Loading...
HomeMy WebLinkAboutSCJ On-Call Contract---+-> - Firm: Address: Telephone: Fax: and Client: Address: Telephone: Email: Date: Project Name Project No.: The terms and provisions of the Agreement for Professional Services apply herein unless otherwise specifically revised. AMENDMENT NO. 09 TO AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN Shea, Carr & Jewell, Inc (dba SCJ Alliance) 8730 Tallon Lane NE, Suite 200, Lacey, WA 98516 360-352-1465 360-352-1509 ('so") Kittitas County Kittitas County On-Call Consulting Services 205 W 5th Ave Suite 108, Ellensburg, WA 98926 patti.stacey@co. kittitas.wa.us ("Client") August t8,2026 Kittitas County On-Call- Ph 9 Cle Elum Transfer Station Tank Replacement 22-000186 Amendment Description andl or Reason: Update budeets for additional desisn services completed durins the desien phase and add Construction Administration. field inspection. and material testins services to the previous Bid Suooort ohase of the ntract Sep attached Scooe of Work. Contract Price Original Contract: Prior Amendments This Amendment: s 180,614.13 s 329,551.50 Time of Contract Original Contract: Prior Amendment This Amendment: NA NA 09.00 7 6 Total Contract:S slz,zlq.sz Approved By: SCJ Alliance By: Prin Kittitas Cou nty By Title ffttful/LTitle Date: o8t18t2026 Date 0-q I 0t rl*a --<>-ee- ->-->->SCJ AullRwcE CONSULTING SERVICES Exhibit A Scope of Work Amendment 9 Phase 9 Cle Elum Transfer Tank Replacement Kittitas County, WA Prepared For: Kittitas County Prepared By: Dan lreland, PE Date Prepared: August 12,2026 lntrodu ction: SCJ has prepared this amendment to the 2022 On-Call contract for the existing work task: Phase 9 Cle Elum Transfer Station Tank Replacement. This amendment supplements the following tasks with additional services requested or have exceeded the assumed or estimated durations beyond the existing scope of work and fee estimate. We estimate the construction to be completed by end of August 2O26 and project closeout process to be completed by October 3I,2026. Phase 9 Cle Elum Transfer Station Tank r Task 1- Preliminary Design r Task 4 - Final Construction Package Task I Preliminary Design Description of Previous Work Completed ond Compensated; The original scope of work assumed the project would be out to bid by September 2025. During the preliminary design phase, the duration of tasks exceeded the estimate based on tank vendors' response times to identify the correct type of tank for the project. This resulted in project management and additional time being required, reaching out to multiple vendors and requesting follow-ups that exceeded what was estimated. An additional 3 months of coordination/managing the preliminary design phase of the project, and 8 hours of coordination were required, compared to what was previously estimated. Task 4 Final Construction Package This amendment updates this task budget to incorporate the Cle Elum Transfer Station Driveway Project that was added to this project near the end of the project. This budget description explains the 1) Final Plans: After the review meeting by the County, SCJ will update the construction plans for finalization and bid advertisement. .- --.-111<'+ + SCJ ALLI.A,NCE CONSULT{NG SERVICES Amendment 9 August 12,2026 Page 2 of 4 2l Update Quantities / Cost Estimation: We will update the quantities and final engineers' estimates. This will be used for budgeting confirmation and comparison at bid opening. 3) Final Special Provisions: Final revisions and modifications to the special provisions and front- end bid documents. 4l White Goods Revised loading Facility t During the course of construction, the County identified an additional need at the Transfer Facility known as the "White Goods Loading Facility". SCJ was tasked with developing an additional design and change order package for the Contractor. This additional work consisted of the following: t Review loading dock design at Ellensburg facility. i Determination of design vehicle o Preliminary layout of dock utilizing Autoturn analysis for egress and exit o Review preliminary layout with client. o Update layout and Autotrun analysis per County input. r CAD design for loading facility, final location and grading. I Design and drafting of retaining wall, footings and reinforcing steel I Coordinating with Contractor and negotiating a change order for the added work. Task 5 Bidding and Construction Engineering Services This amendment describes the additional work that was added to this task during the time of bidding and adding construction administration services to the project. This project was estimated to start the week of May 3, 2026 and continue through September 2026. 1) Construction Phase Project Management: Progress updates, project setup, invoicing, and County coordination. Preconstruction Services: Bid tabulations and bid proposal review, pre-construction meeting. Office Engineering: Statements of intents prime and subcontractors, payroll requirements. s) Construction Observation: Periodic site visits to check construction. Answer contractor construction questions and respond to information requests. Construction meetings. Contract administration: Review and approve contractor material submittals, monitor and check force account work, measure and review work completed for pay requests, and process change orders. 6) Contract Closeout: Review project at completion and provide a punch list to contractor, project completion letters, and final record drawings. 2l 3) 4) 25 N Wenatchee Ave, Suite 238. Wenalchee, WA 98801 . Office 509.886.3265 r Fax 360.352.1509 ' scjalliance com +<>+?''+-'++ SCJ ALL:ANCE CONSULTIN(3 SERVICES Amendment 9 August 12,2A26 Page 3 of 4 Moterials Testing (CSI) Material testing of the Construction phase to review and confirm the materials use and placement. Construction Special lnspection (CSl) was used for these services as a subconsultant to SCJ. Tosk 6 1) U nd ersta n d i nglAssu m ptions 1) Advertising fees will be paid by the County directly. 2l We do not anticipate or estimate topographic surveys, cultural resources, or biological assessments. lf the project later identifies this need, we can add it as an amendment. 3) Construction Services for this project will be assessed at the time of bid award. The scope of those services will be added via addendum once they have been quantified. 4l Stormwater design is not required. 5) There are no other conveyance, mechanical, or infrastructure changes or updates to the system (or others) required outside of the existing tank. 6) We estimate restoring the project to its existing condition and use. 7) This estimate assumes one public bid and award process' Deliverables Preliminary Contract Plans. Preliminary Cost Estimate. City/County Plan submittal package. DOH Notification. Contract Plans. Special Provisions. Project Manual (PS&E). Addendum. Bid Tabulation. Bid Award Notification. Approved Bid Tabs - pdf Award Recommendation Letter - pdf Notice to Proceed - pdf Project ledger and signed Statements of Progress - pdf Construction material approvals - pdf Measurement and payment records - pdf Final signed change orders - pdf Final Record drawings - pdf Signed and stamped drawings for the white goods loading area - pdf 8) 1) 2l 3) 4l s) 5) 7l 8) e) 10) 11) 121. 13) 14l. 1s) 16) 17l 18) 25 N Wenatchee Ave, Suite 238. Wenatchee, WA 98801 r Office 509.886.3265 e Fax 360.352.1509 + sc;alliance cont {> ---<r?<t+e SCJ ALLI.ANCE CONSULTINO SERVICES Amendment 9 August 12,2026 Page 4 of 4 Updated Estimated Amendment Fee Time and Materials Not to Exceed without prior authorization Phese # Phase 9 Task 3 Task 4 Task 5 Phase TItle Cle Elum Transfer Tank Replacement Permitting Final Construction Package Amendment Amount s1,280 s5,3oo 52,tzo S34,910 s53,580 Task 6 Biddi and Construction Services Materials Testing (Construction Special lnspection) 53,690 10% Markup 5359 Subconsultonts Phase 99 Subconsultant Total Mileage Previous Budget Amendment Total Total Professional Services Budget for Transfer Station Project 059 s4 059 S2,1go S4,z7o S69,852 S62,109 S13t,s9t Reimbusables 25 N Wenatchee Ave, Suite 238 r Wenatchee, WA 98801 . Office 509.886.3265 e Fax 350.352.1"509. scjalliance.com