HomeMy WebLinkAboutR2026-145 Fully ExecutedBOARD OF COUNTY COMMISSIONERS
COUNTY OF KITTITAS COUNTY
STATE OF WASHINGTON
RESOLUTION
Resolution Authorizing Reimbursement from the Ryegrass Balefill
Post-Closure Reserve for Documented Post-Closure Costs
WHEREAS: The Kittitas County Board of Commissioners is responsible for managing the countywide
Solid Waste System under chapter 704.205 RCW, chapter 36.58 RCW, and the Joint Solid Waste
Disposal System Agreement of March 12, 1979; and
WHEREAS: The Ryegrass Balefill Landfill is a closed municipal solid waste landfill subject to
continuing post-closure monitoring, maintenance, reporting, and financialassurance requirements under
chapter 173-351WAC and Agreed Order No. DE98-SW-C168; and
WHEREAS: RCW 70A.205.165 requires financial assurance adequate to cover landfill closure costs,
including post-closure monitoring, pollution prevention measures, and other procedures required by state
and federal regulations; and
WHEREAS: WAC 173-351-600 requires continuous financial assurance for the costs of post-closure
care and permits a municipal corporation to maintain that assurance through cash and investments
accumulated in a reserve fund restricted for post-closure care; and
WHEREAS: Kittitas County has maintained funds restricted for Ryegrass Balefill Landfill post-closure
obligations while also paying eligible post-closure monitoring, reporting, testing, financial assurance
support, and related compliance costs from Solid Waste operating revenues; and
WHEREAS: Parametrix completed a cost allocation review dated August 12,2026,
which identified $387,209.89 in supportable Ryegrass Balefill Landfill post-closure costs paid by the
County based on records reviewed to date; an
WHEREAS: The Board finds that reimbursing the Solid Waste operating fund for those documented
expenditures is an appropriate use of the Ryegrass Balefill post-closure reserve, provided that the
reimbursement is limited to eligible post-closure costs and that the remaining financial assurance
continues to satisfy applicable law, the approved post-closure plan, and permit requirements;
NOW THEREFORE BE lT RESOLVED: The Board of County Commissioners authorizes reimbursement
to the appropriate Solid Waste operating fund from funds designated for Ryegrass Balefill Landfill post-
closure care, as documented in the Parametrix memorandum dated August 12,2026.
BE lT FURTHER RESOLVED: The Solid Waste Director is authorized to take the necessary
administrative and accounting actions to carry out this resolution in accordance with applicable County
requirements.
Dated this €0", of septembe r,2026
BOARD OF COUNry COMMISSIONERS
KITTITAS
Brett , Chairman
Laura Chairman
NT
tsstoner
APPROVED AS TO FORM:ATTEST:
,Btlerk of the Board- Julie Kjorsvik
L Deputy Clerk of the Board- Mandy Buchholz
Deputy Prosecuting Attorney
ParametriX Memorandum
DATE:
TO:
FROM:
SUBJECT:
PROJECT NUMBER:
PROJECT NAME:
let'.s creale aOmcror!', tng*lJ:*r
August 12,2026
Patti Stacy & Jesse Cox
Tiffany Neier, PE
Parametrix Cost Allocation Method for Ryegrass Balefill Closed Landfill
553-1763-011
Kittitas County Solid Waste On-call
Introduction
Kittitas County Solid Waste (County) requested a cost allocation review to estimate the portion of
recent Ryegrass Facility (Facility) costs attributable to the closed Ryegrass Balefill Landfill (Balefill
Landfill). The purpose of this review is to support County documentation of Balefill Landfill post-
closure costs.
The Facility includes the closed Balefill Landfill and the active Ryegrass Limited Purpose Landfill
(LPL). Environmental monitoring and reporting are completed through a combined Facility program,
but the regulatory requirements and monitoring activities differ by landfill unit. The Balefill Landfill is
monitored under Chapter L73-351-Washington Administrative Code (WAC) and Agreed Order (AO)
DE98-SW-C168. The LPL is monitored under Chapter 173-350 WAC and Kittitas County Public
Health Department permit number LPL-05 (Parametrix 2026).
This review includes Parametrix labor, Parametrix direct expenses, and County-provided cost
information for historical HWA GeoSciences (HWA)and Onsite Environmental services. Parametrix
direct expenses include mileage, travel, field equipment, shipping, and similar non-labor costs billed
through Parametrix. HWA and Onsite Environmental costs were paid directly by the County and are
shown separately from Parametrix invoice costs.
The allocation method and supportable Balefill Landfill cost identified to date are summarized in this
memorandum. Cost allocation summary tables are provided in Appendix A. The detailed monitoring-
location basis and allocation calculations are provided in Appendix B.
Costs Reviewed
Costs were grouped by work type before allocation. This review includes:
r Parametrix labor billed to the County for environmental monitoring, reporting, financial
assurance, and related Facility support.
I Parametrix direct expenses billed through Parametrix invoices, such as mileage, travel, field
equipment, shipping, and similar non-labor expenses.
I County-direct historical HWA costs provided by the County for groundwater, leachate, and
related environmental mon itoring services.
r County-direct Onsite Environmental costs provided by the County for testing services.
County labor, County equipment, internal Countyfield support, maintenance costs, and other County-
side costs are not included unless specifically identified in the County-provided cost information.
7A9 2ndAvenue,suite 200 . seattle,wA98104 | 206.394.3700 | Parametrix.com
ItarametriX August 12,2026
Page 2
Allocation Basis
Costs were assigned directly when the available information identified a specific landfill unit or work
item. Costs associated with combined Facility monitoring, reporting, or support activities were
allocated using the methods summarized below and detailed in Appendix B. Cost summary tables
are provided in Appendix A.
Fieldwork
Fieldwork costs included Parametrix field labor, Parametrix direct field expenses, and County-direct
HWA field costs. Fieldwork was allocated based on the monitoring activities expected in each
quarter, including groundwater monitoring, leachate monitoring, perimeter LFG monitoring, and
Balefill Landfill gas vent monitoring.
Where field costs were provided as one total rather than by quarter, the average annual fieldwork
allocation was used. The average annual fieldwork allocation is based on the quarterly fieldwork
allocation method detailed in Appendix B.
Reporting
Reporting costs were allocated separately from fieldwork because report preparation is not driven
only by field effort or the number of monitoring locations. Reporting also includes data review, tables,
figures, compliance discussion, statistical evaluation, groundwater trend review, LFG summaries,
leachate summaries, and coordination.
Quarterly reporting allocations were used for Ql through Q3 monitoring reports. Year-end reporting
effort was allocated using the annual environmental monitoring report allocation because the annual
report serves as the primary year-end reporting document and includes both landfill units.
Othet Mixed Work
Other mixed work included shared groundwater network support, shared financial assurance
support, combined LFG planning and support, and work that was clearly specific to one landfill unit.
These costs were allocated based on the assignment rules and allocation methods detailed in
Appendix B. Costs that were clearly LPl-specific, unrelated to the Balefill Landfill, or not sufficiently
supported for allocation were not counted toward the Balefill Landfill total.
Balefill Landfill Post-Glosure Work Items
The following work items were treated as Balefill Landfill post-closure activities when identified in
invoices, progress letters, or County-provided cost information:
: Balefill Landfill groundwater monitoring, data review, and compliance evaluation.
I Balefill Landfill leachate sampling, leachate flow review, and leachate reporting.
r Balefill Landfill perimeter LFG monitoring.
r Balefill Landfill gas vent monitoring and stabilization evaluation.
r Balefill Landfill cover system inspections, maintenance, erosion repair, settlement review,
vegetation management, access improvements, or related post-closure cover system support.
r Balefill Landfill annual and quarterly environmental monitoring report sections.
x
FarametriX August 12,2026
Page 3
r Balefill Landfill statistical evaluation and groundwater quality trend review.
r Balefill Landfill-related financial assurance support.
r Coordination with the County, Kittitas County Public Health Department, or Ecology related to
Ba lefi I I Landf i I I post-closu re mon itori ng or com pl ia nce.
r Direct expenses supporting Balefill Landfill fieldwork.
These work items are consistent with the Balefill Landfill monitoring and compliance activities
described in the annual environmental monitoring reports (Parametrix 2025; Parametrix 2026).
Cost Summary
Table l summarizes the supportable Balefill Landfill post-closure cost identified to date. Additional
cost allocation detail is provided in Appendix A.
Table 1. Supportable Balsfill Landflll Cost ldentifled to Date
OoatSource Cost Basls Allocatlon Appllcd
BalsflllLandflll
Amount countod
Parametrix labor and
direct expenses
Onsite Environmental testing
HWA services
$711,661.04
reviewed
$45,325.00
$140,094.00
Mixed allocation by
work type
100% Balefill Landfill
Average annual
fieldwork allocation
s260,830.37
$45,325.00
981,264,52
Totsl suppoitable Baleflll
Landfl ll amount ldsntlfl od
to dato
$387,209.89
Parametrix invoice costs were reviewed by work type and allocated using the methodology
summarized in this memorandum and detailed in Appendix A and Appendix B. Costs that were LPL-
specific, unrelated to the Balefill Landfill, or not sufficiently supported for allocation were not
counted toward the Balefill Landfill amount shown in Table 1.
Relationship to the County's Broader Cost Estimate
The supportable Balefill Landfill amount identified to date is based on Parametrix invoice records
and County-provided cost information for HWA and Onsite Environmental. This amount does not
include County labor, County equipment costs, internal County field costs, direct closed-landfill
maintenance costs, additional laboratory or testing costs not captured in the Onsite Environmental
total, or other County-paid costs that may be associated with Balefill Landfill post-closure care.
Accordingly, the amount identified in this memorandum should be understood as the documented
support amount based on the records reviewed to date. lt may not represent the full amount the
County has spent on Balefill Landfill-related post-closure activities. Additional County-side costs may
be added separately if the County would like this support package to more fully reflect its broader
Ryegrass la ndfill management expenditures.
Use of This Memorandum
This memorandum is intended to support the County's internal documentation of costs associated
with Balefill Landfill post-closure monitoring, reporting, financial assurance support, and related
ParametriX August t2,2026
Page 4
closed-landfill work. This memorandum does not authorize withdrawal or transfer of funds from any
County reserve account. Any transfer, reimbursement, or reserve adjustment should be completed in
accordance with County financial procedures and applicable solid waste financial assurance
requirements, including confirmation of the remaining required post-closure reserve balance after
reimbursement.
References
Parametrix. 2025.2O24 Annual Environmental Monitoring Report - Ryegrass Balefill Landfill and
Ryegrass Limited Purpose Landfill. Prepared for Kittitas County Solid Waste by Parametrix, Seattle,
Washington. March 2025.
Parametrix. 2026. 2025 Annual Environmental Monitoring Report - Ryegrass Limited Purpose
Landfill and Ryegrass Balefill Landfill. Prepared for Kittitas County Solid Waste by Parametrix,
Seattle, Washington. March 2026.
Appendix A
Cost Allocation
Summary Tables
.H,ppendix A: Cost Allocation Summary Tables
Table 1. CootSource Revlewed
C6tSourco Coet Rsvlowed Treatmsnt
Parametrix Iabor and direct expenses
Onsite Environmental testing
HWA services
$711,661.04
$45,325.00
$140,094.00
Reviewed by work type and allocated where supported.
County identified as Balefill Landfill-only; counted altOO%.
County-provided historicaI monitoring cost; aIlocaLed usirtg
average annual fieldwork allocation.
Table 2. Parametrix Cost Revlew Summary
WTrsatment Total tbramstrfi Cost Balsfl ll Landfi ll ffnount Countod
lncluded in final allocation
Excluded from Balefill Landfill allocation
Left out for defensibility
Total kramotrlx cost revlarcd
$448,978.07
$255,018.65
$7,664.32
$71166r-04
$234,575.94
$0.00
$o.oo
$2U,576,94
Table 3. County- Provlded CoetAllocatlon
CootSourcs Cost Basls Alocailon Applle<l
Balefilll.andflll
lfiiountOountod
Onsite Envi ronmental testing
HWA services
Total Coun$Fprovlded costs aountod
$45,325.00
$140,094.00
100% Balefill Landfill
58% Balefill Landfill
$45,325.00
$81,,254.52
$t2a,575,52
Table 4.Total Supportable Balefill Landfill Coet ldentffied to Date
c6t SOUTCO Baleflll Landflll Amount Oountsd
Parametrix labor and direct expenses
Onsite Envi ron mental testing
HWA services
Total su pportable Balsfl ll ta nclfl ll amount ldentlfl ed to date
$260,630.37
$45,325.00
$81,254.52
$387,209.89
Detailed invoice records, progress letters, and County accounting records are retained separately
and can be provided as backup if requested.
A-1
Appendix B
Allocation Method Tables
ParametriX Memorandum
DATE:
TO:
FROM:
SUBJECT:
PROJECT NUMBER
PROJECT NAME:
let's create tomorraw, logefher
August 12,2026
Patti Stacy & Jesse Cox
Tiffany Neier, PE
Allocation Method & Tables
553-1763-011
Kittitas County Solid Waste On-call
Purpose
This appendix summarizes the allocation basis used to assign Ryegrass Facility (Facility) costs
between the closed Ryegrass Balefill Landfill (Balefill Landfill)and the active Ryegrass Limited
Purpose Landfill (LPL). The allocation method is based on the monitoring program, monitoring
locations, monitoringfrequency, landfill-specific monitoring activities, and reporting effort described
in the annual environmental monitoring reports (Parametrix 2025; Parametrix 2026).
Costs were assigned directly when the available information identified a specific landfill unit or work
item. Costs associated with combined Facility monitoring or reporting were allocated using the
percentages summarized in this appendix.
Groundwater Monitoring Basis
Groundwater monitoring includes Balefill Landfill-only, LPL-only, and shared monitoring locations.
Balefill Landfill groundwater monitoring is completed semiannually. LPL groundwater monitoring is
completed quarterly. Well 88 was added to both monitoring programs in 2025'
Table 1. Groundwater Monitoring Basls
Monltorlng Locatlon
Baleflll
!andflll TPL Alocation Bash
82
B3
B4
B5
B6
Poison Spring
87
Clerf #4 Spring
B8
Yes
Yes
Yes
Yes
Yes
Yes
No
No
Yes
No
Yes
No
No
No
No
YeS
Yes
Yes
Balefill Landfill monitoring location.
Shared location.
Balefill Landfill monitoring location.
Balefill Landfill monitoring location.
Balefill Landfill monitoring location.
Balefill Landfill monitoring location.
LPL monitoring location.
LPL mon itoring location.
Shared upgradient location added to both monitoring programs.
Source: Parametrix 2025; Paramelrix 2026.
7L9 2ndAvenue, Suite 200 . Seattle, WA98104 | 206.394.3700 | Parametrlx'com
Parametrik August 12,2026
Page B-2
Landfill Gas Monitoring Basis
Landfill gas (LFG) monitoring includes perimeter monitoring at both landfill units and gas vent
monitoring at the Balefill Landfill. Gas vent monitoring is specific to the Balefill Landfill.
Table 2. LFG Monltorlng Basls
LFG Monltorlng Compon€nt
BalEllll Landflll
Locstlong IPL Locatlong Allocatlon Basls
Peri meter LFG mon itoring
Gas vent monitoring
Comblned Lfti plannlng
and support
9 8
0
8
Perimeter LFG monitoring is completed at both
landfill units.
Gas vent monitoring is associated with the closed
Balefill Landfill.
Used as the starting point for combined LFG
planning and support allocation.
26
35
Source: Parametrix 2025; Parametrix 2026.
The location-count basis in Table 2 was used to calculate the initial LFG allocation factors. Perimeter
LFG monitoring costs were allocated based on the perimeter monitoring locations. Gas vent
monitoring costs were assigned to the Balefill Landfill because gas vent monitoring is associated
with the closed Balefill Landfill. Combined LFG planning and support costs were adjusted from the
location-count basis to reflect the additional Balefill Landfill-specific effort associated with gas vent
stabilization monitoring, gas vent modifications, valve and access issues, related post-closure LFG
evaluation, and surface emissions monitoring where identifiable in the cost records.
Based on the monitoring location count:
r Perimeter LFG monitoring only: 9 + 17 = 53o/o Balefill Landfill.
r Combined perimeter LFG and gas vent monitoring location basis: 35 + 43 = 81% Balefill
Landfill.
Leachate Monitoring Basis
Leachate monitoring is specific to the Balefill Landfill. Leachate is collected from the Balefill Landfill
and conveyed to the leachate evaporation pond. Leachate sampling, leachate flow review, and
leachate reporting were assigned to the Balefill Landfill when those costs were identifiable.
Table 3. Leachate Monitorlng Basis
L€achato Component
86l6flll
Landflll LPL Allocatlon BasF
Leachate sampling
Leachate flow review
Leachate repofting
Yes
Yes
Yes
No
No
No
Balefill Landfill-specific monitoring.
Leachate is generated from the Balefill Landfill and conveyed to
the leachate evaporation pond.
Balefill Landfill-specific reporti ng component.
Source: Parametrix 2025; Parametrix 2026.
Parametrik August L2,2026
Page B-3
Fieldwork Allocation
Fieldwork percentages were applied to Parametrix field labor, Parametrix direct field expenses, and
County-direct HWA field costs. The fieldwork allocation reflects the monitoring activities expected in
each quarter.
Table 4. Fleldwork Allocatlon Percentagos
Quart6r
Balofill
Landflll LPL Basis
Q1
Q3
Q4
8Oo/o 20%
75% 25o/o
40%60%
Balefill Landfill semiannual groundwater, annual leachate, perimeter LFG, and gas
vent monitoring; LPL quarterly groundwater and perimeter LFG monitoring.
Primarily LPL quarterly groundwater and shared perimeter LFG monitoring; no
routine Balefill Landfill groundwater or leachate event.
Balefill Landfill semiannual groundwater, perimeter LFG, and gas vent monitoring;
LPL quarterly groundwater and perimeter LFG monitoring.
Primarily LPL quarterly groundwater and shared perimeter LFG monitoring, with
Balefill Landfill gas vent monitoring and year-end field support.
Parametrix direct expenses were allocated using the fieldwork percentages unless the expense was
clearly tied to another work type.
.Everage A.nnual Fieldwork "E llocation
Where field costs were provided as one total rather than by quarter, the average annual fieldwork
allocation in Table 5 was used.
Table 5. Average Annual Fleldwork Allocatlon
Allocation Typo Baleflll Lanctfill T"PL Calculatlon Basls
Average annual
fieldwork allocation 58o/o 42o/o
Average of the quarterly fieldwork allocations in
Table 4, rounded to whole percentages.
The average annual fieldwork allocation was calculated as follows:
r Balefill Landfill: (80% + 35o/o + 75% + 4o%) + 4 = 58To, rounded to the nearest
whole percentage.
r LPL: (2O% + 650/o + 25o/o + 60%) + 4 = 42o/o, rounded to the nearest whole percentage.
This allocation was used for the County-provided HWA total because the cost was provided as a
summary amount for historical field monitoring services.
Reporting Allocation
Reporting percentages were applied to environmental monitoring report labor. Reporting was
allocated separately from fieldwork because report preparation is not driven only by field effort or the
number of monitoring locations. Reporting also includes data review, tables, figures, compliance
discussion, statistical evaluation, groundwater trend review, LFG summaries, leachate summaries,
and coordination.
Palametrik August 12,2026
Page B-4
The reporting allocation was based on the type of report being prepared. Quarterly reporting
allocations were used for Ql through Q3 monitoring reports. Year-end reporting effort was allocated
using the annual environmental monitoring report allocation because the annual report serves as
the primary year-end reporting document and includes both landfill units.
Table 6. Reportlng Allocatlon Percontages
RepoftTfipe
Baloflll
[andflll I.PL Baale
Q1 reporting
Q2 reporting
Q3 reporting
Annual environmental
monitoring report
7Oo/o 3Oo/o
7Qo/o 3Oo/o
TOYo 30%
Balefill Landfill groundwater, leachate, LFG, gas vent, and compliance
reporting; LPL quarterly reporti ng.
Primarily LPL groundwater reporting and shared LFG reporting, with
limited Balefill Landfill reporting.
Balefill Landfill groundwater, LFG, gas vent, and compliance reporting;
LPL quarterly reporting.
Combined report with additional Balefill Landfill post-closure
monitoring and compliance components, including leachate
monitoring, gas vent monitoring, semiannual groundwater
compliance, and Chapter 1-73-35L WAC compliance discussion.
The reporting percentages intentionally difFer from the fieldwork percentages where reporting effort
differs from field effort. For example, Q2 reporting is weighted more heavily to the LPL because
routine Balefill Landfill groundwater and leachate reporting are not part of the Q2 event, while LPL
groundwater reporting continues quarterly.
The annual environmental monitoring report allocation is weighted more heavily to the Balefill
Landfill because the Balefill Landfill portion includes additional post-closure components. The LPL- portion includes groundwater and perimeter LFG reporting but does not include leachate or gas vent
sta bi I ization reporting.
Other Nlixed Work Allocation
Some costs did not fit cleanly into fieldwork or reporting. Those costs were allocated using Table 7.
Table 7. Other Mked WorkAllocation Percentages
li/orkType
Baloflll
[andflll TPL Basb
Balefill Landfill-
specific work
Shared groundwater
network support
Shared financial
assurance support
Combined LFG
planning and support
LPL-specific or
unrelated work
tQOo/o
5Oo/o
50%
90%
5Oo/o
50%
LOo/o
!OO%or
excluded
O% Work clearly identified as supporting only the Balefill Landfill
Work supported the overall Facility groundwater monitoring
network and was not clearly landfill-specific.
Work supported financial assurance for both landfill units or
the Facility generally.
Adjusted from the LFG location-count basis to reflect
additional Balefill Landfill-specific effort for gas vent
sta bi I ization, gas vent mod if ications, va lvelaccess issues,
post-closure LFG evaluation, and identifiable surface
emissions monitoring.
Work clearly identified as suppofting only the LPL or another
non-Balefill Landfill Facility activity.Oo/o
Parametrik August 12,2026
Page B-5
Cost .F,ssignment Rules
The following rules were used to assign costs before applying allocation percentages:
r Assign costs to the Balefill Landfill when the work clearly supported Balefill Landfill
groundwater monitoring, leachate monitoring, LFG monitoring, gas vent monitoring, cover
system support, post-closure compliance, or Balefill Landfill financial assurance.
r Assign costs to the LPL or exclude them from the Balefill Landfill total when the work clearly
supported only the LPL or another non-Balefill Landfill Facility activity.
r Allocate shared rrrorritorirrg and reportirrg costs using Tables 4 through 7.
r Exclude unclear costs from the Balefill Landfill total unless the available information provided
enough support for allocation.
References
Parametrix. 2025.2024 Annual Environmental Monitoring Report - Ryegrass Balefill Landfilland
Ryegrass Limited Purpose Landfill. Prepared for Kittitas County Solid Waste by Parametrix, Seattle,
Washington. March 2025.
Parametrix. 2026.2025 Annual Environmental Monitoring Report - Ryegrass Limited Purpose
Landfill and Ryegrass Balefill Landfill. Prepared for Kittitas County Solid Waste by Parametrix,
Seattle, Washington. March 2026.
x