HomeMy WebLinkAboutExecuted Change OrderFederal Aid Number
N/AElectrical Improvements Kittitas Counry Event Center
Contract TitleContract Number
scJ 22-000i86-3
Date
9lt'712026
Change Description
Tree Removal and Trench Modilications
Change Order Number
1
Prime Conhactor / Design-Builder
Belsaas and Smith Construction Inc
-W H:;:ltg:T, ?Hl,,,oorrarion Change Order
/ Ordered by Engineer under the terms of Section 1-A4.4 of the Standard Specifications
f] Cnange proposed by Contractor / Design-Builder
Verbal Approval Given By
Patti Stacey
Verbal Approval Date Working Days +l
7
Original Conkact Amount
$102,927.82
Current Contract Amount
$t02,927.82
Est. Net Change This C.O.
$20,s91.i0
Est. ContractAmount
$ 123,5 18.93
WSDOTFoTm 140-005
Revised 04120'15
Change Description
Change Order t consists of the following:
Tree Removal (RFP I Revision I - attached)
An existilg tree that has been designatecl by the City of Ellensburg Arborist as a hazard tree and has been
recommenclecl to be removed. The r-esult of this tree removal is recluction in public safety, reduction in
requirecl utility easements on the CoLrnty property, and a more efiicient utility trench. Per RFP l, Option I
(stump ."*o,.,rol) will be incorporatecl into this project as ciescribed in RFP l. Addilional 7 working days (2
for tree removal and 5 for "g"i,"y
coorclinationj woulcl be added to the Contract Working Days based on an
NTP of 911412026.
A new bid item (#14) will be adcled to the contract "Tree Removal" Unit: Lump Sum, Unit Cost: $18,918'00
(+ WSST), QTY: 1, Total Cost: $18,918.00 (+ WSST) =520,544.95
SEE NEXT PAGE
,/ Approval Recommended Approved
Date
I
q
Approval Recommended
qlBI o ?-(e
Date
Other Approval As Required
Signature
Representing
Date
Page 1
Change Order Number
IElectrical Improvements Kittitas County Event Center
Contract TitleContract Number
scJ 22-000186-3
Change Description Cont.
Trench Modifications (RFP 2):
Modifications to the as award trench width requirements and utilities to be incoqporated have been changed
(addition of gas and other private utilities). See Rfp 2 for frrther details' The net change in the deletion of BI
iz (s-+g,eoo.00)and the addition of BI 15,16,17 (549,642.50) is ($a2.50 + wssT)'
Bid Item
12 UTILITY TRENCH LF 800 Unit cost: -$62.00 Total Cost: -$49,600'00
l5
T6
t7
UTILITY TRENCH A,B,C,F,G 24'' WGAS LF 518
UTILITY TRENCH D I2'' LF 278
UTILITY TRENCH E 18" WGAS LF 59
Unit cost: $60.50 Total Cost: $31,339.00
Unitcost: $53.00 Total Cost: $14,734'00
Unit cost: $60,5 Total Cost: $3,569'50
rotal cost change(wio,l1?
11t"1?
WSDOT Form 140-005
Revisecl O4l2A15
Page 2