Loading...
HomeMy WebLinkAboutSheriif Generator Replacement Proposal 1111 Fawcett Avenue, Suite 100  Tacoma, Washington 98402 T 253.383.3257  F 253.383.3283  general@hultzbhu.com June 10, 2026 Kittitas County 205 W 5th Avenue, Suite 105 Ellensburg, WA 98926 Attention: Charlie Smith Subject: Sheriff’s Office – Generator Replacement Engineering Services Proposal Dear Charlie: Here is our proposal to provide engineering services for this project. Project Description Replace two propane generators serving the Sheriff’s office with a new one. Generator loads will be revised to add items not currently on the generator. Panels and transfer switch arrangement will be reviewed and revised to suit the new generator and new loads. Propane fuel tank and piping will be reviewed and revised as needed to accommodate the new generator sizing and configuration. Project will be publically bid. Scope of Services Design Phase: Provide field reviews, engineering, drawings, and specifications to allow for the work. Construction cost estimates and updated schedules are included with each progress submittal. A 60% progress set, 90% progress set, and final 100% (bid ready) set of submittals are included. We assume you will provide us the Division 00 contract documents (bid form, contract, etc.). Bid Phase: Attend the pre-bid meeting, respond to bidder questions, review substitution requests, issue any required addenda, and review bids. Construction Phase: Attend the pre-construction meeting, review product submittals, answer contractor questions, conduct and attend virtual meetings during construction (assume 4), provide one site visit during construction, review pay requests, provide one punchlist review, one punchlist back check, and review project closeout documents (O&M manual, generator test reports, etc.). Proposed Fee We propose to provide our services on an hourly charge basis, not to exceed our authorized fee without your prior permission. Fee summary: Engineering: Design Bid CA Totals $19,780 $1,735 $10,375 $31,890 June 10, 2026 Kittitas County Sheriff’s Office – Generator Replacement Engineering Services Proposal Page 2 Reimbursable: Mileage $ 900 Printing $ 200 Total Reimbursable $ 1,100 Reimbursable costs will be billed as incurred in accordance with County requirements. Total not-to-exceed fee with Reimbursable: $ 32,990 See the attached for a list of expected engineering tasks and hours. Preliminary Schedule Assuming a notice to proceed by June 24th, here is a preliminary schedule. Generator ordered by the low bid contractor: Task/Activity Completion Date NTP June 24, 2026 60% Submittal August 8, 2026 90% Submittal September 4, 2026 Final Bid Set September 25, 2026 Bid Set Released September 29, 2026 Bids Due October 20, 2026 Pre Con Meeting November 3, 2026 Generator On-Site February 23, 2027 Substantial Completion April 9, 2027 Final Acceptance April 23, 2027 We appreciate this opportunity to work with you. Sincerely, Hultz|BHU Engineers Inc. Rick Hultz, PE Principal Attached: Estimated Tasks/Hours, 2 pages Hultz/BHU Engineers (253) 383-3257 Consulting Engineers Project:Kittitas County Work:Electrical Engineering Page: 1 - Assoc Senior Senior Project Project Senior CAD .- Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical Site Visits 0.5 11 Create Panels/One-Line 2 Confirm Loads/Gen Adds 1 6 Create ACAD Backgrounds 2 6 Propane Sizing 0.5 4 G#-Cover Sheet 2 2 E#-Legend/General Notes 1 2 E#-Site Plan 2 2 E#-Power Plan(s) 0.5 8 8 E#-Propane Tank/Piping 1 5 3 E#-New Panel Schedules 4 2 E#-New One Line 0.5 4 2 Catalog Cuts & Revisions NIC System Narratives NIC Specifications - Technical 1 8 3 Obtain Div 00 Docs--Format/Revise 0.5 2 Coordination 4 Schedule Review 1 Meetings ` 3 QC Review 2 1 1 Progress Submittal(s) 0.5 1 1 1 Cost Estimate(s) 1 8 Permit Submittal 1 Hour Total 9 0 0 80 0 0 0 29 4 Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85 Labor Cost Sub-Totals $2,250 $0 $0 $14,000 $0 $0 $0 $3,190 $340 DESIGN PHASE TOTAL:$19,780 - Assoc Senior Senior Project Project Senior CAD .- Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical Pre-Bid Meeting 5 Substitution Request Review 1 Bidder Questions 1 Addenda 1 1 1 Hour Total 1 0 0 8 0 0 0 0 1 Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 Labor Cost Sub-Totals $250 $0 $0 $1,400 $0 $0 $0 $0 $85 BID PHASE TOTAL:$1,735 E N G I N E E R I N G H O U R S DESIGN PHASE BID PHASE 6/10/2026 Project:Kittitas County Work:Electrical Engineering Page: 2 - Assoc Senior Senior Project Project Senior CAD .- Task Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical Pre-Con Meeting 0.5 5 Submittal Reviews 0.5 12 2 Submittal Re-Reviews 2 Correspondence Review 2 Meetings (Virtual) 8 Site Visits 6 RFI's 0.5 2 1 Changes/COP/CP Reviews 0.5 1 1 Pay Reviews 2 Punchlist 0.5 6 Backcheck 5 Closeout Review 2 1 Hour Total 2.5 0 0 53 0 0 0 2 3 Labor Hourly Rate $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 Labor Cost Sub-Totals $625 $0 $0 $9,275 $0 $0 $0 $220 $255 CONSTRUCTION PHASE TOTAL:$10,375 TOTAL ALL PHASES:$31,890 - Assoc Senior Senior Project Project Senior CAD .- Principal Principal Engr Proj Mgr Engr Mgr Designer Tech Clerical $250.00 $225.00 $190.00 $175.00 $160.00 $150.00 $130.00 $110.00 $85.00 NIC = Not Included Hourly Rates CONSTRUCTION PHASE 6/10/2026