Loading...
HomeMy WebLinkAboutLower Valley Transfer Station_Request for Contract Amendment_amendment_No-4_final-08_27_26_r2 2405 140th Ave. NE, Suite 107, Bellevue, WA 98005 | 425-746-4600 | eFax 503-684-6948 Environmental Consultants & Contractors August 27, 2026 Project No. 01222292.00 Patti Stacey Kittitas County Solid Waste/Facility Maintenance Director 925 Industrial Way Ellensburg, WA 98926 Subject: Project - Kittitas County Lower Valley Transfer Station Engineering Services Contract Amendment No. 4 (Revised) Dear Patti: Pursuant to your request, SCS Engineers (SCS) is submitting this revised proposal to provide additional engineering services to address wind-related issues at the Moderate Risk Waste (MRW) and Transfer Station Buildings. 1.0 ENGINEERING SERVICES 1.1 MRW Building – North Wall Design SCS will provide design drawings to install metal wall paneling along the north side of the Moderate Risk Waste (MRW) building to minimize stormwater intrusion into the facility during major storm events. Kittitas County will submit the design drawings to the City of Ellensburg Building Department for approval. SCS will review one submittal during the construction phase. Deliverables • Develop one (1) draft design and one (1) final-stamped drawings/sketches (est. 5 total) for installation of metal wall paneling Assumptions • County submits design drawings to the City Building Department for Approval • Review one (1) contractor submittal during the construction phase 1.2 Transfer Building – South Wall and Tunnel Door Design SCS will perform wind modeling of two (2) options to determine impact of installing a wind barrier (Option 1) at the entrance to the facility and installing metal paneling along the southern wall (Option 2) to reduce wind- blown debris within the transfer building and load-out tunnel area (est 24 hours). SCS will meet with the County to discuss options and County will select the preferred option. Our estimated engineering fee is based on designing a metal wall panel system along the south side of the Transfer Building and design of a roll-up overhead door at the north tunnel exit location to reduce wind-blown debris during transfer trailer loading operations. SCS will review approved Pre-Engineered Metal Building (PEMB) submittals, design drawings, and calculations. This evaluation will determine whether the existing PEMB is structurally capable of supporting the installation of metal wall panels and an overhead door. If the structure is determined to be inadequate, the evaluation will identify the modifications required to accommodate the proposed improvements. Kittitas County Lower Valley Transfer Station August 27, 2026 Page 2 A set of draft design documents will be developed that include product and material specifications and structural details for construction and installation. The draft set will be provided to the County for review. SCS will conduct a review meeting (virtual) to discuss County comments. Comments will be incorporated into the design, and a final (stamped) design set will be provided to the County for permitting and construction. Kittitas County will submit the design drawings/sketches to the City of Ellensburg Building Department for approval. SCS will review one (1) submittal during the construction phase. Deliverables • One (1) Draft and one (1) final-stamped Design Drawing Set for installation of wall paneling and installation of one (1) roll-up door Assumptions • Work will be performed on a Time and Materials (T&M) basis and SCS will notify the County when 75% of the budget is spent. An additional funding request may be necessary if the selected option requires additional engineering/architectural efforts • County submits design drawings to the City Building Department for Approval • Review one (1) contractor submittal during the construction phase BUDGET The estimated fee for the additional work described in this Amendment No. 4 is $32,215. We propose to perform this work on a Time and Material (T&M) basis. The terms and conditions for this added scope of work will remain the same as those listed in the executed contract. Proposed Fees for Amendment 4 Task Task Description Estimated Engineering Fee 1.1 MRW North Wall Design $7,875 1.2 Transfer Building - South Wall & Tunnel Door Design $24,340 Total $32,215 CLOSING SCS appreciates the opportunity to continue to provide engineering services to the County on this important project. Please do not hesitate to contact us if you have any questions or comments. Sincerely, Thomas D. Parker, P.E. Michelle Leonard Project Director Senior Vice President SCS Engineers SCS Engineers