HomeMy WebLinkAboutSO Replacement AC UnitKITTITAS COUNTY
July 29th,2026
Hultz BHU
1111 FawcettAve
Suite 100
Tacoma, WA 98402
RE: Couilhouse Server Room - AC Replacement Task Order #2
At this time Kittitas County would like to accept the proposalfor the on-call services
contract per ExhibitA, Engineering Services Proposal, dated 6-17-2026.
Description:
Task 1 On Call Services for Design, Bid, CA & reimbursable expenses not to exceed
$28,765.
Please sign and return.
Kittitas nty Hultz BHU
(signed)(signed)
*u l*z
(printed name)
(date)
(printed name)
(date)
fF
3 LOL6
HULTaEBHU
engineers inc
June 17,2026
Kittitas County
205 W 5th Avenue, Suite 1-05
Ellensburg, WA 98926
Attention: CharlieSmith
Subject Courthouse Server Room - AC Replacement
Engineering Services Proposal
Dear Charlie:
Here is our proposal to provide engineering services for this project
Proiect Description
Replace two split system HVAC units serving the server room at the Courthouse. New unit will be same
size as the existing. Project will be publically bid.
Scope of Services
Design Phase: Provide field reviews, engineering, drawings, and specifications to allow for the work.
Construction cost estimates and updated schedules are included with each progress submittal. A 60%
progress set, 90% progress set, and final i:}O% (bid ready) set of submittals are included. We assume you will
provide us the Division 00 contract documents (bid form, contract, etc.).
Bid Phase: Attend the pre-bid meeting, respond to bidder questions, review substitution requests,
issue any required addenda, and review bids.
Construction Phase: Attend the pre-construction meeting, review product submittals, answer contractor
questions, conduct and attend virtual meetings during construction (assume 4), provide one site visit
during construction, review pay requests, provide one punchlist review, one punchlist back check, and
review project closeout documents (O&M manual, generatortest reports, etc.).
Proposed Fee
We propose to provide our services on an hourly charge basis, not to exceed our authorized fee without
your prior permission. Fee summary:
Engineering:
Discipline Design Bid CA Totals
Mechanical
Electrical
$1i.,3i.s
Sg,gss
52,095
s48s
58,015
s2,1oo
521.,425
So,++o
Total
Reimbursable
$27,865
'1 1 '1 1 Fawcett Avenue, Suite 100 . Tacoma, Washington 98402
T 253.383.3257 . F 253.383 3283 o general@hultzbhu.com
June L7,2O26
Kittitas County
Courthouse Server Room - AC Replacement
Engineering Services Proposa I
Page2
Mileage
Printing
Total Reimbursable
s soo
S roo
s eoo
Reimbursable costs will be billed as incurred in accordance with County requirements.
Total not-to-exceed fee with Reimbunable: S 2&765
See the attached for a list of expected engineering task and hours.
Preliminarv Schedule
Assuming a notice to proceed by July 15th, here is a preliminary schedule.
Task/Activitv Comoletion Date
NTP
60% Submittal
90% Submittal
Final Bid Set
Bid Set Released
Bids Due
Contractor NTP
HVAC Equipment On-Site
Substantial Completion
Final Acceptance
July 15,
August 5,
August 19,
August 29,
September 2,
September 23,
October 3,
Nowmber 14,
December 5,
December 19,
2026
2026
2026
2026
2026
2026
2026
2026
2026
2026
We appreciate this opportunity to work with you.
Sincerely,
Hultz IBHU Engineers lnc./-( H
Rick Hultz, PE
Principal
Attached: Estimated Tasks/Hours, 2 pages
HulE/BHU Engineers
Consulting Engineers
Proiect: Kittitas County Courthouse Server AC Units
Work: MechanicalEngineering
ENGINEERING HOURS (253) 383-3257
6t17 12026
Page 1
Task Principal
Assoc
Principal
sentor
Enor
Senior
Proi Mor
Projeci
Enqr
Project
Mgr
Senior
Desiqner
cAu
Tech Clerical
Design Phase Kick-Off ftileeting
Site Visit
Develop ACAD Background
G#Cover Sheet
lV#Legend/Notes
lV#Schedules
MFHVAC Plan
Mtt D€tail6
Specifications - Technical
Coordination
Prolect Schedule
Meetings
QC Review
Progress Submittal(s)
Cost Estimate(s)
Respond to Review Comments
Permit Forms
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
b
1
1
2
2
12
4
b
2
1
2
2
0.5
1
b
1
1
2
d
2
2
4
Hour Total 3.5 0 0 4A 0 22 4
Labor Hourlv Rate s250 00 $1 90.00 $1 75.00 $1 60.00 sl 50 00 $1 30.00 $1 10.00 s85.00
Labor Cost Sub-Totals $E75 00 $o $o s7.680 s0 $0 $2,420 $340
BID PHASE
Task Principal
Assoc
PrinciDal
Senior
Enqr
Senior
Prol Mqr
Project
Enqr
Prolect
Mgr
Senior
Desiqner
CAD
Tech Clerical
Pre-Bid l\ileeting
Substitution Request Review
Bidder Questions
Addenda 'l
6
2
I
1
Hour Total
50_00
0 0 0
50.00
0
130.00
0 1
$85.00
Labor Cost Sub-Totals $250 $0 $0
lt3!*-
$0
o I ou,uu
$1.760 $o $0 s0 $85
CONSTRUCTION PHASE
Task Princioal
Assoc
PrinciDal
Senior
Enqr
Senior
Proi lvlqr
P rol ect
Engr
P rolect
Mqr
Senior
Desiqner
CAD
Tech Clerical
Pre-Con Meeting
Submittal Reviews
Submittal Re-Reviews
Meetings (Virtual)
Site Visi (1)
RFI's
Pay Reviews
Punchlist
Backcheck
Closeout Review
0.5
1
1
0.5
5
I
2
6
5
a
2
1
1
4
1
1
1
Hour Totsl 0 0 0 4'l 0 7
Labor Hourlv Rate $250.00 $225.OO $1 90.00 $1 75.00 $1 60.00 sl 50.00 $1 30.00 $1 10.00 $85.00
Labor Cost Sub-.Totals $750 $0 $o $0 s6.560 $o $0 $1 10 $595
GOilSTRUCTION PH/
Tech I@
NIC = Not lncluded
Hultz/BHU Engineers
Consulting Engineers
Project: Kiftitas County Courthouse Server AC Units
Work: Electrical Engineering
ENGINEERING HOURS (253) 38s-3257
6t17t2026
Page:2
DESIGN PHASE
Task Principal
Assoc
Principal
senior
Enor
senror
Proi Mqr
Project
Enqr
Project
Mqr
Senior
Desiqner
LJAIf
Tech Clerical
Site Visit
Confirm Loads
E#-Le ge nd/General N otes
E#Power Plan(s)
EtlNew Panel Schedules
E#-New One Line
Specifi cations - Technical
Coordination
Meetings
QC Review
Progress Submittal(s)
Cost Estimate(s)
See Mechanical
0.5
Not lncluded
0.5
3
1
2
1
2
2
1
1
1
2
1
1
1
Hour Total 2 0 0 0 17 0 A 1
Labor Hourlv Rate $250.00 $225.00 $190.00 $'175.00 $160.00 s150.00 $130.00 $1 10.00 $85
Labor Cost Sub-Totals $500 $0 $0 $0 s2.720 0 $0 $550 $85
Task Principal
Assoc
Principal
Senior
Enqr
Senior
Proi Mqr
Project
Enqr
Prolect
Mqr
Senior
Desiqner
CAD
Tech Clerical
Pre-Bid Meeting
Substitution Request Review
Bidder Questions
Addenda
ll
Not included
0.5
1
1 1
Hour Total 0 0 0 0 2.5 0 0 0 1
Labor Hourlv Rate $250.00 $225.00 $190.00 s175.00 $160.00 $150.00 $'t 30.00 sl 10.00 $85.00
Labor Cost Sub-Totals $0 $0 $0 $o $400 $0 $0 $0 $85
CONSTRUCTION PHASE
Task Principal
ASSOC
Principal
senror
Enqr
Senior
Proi Mqr
Project
Enqr
Project
Mqr
Senior
Desiqner
cAu
Tech Clerical
Pre-Con Meeting
Submittal Reviews
Submittal Re-Reviews
Correspondence Review
Meetings (Virtual)
Site Visits
RFI's
Punchlist
Backcheck
Closeout Review
Not lncludedlo.sl
See Mechanical
See Mechanical
See Mechanicaltl
1
4
1
I
2
I 0.5
2
Hour Total 0.5 0 0 10 0 0 0 0.5 2
Labor Hourlv Rate $250.00 s225.00 $1S0.00 $175.00 $160.00 $150.00 s 1 30.00 $1 10.00 $85.00
Labor Cost Sub-Totals $125 $0 $0 $1,750 $0 $0 $0 $55 $170
CONSTRUGTION FTIAI
Principal
Assoc
Principal
Senior
Enor
Senior
Proi Mor
Project
Enor
Prolect
Mor
Senior
Desiqner
CAT)
Tech Clerical
5250.00 $225,00 $190.00 I $175.00 3160.00 $t50.00 5130.00 s1 10.00 $85.00
NIC = Not lncluded