Loading...
HomeMy WebLinkAboutLower Valley Transfer Station_Request for Contract Amendment No. 5_final_R1 2405 140th Ave. NE, Suite 107, Bellevue, WA 98005 | 425-746-4600 | eFax 503-684-6948 Environmental Consultants & Contractors August 21, 2026 Project No. 01222292.00 Patti Stacey, Director Kittitas County Solid Waste/Facility Maintenance Director 925 Industrial Way Ellensburg, WA 98926 Subject: Project - Kittitas County Lower Valley Transfer Station Additional Construction Phase Engineering Support Services Request for Contract Amendment No. 5 (Revised) Dear Patti: Pursuant to your request, SCS Engineers (SCS) is submitting this revised proposal to provide additional engineering services during construction for the Lower Valley Transfer Station project in Ellensburg, WA. SCS’s contract amendment No. 3 scope of work provided construction phase engineering services from August 1, 2024 through December 31, 2025. This contract amendment provides for construction phase services from January 1, 2026, through project completion (est. October 1, 2026). This contract amendment also provides stormwater engineering support services to address City of Ellensburg final inspection comments and to document stormwater management system changes. 1.0 ADDITIONAL CONSTRUCTION PHASE ENGINEERING SUPPORT SERVICES SCS will provide Kittitas County (County) with additional construction phase support services from January 1, 2026 through project completion (estimated October 1, 2026). Services include reviewing shop drawings, responding to Request for Information (RFI’s), preparing design changes, attendance and participation at weekly construction meetings, substantial completion inspection services, developing record drawings from the contractor’s redline markups, and participation in final project walkthroughs. The services also include stormwater engineering services to address City of Ellensburg final inspection comments and to document field and design stormwater management system changes. 1.1 Project Management/Project Meetings SCS will provide project management services, including subconsultant coordination, preparation of monthly invoices, and participation in monthly check-in calls with the County. One SCS staff will participate remotely in 16 – 1-hour progress meetings during the 9- month project duration. Assumptions: • Project management services will be provided for a 9-month period. • Two hours per month each are budgeted for the SCS Project Manager and Lead Engineer. • Seven monthly invoices will be developed and submitted. Kittitas County Lower Valley Transfer Station August 21, 2026 Page 2 • Attendance remotely by two SCS staff at 1-hour project meetings (total of 16 meetings). 1.2 Submittal Review/RFI Responses/Design Change Notices SCS will review contractor submittals. SCS will prepare responses and transmit them through the Owner provided software (Trimble ProjectSight). The estimated number of submittals by discipline is shown below: • Civil 4 • ASP 4 • MEP 4 • Total 12 SCS will review and provide responses to an estimated ten (10) Request for Information (RFI) and prepare an estimated two (2) Design Change Notices. Assumptions” • 12 Submittal Reviews (estimated 1 hour per submittal). • Respond to 10 RFIs (estimated 2 hours per RFI). • Develop two Design Change Notices (estimated 8 hours per notice) 1.3 Record Drawings and Project Closeout SCS will prepare record drawings utilizing contractor provided markups. Two (2) SCS team staff will participate in a substantial completion walkthrough and will provide the Owner with a final punch list of items to be corrected by the contractor. The number of record drawings to be prepared by discipline: • Civil 34 • Architectural 59 • Structural 27 • MEP 46 • Total 166 Assumptions • Preparation of 166 Record Drawings. • Attendance of two SCS staff at the Final Substantial Completion Inspection. Six hours are budgeted for each staff for the final inspection. Contract Amendment No. 3 included a task for the preparation of record drawings and project closeout services. During the final phase of the project, the budgets for most of contract tasks were fully expended. Consequently, SCS invoiced the County for construction phase engineering services under the record drawings task, resulting in the full expenditure of the budget allocated to that task. Task 1.3 provides the additional funding necessary to complete the preparation of the record drawings and perform the remaining project close-out services. Kittitas County Lower Valley Transfer Station August 21, 2026 Page 3 2.0 Stormwater Engineering SCS will provide stormwater engineering support to address City of Ellensburg final inspection comments and to document field and design stormwater management system changes. Engineering work will include revising the previously submitted and approved stormwater management report, revising stormwater drawings, developing revised channel figures, developing new design features, revising calculations and basin maps, documenting stormwater structure field changes, submitting draft reports, and submitting a revised Notice of Intent (NOI) for facility operation. SCS will develop and transmit to the City of Ellensburg four (4) draft review sets of the stormwater report including calculations, report text, maps, and drawings. SCS will design a new stormwater basin for the “east” v-ditch that will include revised calculations, and basin/outfall design drawings. In addition, SCS will design a set of culverts and revised asphalt grades to provide better traffic management in the composting area. Deliverables • Five (5) Sets of Revised Stormwater Management Plans and Drawings • New basin design and details • Submission of Revised Notice of Intent (NOI) 3.0 Owner Directed Tasks SCS may provide owner-directed engineering services which are unplanned, urgent and/or critical to maintaining the project schedule and progression of contract work. An allotment of $10,000 has been assumed for this work. This work will be performed on a Time & Materials (T&M) basis as directed by the County. BUDGET The estimated fee for the additional work described in this Amendment No. 5 is $88,320. We propose to perform this work on a Time and Materials (T&M) basis. The terms and conditions for this added scope of work will remain the same as those listed in the executed contract. Proposed Fees for Amendment 5 Task Task Description Estimated Engineering Fee 1.1 Project Management/Project Meetings $11,942 1.2 Submittal Review/RFI Response/ Design Changes Notices $12,860 1.3 Record Drawings and Project Closeout $24,100 2.0 Stormwater Engineering $29,418 Kittitas County Lower Valley Transfer Station August 21, 2026 Page 4 3.0 Owner Directed $10,000 Sub Total $88,320 CLOSING SCS appreciates the opportunity to continue to provide engineering services to the County on this important project. Please do not hesitate to contact us if you have any questions or comments. Sincerely, Thomas D. Parker, P.E. Michelle Leonard Project Director Vice President SCS Engineers SCS Engineers