My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COP78 MRW North Wall Structural Revision
>
Meetings
>
2026
>
10. October
>
2026-10-06 10:00 AM - Commissioners' Agenda
>
COP78 MRW North Wall Structural Revision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2026 12:15:24 PM
Creation date
10/1/2026 12:14:53 PM
Metadata
Fields
Template:
Meeting
Date
10/6/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order No. 16 for the New Transfer Station
Order
3
Placement
Consent Agenda
Row ID
149866
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 <br /> ELLENSBURG, WA 98926 <br /> 509-925-9747 FAX: 509-962-3031 <br /> brandon@belsmith.com <br /> <br /> <br /> <br /> <br />Sept 9,2026 <br /> <br />Re: MRW North Wall Structural Revision <br /> <br />Per the description below, we present the following change order proposal #78 (COP#78). <br /> <br />COP #78 includes all the labor and materials needed to construct the additional structural <br />needs for the northern wall of the MRW Facility. The items included in this proposal are as <br />shown below. <br />• Box Beam and Wall Attachments <br />• All Columns and Wall Attachments <br />A more detailed cost breakdown is shown below along with the plans that we will be building <br />off. If you have any additional questions, please feel free to reach out. <br /> <br /> <br />Total cost added to contract: $10,519.29+WSST <br /> <br />Time extension required: 87 Calander Days. <br /> <br />These additional days extend the contract completion date from the current final contract day <br />of July 14th to October 9th. <br /> <br />If the required materials are ordered by Monday, September 14th, they are anticipated to be <br />received by September 24th. Following receipt of the materials, approximately two additional <br />weeks of labor will be required to complete the remaining work. <br /> <br />The remaining work consists of fabrication and installation of the box beam and columns, as <br />well as installation of the remaining metal siding. <br /> <br />Sincerely, <br /> <br /> <br /> <br />Riley Eres, <br />Belsaas & Smith Construction
The URL can be used to link to this page
Your browser does not support the video tag.