HomeMy WebLinkAboutSO GeneratorKITTITAS COUNTY
July 29th,2026
Hultz BHU
1111 FawcettAve
Suite 100
Tacoma, WA 98402
RE: Sheriff's Office Generator Project Task #1
At this time Kittitas County would like to accept the proposal for the on-call services
contract per ExhibitA, Engineering Services Proposal, dated 6-10-2026.
Description:
Task 1 On Call Services for Design, Bid, CA & reimbursable expenses not to exceed
$32,990.
Please sign and return
Cou nty m Hultz BHU
c
(signed)
6w*i nLfu1
(signed)
(printed name)
(date)
?U
(printed name)
(date)
?LOL 6
Hu:rrzEBHU
engineers inc
June L7,2026
Kittitas County
205 W 5th Avenue, Suite L05
Ellensburg, WA 98926
Attention: CharlieSmith
Subject Courthouse Server Room - AC Replacement
Engineering Services Proposal
Dear Charlie:
Here is our proposal to provide engineering services for this project.
Proiect Description
Replace two split system HVAC units serving the server room at the Courthouse, New unit will be same
size as the existing. Project will be publically bid.
Scope of Services
Design Phase: Provide field reviews, engineering, drawings, and specifications to allow for the work.
Construction cost estimates and updated schedules are included with each progress submittal. A 60%
progresssel,go%oprogressset,andfinall0O%(bidready)setofsubmittalsareincluded. Weassumeyouwill
provide us the Division 00 contract documents (bid form, contract, etc.).
Bid Phase: Attend the pre-bid meeting, respond to bidder questions, review substitution requests,
issue any required addenda, and review bids.
Construction Phase: Attend the pre-construction meeting, review product submittals, answer contractor
questions, conduct and attend virtual meetings during construction (assume 4), provide one site visit
during construction, review pay requests, provide one punchlist review, one punchlist back check, and
review project closeout documents (O&M manual, generator test reports, etc.).
Proposed Fee
We propose to provide our services on an hourly charge basis, not to exceed our authorized fee without
your prior permission. Fee summary:
Engineering:
Discipline Desisn Bid CA Totals
Mechanicat Stt,gts 52,095 58,015 52L,425
Electrical 53,855 5485 52,100 55,440
Total $27,865
Reimbursable:
1 1 1 1 Fawcett Avenue, Suite 100 . Tacoma, Washington 98402
T 253.383.3257 . F 253.383.3283 r general@hultzbhu com
June t7,2026
Kittitas County
Courthouse Server Room - AC Replacement
Engineering Services Proposal
Page2
Mileage
Printing
Total Reimbursable
s 8oo
Reimbursable costs will be billed as incurred in accordance with County requirements.
Total not-to-exceed fee with Reimbursable: 528,765
See the attached for a list of expected engineering task and hours.
Preliminarv Schedule
Assuming a notice to proceed by July 15th, here is a preliminary schedule.
Task/Activity Completion Date
S 1oo
s soo
NTP
60% Submittal
90% Submittal
Final Bid Set
Bid Set Released
Bids Due
Contractor NTP
HVAC Equipment On-Site
Substantial Completion
Final Acceptance
July 15,
August 5,
August 19,
August 29,
September 2,
September 23,
October 3,
Norcmber'14,
December 5,
December 19,
2026
2026
2026
2026
2026
2026
2026
2026
2026
2026
We appreciate this opportunity to work with you.
Sincerely,
Hultz I BHU Engineers Inc./-( F
Rick Hultz, PE
Principal
Attached: Estimated Tasks/Hours, 2 pages
Hu|E/BHU Engineers
Consulting Engineers
Project: Kittitas County Courthouse Server AC Units
Work: MechanicalEngineering
ENGINEERING HOURS (253) 383-3257
6t17 t2026
Page 1
Task Principal
Assoc
Principal
Senror
Enqr
Senror
Proi Mor
P rolect
Enqr
Project
Mor
Sen ior
Desiqner
CAD
Tech Clerical
Design Phase Kick-Off lVeeting
Site Visit
Develop ACAD Background
Gt!Cover Sheet
M#Legend/Notes
M#Schedules
M#HVAC Plan
lV#Details
Specifications - Technical
Coordination
Project Schedule
lVeetings
QC Review
Progress Submittal(s)
Cost Estimate(s)
Respond to Review Comments
Permit Forms
0.5
0_5
0.5
0.5
u.5
0.5
0.5
0.5
b
1
1
2
12
4
6
1
2
2
2
J
0.5
1
2
4
Hour Total 3.5 0 o 0 4A 0 0 22 4
Labor Houdv Rate s250 00 s225 00 s'190.00 $1 75.00 $160.00 $1 50.00 $1 30.00 s1'10 00 s85.00
Labor Cost Sub-Totals s875 $0 $0 $o $7,680 $o $0 $2.420 $340
I Pa.tA
Task Principal
Assoc
Princioal
sentor
Enqr
Senior
Proi lvlor
Project
Enqr
ProJect
Mqr
Senior
Desiqner
CAD
Tech Clerical
Pre-Bid Meeting
Substitution Request Review
Bidder Questions
Addenda
b
2
1
1
Hour Total 0 0 11 0 0 1
Labor Hourlv Rate s250.00 5.00 $1 90.00 $1 75.00 $1 60.00 s1 50.00 sl 30 00 s1 10.00 s85.00
Labor Cost Sub-Totals s250 s0 $0 $o $1 ,760 $0 $0 $0 $85
CONSTRUCTION PHASE
Task PrinciDal
Assoc
Principal
Senior
Enqr
Senior
Proi Mor
Project
Enqr
Project
Mqr
Senior
Designer
CAIJ
Tech Clerical
Pre-Con Meeting
Submittal Reviews
Submittal Re-Reviews
Meetings (Virtual)
Site Visi (1)
RFI's
Pay Reviews
Pu nchlist
Backcheck
Closeout Review
0.5
1
0.5
8
2
6
2
1
1
4
1
1
1
Hour Total 3 0 0 41 0 0 1 7
Labor Houdv Rate s250.00 s225.00 $1 90_00 $1 75.00 $1 60.00 $1 50.00 sl 30 00 $1 '10.00 $85.00
Labor Cost Sub-Totals $750 s0 $0 $o $6,560 s0 $0 $110 $595
f
NIC = Not lncluded
Hultz/BHU Engineers
Consulting Engineers
ENGINEERlNG HOURS (25s) s8s-3257
6117t2026
Page:2
Project: Kittitas County Courthouse Server AC Units
Work: Electrical Engineering
DESIGN PHASE
Task Principal
Assoc
Principal
Senior
Enqr
Senior
Proi Mqr
Prolect
Enqr
Prolect
Mqr
Senior
Desiqner
CAD
Tech Clerical
Site Visit
Confirm Loads
E#-Legend/General Notes
E#-Power Plan(s)
E#-New Panel Schedules
E#-New One Line
Specificatione Technical
Coordination
Meetings
QC Review
Progress Submittal(s)
Cost Estimate(s)
See Mechanical
0.5
Not lncluded
0.5
3
1
2
1
3
2
1
1
I
2
I
1
Hour Total 2 0 0 17 0 0 5
Labor Hourlv Rate s250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 s1 10.00 s85
Labor Cost Sub-Totals $500 $0 0 $0 $2,720 $0 $0 $550
BID PHASE
Task Principal
ASSOC
Principal
senror
Enqr
sentor
Proi Mor
Project
Enqr
Project
Mqr
Senior
Desiqner
CAD
Tech Clerical
Pre-Bid Meeting
Substitution Request Review
Bidder Questions
Addenda
Not included
0.5
1
1 1
Hour Total 0 0 0 0 2.5 0 0 0 1
Labor Hourlv Rate $250.00 $225.00 $190.00 $175.00 $160.00 $ t 50.00 $130.00 $1 10.00 $85.00
Labor Cost Sub-Totals $0 $0 $0 $0 s400 $0 $0 $0 $85
BID PHASE TOTAL: S4E5
CONSTRUCTION PHASE
Task Principal
Assoc
Principal
Senior
Enqr
Senior
Proi Mqr
Project
Enqr
Project
Mqr
Senior
Desiqner
CAD
Tech Clerical
Pre-Con Meeting
Submittal Reviews
Submittal Re-Reviews
Correspondence Review
Meetings (Virtual)
Site Visits
RFI'S
Punchlist
Backcheck
Closeout Review
Not lncludedl os l
See Mechanical
See Mechanical
See Mechanicaltt
1 0.5
2
Hour Total 0.5 0 0 10 0 0 0 0.5 2
Labor Hourlv Rate $250.00 $225.00 $190.00 $175.00 s160.00 $150.00 $130.00 $1 10.00 $85.00
Labor Cost Sub-Totals $125 $0 $0 $1,750 $0 $o $0 $55 $1 70
Tech Clerical
NIC = Not lncluded