HomeMy WebLinkAboutCH Server Room - AC Replacement Proposal 1111 Fawcett Avenue, Suite 100  Tacoma, Washington 98402 T 253.383.3257  F 253.383.3283  general@hultzbhu.com June 17, 2026 Kittitas County 205 W 5th Avenue, Suite 105 Ellensburg, WA 98926 Attention: Charlie Smith Subject: Courthouse Server Room - AC Replacement Engineering Services Proposal Dear Charlie: Here is our proposal to provide engineering services for this project. Project Description Replace two split system HVAC units serving the server room at the Courthouse. New unit will be same size as the existing. Project will be publically bid. Scope of Services Design Phase: Provide field reviews, engineering, drawings, and specifications to allow for the work. Construction cost estimates and updated schedules are included with each progress submittal. A 60% progress set, 90% progress set, and final 100% (bid ready) set of submittals are included. We assume you will provide us the Division 00 contract documents (bid form, contract, etc.). Bid Phase: Attend the pre-bid meeting, respond to bidder questions, review substitution requests, issue any required addenda, and review bids. Construction Phase: Attend the pre-construction meeting, review product submittals, answer contractor questions, conduct and attend virtual meetings during construction (assume 4), provide one site visit during construction, review pay requests, provide one punchlist review, one punchlist back check, and review project closeout documents (O&M manual, generator test reports, etc.). Proposed Fee We propose to provide our services on an hourly charge basis, not to exceed our authorized fee without your prior permission. Fee summary: Engineering: Discipline Design Bid CA Totals Mechanical $11,315 $2,095 $8,015 $21,425 Electrical $3,855 $485 $2,100 $6,440 Total $27,865 Reimbursable: June 17, 2026 Kittitas County Courthouse Server Room - AC Replacement Engineering Services Proposal Page 2 Mileage $ 800 Printing $ 100 Total Reimbursable $ 900 Reimbursable costs will be billed as incurred in accordance with County requirements. Total not-to-exceed fee with Reimbursable: $ 28,765 See the attached for a list of expected engineering tasks and hours. Preliminary Schedule Assuming a notice to proceed by July 15th, here is a preliminary schedule. Task/Activity Completion Date NTP July 15, 2026 60% Submittal August 5, 2026 90% Submittal August 19, 2026 Final Bid Set August 29, 2026 Bid Set Released September 2, 2026 Bids Due September 23, 2026 Contractor NTP October 3, 2026 HVAC Equipment On-Site November 14, 2026 Substantial Completion December 5, 2026 Final Acceptance December 19, 2026 We appreciate this opportunity to work with you. Sincerely, Hultz|BHU Engineers Inc. Rick Hultz, PE Principal Attached: Estimated Tasks/Hours, 2 pages Hultz/BHU Engineers (253) 383-3257 Consulting Engineers Project:Kittitas County Courthouse Server AC Units Work:Mechanical Engineering Page 1 - Assoc Senior Senior Project Project Senior CAD .- Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical Design Phase Kick-Off Meeting 0.5 0.5 Site Visit 0.5 6 Develop ACAD Background 1 6 G#-Cover Sheet 1 1 M#-Legend/Notes 2 1 M#-Schedules 0.5 2 2 M#-HVAC Plan 0.5 12 8 M#-Details 4 2 Specifications - Technical 0.5 6 4 Coordination 2 Project Schedule 1 Meetings 2 QC Review 0.5 2 Progress Submittal(s) 0.5 2 2 Cost Estimate(s) 3 Respond to Review Comments 0.5 Permit Forms 1 Hour Total 3.5 0 0 0 48 0 0 22 4 Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 Labor Cost Sub-Totals $875 $0 $0 $0 $7,680 $0 $0 $2,420 $340 DESIGN PHASE TOTAL:$11,315 - Assoc Senior Senior Project Project Senior CAD .- Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical Pre-Bid Meeting 6 Substitution Request Review 2 Bidder Questions 1 Addenda 1 2 1 Hour Total 1 0 0 0 11 0 0 0 1 Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 Labor Cost Sub-Totals $250 $0 $0 $0 $1,760 $0 $0 $0 $85 BID PHASE TOTAL:$2,095 - Assoc Senior Senior Project Project Senior CAD .- Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical Pre-Con Meeting 0.5 5 Submittal Reviews 1 8 4 Submittal Re-Reviews 2 1 Meetings (Virtual) 1 6 1 Site Visi (1) 5 RFI's ` 2 1 Pay Reviews 2 Punchlist 0.5 5 1 Backcheck 5 Closeout Review 1 Hour Total 3 0 0 0 41 0 0 1 7 Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 Labor Cost Sub-Totals $750 $0 $0 $0 $6,560 $0 $0 $110 $595 CONSTRUCTION PHASE TOTAL:$8,015 TOTAL ALL PHASES:$21,425 - Assoc Senior Senior Project Project Senior CAD .- Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 NIC = Not Included 6/17/2026 E N G I N E E R I N G H O U R S BID PHASE CONSTRUCTION PHASE Hourly Rates DESIGN PHASE Hultz/BHU Engineers (253) 383-3257 Consulting Engineers Project:Kittitas County Courthouse Server AC Units Work:Electrical Engineering Page: 2 - Assoc Senior Senior Project Project Senior CAD .- Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical Site Visit See Mechanical Confirm Loads 3 E#-Legend/General Notes 1 1 E#-Power Plan(s) 0.5 2 1 E#-New Panel Schedules 1 1 E#-New One Line Not Included Specifications - Technical 3 1 Coordination 2 Meetings 1 QC Review 1 1 1 Progress Submittal(s) 1 1 Cost Estimate(s) 0.5 2 Hour Total 2 0 0 0 17 0 0 5 1 Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85 Labor Cost Sub-Totals $500 $0 $0 $0 $2,720 $0 $0 $550 $85 DESIGN PHASE TOTAL:$3,855 - Assoc Senior Senior Project Project Senior CAD .- Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical Pre-Bid Meeting Not included Substitution Request Review 0.5 Bidder Questions 1 Addenda 1 1 Hour Total 0 0 0 0 2.5 0 0 0 1 Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 Labor Cost Sub-Totals $0 $0 $0 $0 $400 $0 $0 $0 $85 BID PHASE TOTAL:$485 - Assoc Senior Senior Project Project Senior CAD .- Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical Pre-Con Meeting 1 Submittal Reviews 4 2 Submittal Re-Reviews 1 Correspondence Review 1 Meetings (Virtual) 2 Site Visits Not Included RFI's 0.5 1 0.5 Punchlist See Mechanical Backcheck See Mechanical Closeout Review See Mechanical Hour Total 0.5 0 0 10 0 0 0 0.5 2 Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 Labor Cost Sub-Totals $125 $0 $0 $1,750 $0 $0 $0 $55 $170 CONSTRUCTION PHASE TOTAL:$2,100 TOTAL ALL PHASES:$6,440 - Assoc Senior Senior Project Project Senior CAD .- Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 NIC = Not Included E N G I N E E R I N G H O U R S Hourly Rates DESIGN PHASE BID PHASE CONSTRUCTION PHASE 6/17/2026