Loading...
HomeMy WebLinkAboutChange Order Executed DocumentKittitas County Sotid Waste 925 lndustriaI Way Ettensburg, WA 98926 October 6,2026 Belsaas and Smith Construction 103 East 4th Avenue, Suite 209 Eltensburg, WA 98926 Project: Lower Vattey Transfer, Change Order No. 16 Mr. Netson, I am writing to formatty acknowtedge and award change order number 16 for the foltowing Change Order Proposats (COP): UUP #/ / Uompost Fencing COP #78 Additionat MRWWind Watt Bracing Change Order No. 16 Totat Base Bid and Additive A2 Additive A1 Change Order No. 2 Change Order No.3 Change Order No.4 Change Order No.5 Change Order No. 6 Change Order No.7 Change Order No. B Change Order No. 9 Change Order No. 10 Change Order No. 11 Change Order No. 12 Change Order No. 13 Change Order No. 14 Change Order No. 15 Change Order No. 16 $t o,+gg.ao $10,s19.29 $27,012.75 $18,441,939.80 $642,ooo.oo <$11,7s4.08> <$28,o41.41> $145,224.93 $233,662.44 <$24,0s1.84> $go,+gg.za $loL,qol.zq $127,737.OO $46,392.94 $49,209.69 $142,300.43 $og,o+a.ot $123,878.51 $261,511.94 $27,012.75 $20,509,755.42 $1.758.348.03 SubtotaI WSST Total $22.268,103.45 -4. Ptease consider this letter as our formaI acceptance of the change order. We took forward to successfuLty completing this project together with these agreed-upon adjustments. Thank you, Bryan Nelson secretary Betsaas and Smith Construction 1 03 E 4th Ave # 209 Etlensburg, WA 98926 Brett ith Chair, Board of County Commissioners Kittitas County 205 W Sth Ave #1 08 Ettensburg WA 98926 p.o. Box 926 / 103 EAST 4rH AVE, SUITE 209 ELLENSBURG, WA 98926 509-925-9747 FAX: 509-952-3031 brandon@belsmith.com r!LtAto0330r{ September 3,2026 Re: ASP Added Fencing Per the description below, we present the following change order proposal #77 (COP#771 COP #77 includes all the labor and materials needed to construct the additional fencing between the ASP and ponds. The proposed fencing will be an identical match to the existing perimeter fence color and installation methods. Total cost added to contract:$10,+91.45+wssr Time extension required: 0 Days Sincerely, Riley Eres, Belsaas & Smith Construction