HomeMy WebLinkAboutSigned change order^-,w Washlngton State Department of Transponailon Ghange Order Contract Number 22-000186-09 Contract Title Cle Elum Transfer Station FederalAid Number N/A Change Order Number 2 Change Description Additional work for white goods loading and miscellaneous additional work 811912026 Prime Contractor / Design-Builder Gibson and Son Road Building / Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications f] Cnange proposed by Contractor / Design-Builder m 101 - Adjust Manhole and Gas Valve At New r Lump Sum price of .850.00 Two additional working days. The manhole and gas valve within the new intersection were not shown in the plans. Add Bid ltem 102 - Construct White Goods Loading Dock for Lump Sum price of $53,020 5 additional working days The designed white goods loading area was deleted by Addendum due to changes in the way materials were handled and loaded. The revised design and construction added via change order. Add Bid ltem 103 - Quarry Spalls 48.01 tons at$52.80 per ton Quarry spalls added at the direction of engineer to control access. Add Bid ltem 104 - CB Type 1 at Tank lnlet for the lump sum price of $3,000 2 additional working days. lnstall a Type 1 CB in inlet drain line. Add Bid ltem 105 - Add 1 additional Junction Box for the illumination system for the lump sum price of $550.00 Add Bid ltem 106 - Relocate existing ecology blocks as directed and placement of excess tank excavation around perimeter of white goods area as directed for the lump sum price of $3,693.75. 1 addt. workday. $760,349.84 WSDOT Form 140-005 Revised 04120'15 Verbal Approval Given By Dave Allen VerbalApproval Date 7l'1126 Working Days +l 10 Original Contract Amount $683,798.03 Current Contract Amount $687,701.16 c.o. $72,648.68 Aooroval Recommended jfu*f /,/^- / Approved Project Engineer 8t1912026 Authority per C,A, Date Date Approval Recommended Ko ry G i bso n Bf$il;.$i#:;;*:'-., By Prime Contractor 9/L0/2026 Date Page 1