ACTION REQUESTED: Request to Approve the Resolution to Authorize Chair
Signature on Amendment No. 4 to Professional Services
Agreement with Inter-Fluve, Inc. for Lower Kittitas Reach
Floodplain Reconnection Project Restoration Engineering,
Design, and Permitting Services.
___________________________________________________________________________________
BACKGROUND: Resolution 2024-155 selected Inter-Fluve, Inc. for
restoration engineering, design, and permitting services for
the Lower Kittitas Reach Floodplain Reconnection Project
and authorized the Public Works Water Resource Manager
to negotiate and execute the professional services
agreement. A contract amendment is needed to 1) extend
the period of performance by 1 year, 2) add additional
scope of work to conduct a phase 1 cultural resources
survey, and 3) add $180,476 to the budget for the phase 1
cultural resources survey and additional required
coordination, technical analysis, design support, and project
management. This cost increase will be covered by grant
funding from the Recreation and Conservation Office and
Department of Ecology for the Design and Permitting of
the Lower Kittitas Reach Floodplain Reconnection Project.
INTERACTION: Public Works.
RECOMMENDATION: Approve the Resolution to Authorize Chair Signature on
Amendment No. 4 to Professional Services Agreement with
Inter-Fluve, Inc. for Lower Kittitas Reach Floodplain
Reconnection Project Restoration Engineering, Design, and
Permitting Services.
HANDLING: Return two (2) originals to Public Works.
ATTACHMENTS: Resolution and Amendment No. 4
LEAD STAFF: Arden Thomas, Water Resource Program Manager.
BOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS
STATE OF WASHINGTON
RESOLUTION
NO. ______________
RESOLUTION TO AUTHORIZE CHAIR SIGNATURE ON AMENDMENT NO. 4 TO
PROFESSIONAL SERVICES AGREEMENT WITH INTER-FLUVE, INC. FOR LOWER
KITTITAS REACH FLOODPLAIN RECONNECTION PROJECT RESTORATION
ENGINEERING, DESIGN, AND PERMITTING SERVICES
WHEREAS: Resolution 2024-155 selected Inter-Fluve, Inc. for restoration engineering, design, and
permitting services for the Lower Kittitas Reach Floodplain Reconnection Project and
authorized the Public Works Water Resource Manager to negotiate and execute the
professional services agreement; and
WHEREAS: Section 12 of the General Conditions of the contract authorizes modifications that are in
writing and signed by each of the parties; and
WHEREAS: Amendment No. 4 to Professional Services Agreement with Inter-Fluve, Inc. for Lower
Kittitas Reach Floodplain Reconnection Project Restoration Engineering, Design, and
Permitting Services is attached hereto and incorporated herein by this reference.
NOW, THEREFORE BE IT RESOLVED that the Board of County Commissioners finds it in the best
interest of the public to authorize Chair Signature on Amendment No. 4 to Professional Services
Agreement with Inter-Fluve, Inc. for Lower Kittitas Reach Floodplain Reconnection Project Restoration
Engineering, Design, and Permitting Services.
DATED this 1st day of December 2026, at Ellensburg, Washington.
BOARD OF COUNTY COMMISSIONERS
KITTITAS COUNTY, WASHINGTON
________________________________
Brett Wachsmith, Chairman
Attest:
☐ Clerk of the Board- Julie Kjorsvik ________________________________
Laura Osiadacz, Vice-Chairman
☐ Deputy Clerk of the Board- Mandy Buchholz
_______________________________ ________________________________
Jeff Leichleiter, Commissioner
Professional Services Agreement Amendment No. 4 Lower Kittitas Reach Floodplain Project
Page 1
AMENDMENT NO. 4
TO
PROFESSIONAL SERVICES AGREEMENT
WITH INTER-FLUVE, INC.
FOR LOWER KITTITAS REACH FLOODPLAIN RECONNECTION PROJECT
RESTORATION ENGINEERING, DESIGN, AND PERMTTING SERVICES
The terms and provisions of the Agreement for Professional Services executed on
September 13, 2024 apply herein unless otherwise specifically revised.
Amendment to Project Schedule
The contract is extended to December 31, 2027 and the project schedule is revised as
follows:
Task Original Schedule Revised Schedule
Draft Final Design (90%) April 30, 2026 December 31, 2026
Final (100%) Design September 30, 2026 April 23, 2027
Environmental Permitting January 2026 - December 2026 July 2026 December 2027
CLOMR Submitted May 31, 2026 February 28, 2027
Response to Permitting/CLOMR
Questions
Through December 31, 2026 Through December 31, 2027
Contract Completion December 31, 2026 December 31, 2027
Amendment to Project Scope
The scope of work is revised as follows:
A. Additional Design Services by Inter-Fluve:
Additional coordination, technical analysis, design support, project management, and
related services are added to support planting plan development, final design
coordination, cultural resources coordination, and project delivery requirements, as
described in this amendment.
B. Cultural Resources Survey by HRA
The scope of work is further amended to include a cultural resources pedestrian
survey to be performed by HRA in accordance with the scope of work attached as
Exhibit A.
Amendment to Project Budget
The project budget is increased by $180,476, from $984,184 to $1,164,660. A budget
breakdown for the amendment is provided below.
Professional Services Agreement Amendment No. 4 Lower Kittitas Reach Floodplain Project
Page 2
Reason for Amendment:
This amendment includes two components:
Additional Design Services by Inter-Fluve:
This contract amendment covers additional coordination, specification development,
technical analysis, and design support necessary to advance planting plan development
in collaboration with Mid-Columbia Fisheries Enhancement Group (MCFEG) as the
project progresses through final design. Previous contract amendments addressed
similar coordination and technical support needs, and these have continued to evolve
as the project progresses.
In addition, the project schedule has extended beyond the duration originally anticipated
during contract development, resulting in an increased need for project management,
team coordination, meeting participation, and ongoing design support reflecting
landowner needs and phased construction logistics. Additional effort has also been
required to support cultural resources planning and coordination activities led by HRA.
This amendment will support ongoing coordination with MCFEG and the broader project
team, including meetings, communications, technical review, data analysis, project
management, and the development and delivery of design support materials necessary
to refine the planting plan and support its successful integration with the overall
restoration design. This amendment will also include assistance with the development
of technical specifications for revegetation, support for cultural resources coordination
efforts, and continued project management associated with the extended design
schedule.
Specific amendment tasks include the following:
Meetings and coordination with MCFEG regarding planting plan integration.
Analysis for supporting planting plan, including development of custom relative
elevation models, GIS analysis for depth-to-groundwater calculations, GIS-based
Professional Services Agreement Amendment No. 4 Lower Kittitas Reach Floodplain Project
Page 3
mapping, processing of model outputs for vegetation-specific flows, and other
supporting analyses.
AutoCAD drafting support including preparation of standalone revegetation
planset, typical drawings and iterative coordination with MCFEG staff to
customize details for site-specific conditions.
Assistance to MCFEG with development of planting plan technical specifications.
Assistance to MCFEG with determining access and maintenance plan for
plantings.
Meetings and coordination with HRA, MCFEG, BLM, RCO, and County staff to
inform and refine the needs for cultural resources work related to early action
plantings and agency requirements.
Technical support to HRA related to cultural resources planning and
coordination, including assistance with development and review of the Cultural
Resources Monitoring Work Plan, coordination of project information, responses
to data requests, GIS and mapping support, and participation in meetings related
to cultural resources permitting and compliance.
Additional design iterations to account for landowner requests.
Additional coordination and design work to prepare for 2-year phased
construction approach.
Project management, team coordination, meeting participation, scheduling,
budget tracking, and administrative support associated with continued design
development and the extended project schedule.
Cultural Resources Survey by HRA:
Additional cultural resources services are required to support project permitting and
compliance efforts. This amendment includes funding for HRA to complete a cultural
resources pedestrian survey and associated deliverables as described in Exhibit A.
APPROVED:
Inter-Fluve, Inc. Kittitas County
Signature of Signatory
Date __________ Date_______________
Print Name of Signatory Print Name of Signatory
EXHIBIT A
Lower Kittitas Floodplain Reconnection and Restoration Project-Pedestrian Survey
October 16, 2026
The prices and schedule of this SOW expire after 30 calendar days. 1
Scope of Work: Lower Kittitas Floodplain
Reconnection and Restoration Project-
Pedestrian Survey
Historical Research Associates, Inc. (HRA), is pleased to submit this proposal to
Floyd Snider to provide pedestrian survey investigations for the Lower Kittitas
Floodplain Reconnection and Restoration Project. The project is located along the
Yakima River approximately 2 miles (mi) south of Ellensburg, Kittitas County,
Washington and will require a permit from the U.S. Army Corps of Engineers
(USACE), making it subject to Section 106 of the National Historic Preservation Act
(NHPA) and its implementing regulations (36 CFR Part 800).
The project area is located on Kittitas County- and Bureau of Land Management
(BLM)-owned property located along 2.7 mi of the Yakima River between the
Hansen Gravel Mine Pits and Ringer Loop Rd. The study area totals 454.3 acres (ac)
and includes all access, laydown and staging, and planting and restoration areas.
The tasks scoped within this document will include background research and
fieldwork authorization coordination with BLM, pedestrian survey, limited
subsurface sampling, resource recording and National Register of Historic Places
(NRHP) evaluations (when possible), and reporting.
HRA prepared a project work plan that analyzed previous cultural resource efforts
within the study area in order to make recommendations regarding the survey
acreage; based on these efforts, the recommended survey acreage was reduced to
avoid redundant efforts. Areas considered sufficiently surveyed under current
methodological standards, where no additional archaeological survey is anticipated,
total 105 acres within the current study area. An additional 59 acres of the study
area is currently under water or within active waterways. The total acreage
proposed for cultural resources pedestrian survey totals 290 ac. HRA will also
conduct limited subsurface sampling (shovel probing) to aid in the identification of
landforms with the potential to contain subsurface deposits. The methods to be
used for the background research and permitting, fieldwork, and reporting are
provided in the project work plan.
Lower Kittitas Floodplain Reconnection and Restoration Project-Pedestrian Survey
October 16, 2026
The prices and schedule of this SOW expire after 30 calendar days. 2
Cost and Assumptions
total $99,901, to be billed on a time and
materials basis.
Table 1. Cost Breakdown.
Base Task Labor Directs Total
Project administration and coordination $6,204 $0 $6,204
Background research and BLM Fieldwork
Authorization $15,904 $0 $15,904
Fieldwork $40,309 $10,694 $51,003
Reporting $26,790 $0 $26,790
Total $89,207 $10,694 $99,901
from which may require a scope or cost modification:
Review feedback of the project work plan from affected Tribes and involved
agencies will not change the survey acreage total.
A fieldwork authorization request will need to be applied for and granted by
the BLM before cultural survey work may be conducted on their administered
lands, if necessary.
There are five known undocumented archaeological resources within the
study area, and HRA will record up to two additional cultural resources (built
environment, sites, or isolates) during survey and evaluate them to make
recommendations for NRHP eligibility (when possible).
HRA assumes access to all areas of the study area will be granted at the
same time and that pedestrian survey and site recording will require one
mobilization for this work.
assessing impacts to Traditional Cultural Properties (TCPs), Traditional
Cultural Landscapes, and/or Historic Properties of Religious and Cultural
Significance to Tribes (HPRCST), nor the identification of human remains.
This cost estimate and schedule is valid for up to 30 days. Any delays in
accepting the bid and executing a contract could result in changes to the cost
estimate and schedule.
Lower Kittitas Floodplain Reconnection and Restoration Project-Pedestrian Survey
October 16, 2026
The prices and schedule of this SOW expire after 30 calendar days. 3
The project will be completed in 2026 using current 2026 labor rates. If the
project extends into the 2027 calendar year , a cost
modification may be required. HRA rates will automatically adjust each
calendar year.
Client will provide access to the property, coordinate safe access to the
project area, clear any modern debris that obscures the ground surface, and
provide a line of communication with safety personnel while HRA conducts
field efforts, as needed and appropriate.
Field investigations associated with shovel probes will require utility locates.
HRA will coordinate public utility locates only. Should private locates be
advisable, a scope modification may be required.
Field investigations may necessitate special accommodations to ensure the
health and safety of our staff. HRA reserves the right to delay field
investigations for a reasonable amount of time due to health and safety-
related impediments beyond our control, for example, extreme weather,
mandates restricting travel, or outbreaks of contagion in the project area
that put our staff at elevated health and safety risks. HRA will remain in close
contact with the client throughout the fieldwork planning and execution
stages to ensure any potential delays are communicated early, thoroughly,
and with complete transparency.
Soils and sediments in the project vicinity are not known to have increased
likelihoods of containing regulated hazardous materials. As a result, this SOW
assumes that no HAZWOPER training is required; that personal protective
equipment (PPE) beyond basic Level D protection is not required; and that a
HAZWOPER-level HASP will not be necessary. If conditions change and/or
these items are required, HRA will approach the client for a change order and
will be given up to 10 days to prepare a HAZWOPER HASP. If a HAZWOPER
HASP is needed, the client will furnish all information necessary for
contracted industrial hygienist to prepare the document within five days.
HRA will excavate up to 20 shovel probes.
No artifacts will be collected.
There will be no in-person meetings, except for on-location meetings that
may occur during monitoring. Consultation meetings with Tribes, DAHP, or
other agencies will be virtual.
No human remains, archaeological resources, or potential archaeological
resources requiring additional investigations, permits, or treatment will be
investigated under this contract. Any additional archaeological investigation
Lower Kittitas Floodplain Reconnection and Restoration Project-Pedestrian Survey
October 16, 2026
The prices and schedule of this SOW expire after 30 calendar days. 4
contract modification or new contract.
Ready for signature - Professional Services Agr
eement_Interfluve_AmendmentNo4_111826
Final Audit Report 2026-11-19
Created: 2026-11-19
By: Denise Scheel (dscheel@interfluve.com)
Status: Signed
Transaction ID: CBJCHBCAABAAAD4FMEFDIV-4EIpwbAv2_QrWomian_Ze
"Ready for signature - Professional Services Agreement_Interflu
ve_AmendmentNo4_111826" History
Document created by Denise Scheel (dscheel@interfluve.com)
2026-11-19 - 6:24:57 PM GMT
Document emailed to Jonathon Kusa Qkusa@interfluve.com) for signature
2026-11-19 - 6:26:50 PM GMT
Email viewed by Jonathon Kusa (jkusa@interfluve.com)
2026-11-19 - 9:53:00 PM GMT
-o Document e-signed by Jonathon Kusa (jkusa@interfluve.com)
Signature Date: 2026-11-19 - 9:53:19 PM GMT - Time Source: server - Signature Appearance Selected: IMAGE
Agreement completed.
2026-11-19 - 9:53:19 PM GMT
Adobe Acrobat Sign