My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CH Server Room - AC Replacement Proposal
>
Meetings
>
2026
>
09. September
>
2026-09-01 10:00 AM - Commissioners' Agenda
>
CH Server Room - AC Replacement Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2026 12:05:13 PM
Creation date
8/27/2026 12:04:41 PM
Metadata
Fields
Template:
Meeting
Date
9/1/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Task Order #2 with Hultz BHU for the Courthouse IT Server Room A/C Project
Order
19
Placement
Consent Agenda
Row ID
148367
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1111 Fawcett Avenue, Suite 100 Tacoma, Washington 98402 <br />T 253.383.3257 F 253.383.3283 general@hultzbhu.com <br />June 17, 2026 <br /> <br /> <br />Kittitas County <br />205 W 5th Avenue, Suite 105 <br />Ellensburg, WA 98926 <br /> <br /> <br />Attention: Charlie Smith <br /> <br />Subject: Courthouse Server Room - AC Replacement <br /> Engineering Services Proposal <br /> <br />Dear Charlie: <br /> <br />Here is our proposal to provide engineering services for this project. <br /> <br />Project Description <br /> <br />Replace two split system HVAC units serving the server room at the Courthouse. New unit will be same <br />size as the existing. Project will be publically bid. <br /> <br />Scope of Services <br /> <br />Design Phase: Provide field reviews, engineering, drawings, and specifications to allow for the work. <br />Construction cost estimates and updated schedules are included with each progress submittal. A 60% <br />progress set, 90% progress set, and final 100% (bid ready) set of submittals are included. We assume you will <br />provide us the Division 00 contract documents (bid form, contract, etc.). <br />Bid Phase: Attend the pre-bid meeting, respond to bidder questions, review substitution requests, <br />issue any required addenda, and review bids. <br />Construction Phase: Attend the pre-construction meeting, review product submittals, answer contractor <br />questions, conduct and attend virtual meetings during construction (assume 4), provide one site visit <br />during construction, review pay requests, provide one punchlist review, one punchlist back check, and <br />review project closeout documents (O&M manual, generator test reports, etc.). <br />Proposed Fee <br /> <br />We propose to provide our services on an hourly charge basis, not to exceed our authorized fee without <br />your prior permission. Fee summary: <br /> <br />Engineering: <br />Discipline Design Bid CA Totals <br />Mechanical $11,315 $2,095 $8,015 $21,425 <br />Electrical $3,855 $485 $2,100 $6,440 <br />Total $27,865 <br />Reimbursable:
The URL can be used to link to this page
Your browser does not support the video tag.