Laserfiche WebLink
<br />Kittitas County Solid Waste <br />925 Industrial Way <br />Ellensburg, WA 98926 <br /> <br />October 6, 2026 <br /> <br />Belsaas and Smith Construction <br />103 East 4th Avenue, Suite 209 <br />Ellensburg, WA 98926 <br />Project: Lower Valley Transfer, Change Order No. 16 <br /> <br />Mr. Nelson, <br /> <br />I am writing to formally acknowledge and award change order number 16 for the following Change <br />Order Proposals (COP): <br /> <br /> COP #77 Compost Fencing <br /> COP #78 Additional MRW Wind Wall Bracing <br /> <br />$16,493.46 <br />$10,519.29 <br /> <br /> <br />Change Order No. 16 Total $27,012.75 <br /> <br />Base Bid and Additive A2 $18,441,939.80 <br />Additive A1 $642,000.00 <br />Change Order No. 2 <$11,754.08> <br />Change Order No. 3 <$28,041.41> <br />Change Order No. 4 $145,224.93 <br />Change Order No. 5 $233,662.44 <br />Change Order No. 6 <$24,051.84> <br />Change Order No. 7 $96,439.74 <br />Change Order No. 8 <br />Change Order No. 9 <br />Change Order No. 10 <br />Change Order No. 11 <br />Change Order No. 12 <br />Change Order No. 13 <br />Change Order No. 14 <br />Change Order No. 15 <br />Change Order No. 16 <br />$104,401.24 <br />$127,737.00 <br />$46,392.94 <br />$49,209.69 <br />$142,300.43 <br />$68,044.01 <br />$123,878.51 <br />$261,511.94 <br />$27,012.75 <br /> <br />Subtotal $20,509,755.42 <br />WSST $1,758,348.03 <br /> <br />Total $22,268,103.45 <br /> <br />