Lower Kittitas Floodplain Reconnection and Restoration Project. The project is located along the Yakima River approximately 2 miles (mi) south of Ellensburg, Kittitas County, Washington and will require a permit from the U.S. Army Corps of Engineers (USACE), making it subject to Section 106 of the National Historic Preservation Act (NHPA) and its implementing regulations (36 CFR Part 800). The project area is located on Kittitas County- and Bureau of Land Management (BLM)-owned property located along 2.7 mi of the Yakima River between the Hansen Gravel Mine Pits and Ringer Loop Rd. The study area totals 454.3 acres (ac) and includes all access, laydown and staging, and planting and restoration areas. The tasks scoped within this document will include background research and fieldwork authorization coordination with BLM, pedestrian survey, limited subsurface sampling, resource recording and National Register of Historic Places (NRHP) evaluations (when possible), and reporting. HRA prepared a project work plan that analyzed previous cultural resource efforts within the study area in order to make recommendations regarding the survey acreage; based on these efforts, the recommended survey acreage was reduced to avoid redundant efforts. Areas considered sufficiently surveyed under current methodological standards, where no additional archaeological survey is anticipated, total 105 acres within the current study area. An additional 59 acres of the study area is currently under water or within active waterways. The total acreage proposed for cultural resources pedestrian survey totals 290 ac. HRA will also conduct limited subsurface sampling (shovel probing) to aid in the identification of landforms with the potential to contain subsurface deposits. The methods to be used for the background research and permitting, fieldwork, and reporting are provided in the project work plan. Lower Kittitas Floodplain Reconnection and Restoration Project-Pedestrian Survey October 16, 2026 The prices and schedule of this SOW expire after 30 calendar days. 2 Cost and Assumptions total $99,901, to be billed on a time and materials basis. Table 1. Cost Breakdown. Base Task Labor Directs Total Project administration and coordination $6,204 $0 $6,204 Background research and BLM Fieldwork Authorization $15,904 $0 $15,904 Fieldwork $40,309 $10,694 $51,003 Reporting $26,790 $0 $26,790 Total $89,207 $10,694 $99,901 from which may require a scope or cost modification: Review feedback of the project work plan from affected Tribes and involved agencies will not change the survey acreage total. A fieldwork authorization request will need to be applied for and granted by the BLM before cultural survey work may be conducted on their administered lands, if necessary. There are five known undocumented archaeological resources within the study area, and HRA will record up to two additional cultural resources (built environment, sites, or isolates) during survey and evaluate them to make recommendations for NRHP eligibility (when possible). HRA assumes access to all areas of the study area will be granted at the same time and that pedestrian survey and site recording will require one mobilization for this work. assessing impacts to Traditional Cultural Properties (TCPs), Traditional Cultural Landscapes, and/or Historic Properties of Religious and Cultural Significance to Tribes (HPRCST), nor the identification of human remains. This cost estimate and schedule is valid for up to 30 days. Any delays in accepting the bid and executing a contract could result in changes to the cost estimate and schedule. Lower Kittitas Floodplain Reconnection and Restoration Project-Pedestrian Survey October 16, 2026 The prices and schedule of this SOW expire after 30 calendar days. 3 The project will be completed in 2026 using current 2026 labor rates. If the project extends into the 2027 calendar year , a cost modification may be required. HRA rates will automatically adjust each calendar year. Client will provide access to the property, coordinate safe access to the project area, clear any modern debris that obscures the ground surface, and provide a line of communication with safety personnel while HRA conducts field efforts, as needed and appropriate. Field investigations associated with shovel probes will require utility locates. HRA will coordinate public utility locates only. Should private locates be advisable, a scope modification may be required. Field investigations may necessitate special accommodations to ensure the health and safety of our staff. HRA reserves the right to delay field investigations for a reasonable amount of time due to health and safety- related impediments beyond our control, for example, extreme weather, mandates restricting travel, or outbreaks of contagion in the project area that put our staff at elevated health and safety risks. HRA will remain in close contact with the client throughout the fieldwork planning and execution stages to ensure any potential delays are communicated early, thoroughly, and with complete transparency. Soils and sediments in the project vicinity are not known to have increased likelihoods of containing regulated hazardous materials. As a result, this SOW assumes that no HAZWOPER training is required; that personal protective equipment (PPE) beyond basic Level D protection is not required; and that a HAZWOPER-level HASP will not be necessary. If conditions change and/or these items are required, HRA will approach the client for a change order and will be given up to 10 days to prepare a HAZWOPER HASP. If a HAZWOPER HASP is needed, the client will furnish all information necessary for contracted industrial hygienist to prepare the document within five days. HRA will excavate up to 20 shovel probes. No artifacts will be collected. There will be no in-person meetings, except for on-location meetings that may occur during monitoring. Consultation meetings with Tribes, DAHP, or other agencies will be virtual. No human remains, archaeological resources, or potential archaeological resources requiring additional investigations, permits, or treatment will be investigated under this contract. Any additional archaeological investigation Lower Kittitas Floodplain Reconnection and Restoration Project-Pedestrian Survey October 16, 2026 The prices and schedule of this SOW expire after 30 calendar days. 4 contract modification or new contract. Ready for signature - Professional Services Agr eement_Interfluve_AmendmentNo4_111826 Final Audit Report 2026-11-19 Created: 2026-11-19 By: Denise Scheel (dscheel@interfluve.com) Status: Signed Transaction ID: CBJCHBCAABAAAD4FMEFDIV-4EIpwbAv2_QrWomian_Ze "Ready for signature - Professional Services Agreement_Interflu ve_AmendmentNo4_111826" History Document created by Denise Scheel (dscheel@interfluve.com) 2026-11-19 - 6:24:57 PM GMT Document emailed to Jonathon Kusa Qkusa@interfluve.com) for signature 2026-11-19 - 6:26:50 PM GMT Email viewed by Jonathon Kusa (jkusa@interfluve.com) 2026-11-19 - 9:53:00 PM GMT -o Document e-signed by Jonathon Kusa (jkusa@interfluve.com) Signature Date: 2026-11-19 - 9:53:19 PM GMT - Time Source: server - Signature Appearance Selected: IMAGE Agreement completed. 2026-11-19 - 9:53:19 PM GMT Adobe Acrobat Sign