Loading...
HomeMy WebLinkAbout2026-08-11-minutes-solid-waste-and-maintenanceKITTITAS COUNTY SOLID WASTE AND MAINTENANCE MINUTES BOCC CONFERENCE ROOM, 205 WEST 5TH ROOM 108 - ELLENSBURG Regular Meeting TUESDAY 2:00 PM Au ust 11, 2026 Board members present: Chairman Brett Wachsmith and Laura Osiadacz Vice -Chairman Others: Patti Stacey, Jesse Cox, Cody Cupp, Charlie Smith, Erica Luce and one member of the public Call to Order at 2:OOpm Citizen Comments (1 min. time limit): None Closed Ryegrass Baleiill Update: Jesse informed the Board he is currently working with engineers and waiting for their review of the site's condition. After the review is received, the department will have a better idea of how to monitor and manage the site to regulation standards in the most cost efficient way for the County. Discuss Ryegrass Liquid Waste Lagoons: Jesse informed the Board the permitting agency for the land application of biosolids has determined the County may lose ability to land apply within three years at the Ryegrass facility. Discussion was held on the significant cost and infrastructure required to keep up with the growing amount of septage the County receives and the issue of not having a guaranteed solution for sustainable disposal and keeping disposal fees feasible for septage pumpers. Further discussion included reaching out to the City of Ellensburg and the need to put a plan in place within the next six months. Septage Fee Update: Jesse presented a yearly revenue and cost tracking spreadsheet for the Ryegrass Liquid Waste Lagoon facility to the Board. Discussion was held on the recent state requirements for septic tanks to be pumped during property transfers and the projected increase of septage the County will receive. Further discussion was held on the history of the lagoons. Patti informed the Board the State has changed the terms of "beneficial use", rates and methods the County can land apply; approved application fields are smaller, making the task more labor intensive and expensive. Lower County Transfer Station Material Stockpile Removal Update: Jesse informed the Board the City is requiring the dirt stockpile from construction of the new Lower Valley Transfer Station to be moved. Jesse explained the cost to move the estimated 30,000 yds of dirt is approximately $700,000.00. The County plans to use the dirt as cover at the Ryegrass LPL. Discuss New Lower County Transfer Station Wind Impacts: Jesse informed the Board he is aware of the public feedback about wind issues at the new transfer station and is currently 2026-08-11 MINUTES 1 working with engineers to remediate issues. Patti informed the Board the engineers are currently conducting a wind study and will modify designs after reviewing the study results. Request Board Approval and Chair's Signature on Change Order #15 with Belsaas and Smith Construction, Inc: Patti explained to the Board C.O. #15 included small "cleanup" change orders along with electrical and infill on the MRW building to reduce wind impacts. Vice -Chairman Osiadacz moved to approve Chair's signature on C.O. #15 with Belsaas & Smith, Inc; Chairman Wachsmith seconded the motion. Motion carried 2-0. Former Lower County Transfer Station Site Remediation Update: Jesse informed the Board Parametrix is working on the draft remediation plan; the plan has also been shared with WM for review. Brief discussion was held on the lease history and the City's potential plans for the site. Direction to Proceed with Establishing a Separate Study Session for the Solid Waste Department: Jesse proposed establishing separate study sessions for the Solid Waste and Maintenance departments. Discussion was held on formal protocol on separating sessions. Vice - Chairman Osiadacz made a motion to separate the study sessions; Chairman Wachsmith seconded the motion. Motion carried 2-0. Saniglaze Discussion: Cody explained to the Board the need for polishing the public restrooms in the Courthouse. Cody presented product samples and a proposal from Pacific Modular and explained the benefits of the product including updated look, easier surface to clean, is anti- microbial as well as less cost and downtime than a full remodel. Cody estimated they could complete at least one bathroom with the 2026 budget. Patti explained the company was on the State's Sourcewell list. The Board directed Cody to request a quote for the restroom most in need of repair and proceed with the project. Facilities Project Updates — Jail, Rodeo Arena & EOC: Cody informed the Board the framing project for the Jail's skylights is ongoing and the doors are scheduled to be installed this week. The final backpunch for the Rodeo Arena is scheduled for this Wednesday and the ribbon cutting ceremony is taking place tonight. Cody informed the Board contractors are beginning to erect the EOC building and the generator is currently enroute from Texas. Request Board's Approval for Chair's Signature on Change Order No.3 for the Search & Rescue/EOC: Patti explained to the Board there were issues getting the secondary conductors to the building due to P.U.D. changing locations. Patti informed the Board work for C.O. #3 also consisted of widening the driveway for the generator access and tree clearing for the flagpole on site. Vice -Chairman Osiadacz moved to approve Chair's signature on C.O. #3 for the Search & Rescue/EOC; Chairman Wachsmith seconded the motion. Motion carried 2-0. 2026-08-11 MINUTES 2 Maintenance Updates: Cody informed the Board several Courthouse mini splits are at end of life and are in need of replacement before winter. Cody informed the Board he found a company that can do night work at the Jail; specifically cleaning the kitchen, including hood vents. Brief discussion was held on past contractors and contract terms. Other Business — No Action to be Taken Concluded 2:48pm Executive Session - Chairman Wachsmith called an Executive Session to order at 2:48 p.m. and announced per RCW 42.30.110 (c), the Board would recess into session for 12 minutes, with no anticipated action, to discuss the consideration of selecting a site or the acquisition of real estate by lease or purchase when public knowledge regarding such consideration would cause a likelihood of increased price. At 3:00 p.m. the Board reconvened from executive session. Meeting adjourned at 3:00pm Erica Luce KITTITAS COUNTY COMMISSIONERS KITTITAS COUNTY, WASHINGTON Brett Wachsmith, Chairman 2026-08-11 MINUTES KITTITAS COUNTY COMMISSIONERS Solid Waste and Maintenance Regular Meeting Tuesday August 11, 2026 - 2:00 PM BOCC Conference Room 205 West Sth Room 108 - Ellensburg 1. Call to Order 2. Citizen Comments (1 min. time limit) 3. Closed Ryegrass Balefill Update 4. Discuss Ryegrass Liquid Waste Lagoons 5. Septage Fee Update 6. Lower County Transfer Station Material Stockpile Removal Update 7. Discuss New Lower County Transfer Station Wind Impacts 8. Request Board Approval and Chair's Signature on Change Order #15 with Belsaas and Smith Construction, Inc 9. Former Lower County Transfer Station Site Remediation Update 10. Direction to Proceed with Establishing a Separate Study Session for the Solid Waste Department 11. Saniglaze Discussion 12. Facilities Project Updates - Jail, Rodeo Arena & EOC 13. Request Board's Approval for Chair's Signature on Change Order No.3 for the Search & Rescue/EOC 14. Maintenance Updates 15. Other Business - No Action to be taken 16. Concluded 17. Executive Session - RCW 42.30.110 To discuss with legal counsel representing the agency matters relating to agency enforcement actions, or to discuss with legal counsel representing the agency litigation or potential litigation to which the agency, the governing body, or a member acting in an official capacity is, or is likely to become, a party, when public knowledge regarding the discussion is likely to result in an adverse legal or financial consequence to the agency. Created on 8/26/2026 8:51:28 AM KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS STAFF REPORT STUDY SESSION DATE: August 11, 2026 ACTION REQUESTED: Informational update regarding the Ryegrass Bale Fill and planning beyond the 30-year post -closure period. BACKGROUND: The Ryegrass Bale Fill is a closed landfill that remains subject to post -closure monitoring, maintenance, and regulatory requirements. As the facility approaches the 30-year post - closure milestone, the County is beginning to evaluate the steps that may be necessary to demonstrate that the site can move beyond its current post -closure status. DISCUSSION: Staff have begun preliminary discussions with the County's contracted engineering team regarding the site's current condition, available monitoring information, and potential remaining requirements. These discussions are intended to identify whether additional evaluation, documentation, monitoring, or site work may be needed before the County can pursue the next regulatory step. The approach is still being developed and will depend on the engineering review and future coordination with the appropriate regulatory agencies. Reaching the 30-year milestone does not automatically end post -closure obligations, but it provides an appropriate point to assess the path forward. FISCAL IMPACT: The fiscal impact has not yet been determined. Any future costs will depend on the additional engineering, monitoring, documentation, or site work identified through the preliminary review. RECOMMENDATION: ATTACHMENTS: No formal action is requested. None LEAD STAFF: Jesse Cox, Solid Waste Director KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS STAFF REPORT STUDY SESSION DATE: August 11,2026 ACTION REQUESTED: Informational discussion regarding the long-term future of the County's septage lagoon system. BACKGROUND: Kittitas County Solid Waste operates the County's septage lagoon system, which is currently at capacity. The system depends on periodically removing accumulated septage and land applying the material. The County may lose the ability to land apply within approximately three years, requiring another method of treatment, transport, or disposal. Because major infrastructure takes significant time to plan, permit, finance, and construct, staff is raising the issue now to begin discussion regarding the County's long-term role. DISCUSSION: The County will need to consider the long-term feasibility of continuing to operate the septage lagoons. Potential alternatives would require significant capital investment and increased operating expenses, which would likely result in substantially higher septage rates. Even with this investment, the County could not guarantee a permanent solution because future operations would remain subject to permitting requirements and disposal limitations. Beginning this discussion now provides time to evaluate whether continued County operation will remain sustainable over the long term. FISCAL IMPACT: Any County -funded alternative would require capital planning and, because the system is supported by user fees, would place upward pressure on septage rates. RECOMMENDATION: Discuss the long-term future of the septage lagoon system. No formal action is requested. ATTACHMENTS: None LEAD STAFF: Jesse Cox, Solid Waste Director KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS STAFF REPORT STUDY SESSION DATE: August 11, 2026 ACTION REQUESTED: Informational discussion regarding the five-year septage rate review. BACKGROUND: The County septage lagoon system is supported by user fees rather than the General Fund. The current septage fee is $0.28 per gallon. Staff reviewed five years of operating revenues and expenses to evaluate whether the existing rate remains sufficient to recover current costs and support the long-term financial needs of the system. DISCUSSION: Annual revenues have generally exceeded routine operating expenses by a limited amount. However, the system also requires funding for irregular and potentially significant expenses, such as lagoon maintenance, relining, contractor cost increases, and other necessary capital work. When proposed fee updates occur, they intend to maintain cost recovery and provide reasonable capacity to address these expenses without relying on other County funding sources. Provided are the results of the five-year review and the basis for any proposed rate. FISCAL IMPACT: The financial effect will depend on the final rate adopted and the volume of septage received. RECOMMENDATION: Discuss the five-year rate review and the basis for any future proposed septage fees. No formal action is requested. ATTACHMENTS: Septage Yearly Revenue and Cost Tracking Sheet LEAD STAFF: Jesse Cox, Solid Waste Director m N -G O (D N � N Z (D c (D - N O � N (D (N CU n O N 0 N N O N CT O N N 0 0 0 0 0 0 o m � o, o m > D rn!cNn 0 0 0 0 0 0 0 ci i 1 N N co co cn N N N NI--1-1 N O N O � � - - co OD -I OD � CD W A. Al .A• 'J ? 74 v O) V -- C;) Cr l O) m N CA O olCCAol((A W W - W -69 0) 0) O p I OD O I0) N--4 I N � CO CD c(00 O cn O -L O .69 Ln U1 U7 OD OD W N - CD 0) 14 - O - �4 CO O N -4 f9-696940E94 U1 CA W W N t CA O N OD O OD CO OD CO -A (n -4 -• OD O CO O -I W - N W L W O) :a CD W cn V Y40 co N V Cf1I CA i 0) ice: -1 0) CO co W O QO 00 N O O O O O O O O N N N N N N -60 ifl 4.9 Efl ffl (A ffl (A O O O O O O O O _1 W �I w O C3i O h m W CO O -ph� O M N co O W w CY) O (fl 0) � --A O Ln 0) CCn 0 1 � CD CD v CD z O Cy O C7 m Oc C C7 N tD CD CD 1 O v z (D w c) a) C) 0 CD %-h O n� `G KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS STAFF REPORT STUDY SESSION DATE: August 11, 2026 ACTION REQUESTED: Informational discussion regarding removal of the material stockpile at the new transfer station. BACKGROUND: Construction of the new transfer station generated approximately 30,000 cubic yards of excavated material that is currently stockpiled onsite. The material was retained for potential beneficial use, including future cover needs at the Ryegrass facility. Due to the volume of material involved, moving the stockpile will require substantial equipment, transportation, and placement work. DISCUSSION: The stockpile will need to be removed as part of the County's long-term management of the new transfer station site. The preliminary cost of removal is approximately $700,000. This estimate reflects the volume of material and the anticipated costs of loading, hauling, and placing it at an appropriate location. Staff is raising the issue now so the anticipated expense is considered as part of future operational and capital planning. FISCAL IMPACT: The preliminary cost of removing the stockpile is approximately $700,000. Actual costs will depend on the final destination, transportation distance, equipment requirements, and the extent to which the material can be beneficially reused. RECOMMENDATION: Discuss the anticipated removal of the material stockpile and associated cost. No formal action is requested. ATTACHMENTS: None LEAD STAFF: Jesse Cox, Solid Waste Director KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS STAFF REPORT STUDY SESSION DATE: August 11, 2026 ACTION REQUESTED: Informational discussion regarding wind -related operational improvements at the new transfer station. BACKGROUND: Since the new transfer station became operational, the effects of strong winds at the site have become more apparent. Wind conditions can affect the movement of loose material, litter control, and day-to-day facility operations. These impacts are being evaluated to determine whether practical improvements can be made to improve operations and site control. DISCUSSION: The engineering team that was contracted through the Solid Waste Dept is reviewing the wind -related conditions observed since the facility opened and is working to identify practical improvements. The evaluation will consider potential facility or site modifications along with operational measures that may reduce wind impacts. Staff is raising the issue now to make the Board aware of the conditions and the work underway before any specific improvement project is proposed. FISCAL IMPACT: The fiscal impact has not yet been determined. Costs will depend on the improvements recommended through the engineering evaluation. RECOMMENDATION: Discuss the wind -related operational impacts and the engineering work underway. No formal action is requested. ATTACHMENTS: None LEAD STAFF: Jesse Cox, Solid Waste Director KITTITAS COUNTY Board of County Commissioners AGENDA STAFF REPORT AGENDA DATE: August 5, 2026 ACTION REQUESTED: Recommend Boards Signature on Change Order Number 15 with Belsaas and Smith Construction, Inc. BACKGROUND: On September 3, 2024, the Board of County Commissioners approved a resolution to award the bid for the Lower County Transfer station to Belsaas & Smith Construction Inc. We have completed the review of change order proposals (COP) COP 74, 75 and #76. These proposals have been incorporated into Change Order No. 15 and is ready for the Boards approval and signature. INTERACTION: Belsaas & Smith Construction, and SCS Engineers RECOMMENDATION: Recommend Boards approval and signature on Change Order No. 15 with Belsaas & Smith Construction. HANDLING: Original — Clerk of the Board ATTACHMENTS: Change Order No. 15 with attached COP's. LEAD STAFF: Patti Stacey, Facilities and Waste Operations Director Kittitas County Solid Waste 925 Industrial Way Ellensburg, WA 98926 August 4, 2026 Belsaas and Smith Construction 103 East 4th Avenue, Suite 209 Ellensburg, WA 98926 Project: Lower Valley Transfer, Change Order No. 15 Mr. Nelson, I am writing to formally acknowledge and award change order number 15 for the following Change Order Proposals (COP): COP #74 Grinder Electrical $157,353.46 COP #75 Grinder Shed $33,680.55 COP #76 MRW North Wind Wall $70,477.93 Change Order No. 15 Total $261,511.94 Base Bid and Additive A2 $18,441,939.80 Additive Al $642,000.00 Change Order No. 2 <$11,754.08> Change Order No. 3 <$28,041.41> Change Order No. 4 $145,224.93 Change Order No. 5 $233,662.44 Change Order No. 6 <$24,051.84> Change Order No. 7 $96,439.74 Change Order No. 8 $104,401.24 Change Order No. 9 $127,737.00 Change Order No. 10 $46,392.94 Change Order No. 11 $49,209.69 Change Order No. 12 $142,300.43 Change Order No. 13 $68,044.01 Change Order No. 14 $123,878.51 Change Order No. 15 $261,511.94 Subtotal $20,482,742.67 WSST $1.756 024.93 Total $22,238,767.60 Please consider this letter as our formal acceptance of the change order. We look forward to successfully completing this project together with these agreed -upon adjustments. Thank you, ryan Nelson Secretary Belsaas and Smith Construction 103 E 4th Ave # 209 Ellensburg, WA 98926 Brett chsmith Chair, Board of County Commissioners Kittitas County 205 W 5th Ave #108 Ellensburg WA 98926 QBELSAAS P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 ELLENSBURG, WA 98926 509-925-9747 FAX: 509-962-3031 SMITH brandon@belsmith.com BELSASC0330H June 9,2026 Re: Grinder Shed and Grinder electrical Per the description below, we present the following change order proposal #74 (COP#74). COP #74 includes all the labor and materials needed to install: • Branch circuit for the shed light, convenience receptacle, and AC receptacle • Ground rods and electrodes for the shed • Exterior raceways to be run above grade from shed to the grinder • Raceways, conductors, and connections for grinder control and equipment. Option A: Vermeer recommended VFD Cable Option B: Vermeer allowable substitute XHHW CU Wire Due to the lack of readily available information and the issues encountered after the equipment arrived onsite, Belsaas is requesting a time extension of 116 calendar days. The grinder shed and surrounding area were not shown or identified on the contract drawings. Once the equipment arrived onsite, numerous discrepancies were discovered between the conditions shown on Vermeer's drawings and the actual field conditions. These discrepancies included: • The electrical panel that arrived onsite differed from the panel shown on Vermeer's drawings. The control panel was not UL listed as anticipated. Due to these discrepancies, additional coordination and communication with Washington State Labor & Industries (L&I) was required to verify that the grinder shed installation and configuration would be acceptable and compliant. The unforeseen site conditions, design discrepancies, and resulting regulatory coordination efforts impacted the project schedule and were outside of Belsaas's control. Therefore, Belsaas respectfully requests a time extension of 116 calendar days to account for these delays. Total cost added to contract Time extension required: 116 days Base + Option A: $164,407.86 + WSST Base + Option B: $157,353.46 + WSST Sincerely, Ri|eyEres, 8ebaasQ'Smith Construction 1111111111111111111111111111111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII CL 111 IIIIIIII�IIIIIIIIIIIIIII CN 0 CN COIIIIIIIIIIIIIIIIIIII UJ w r U)• Iglllllllllllllllll ui _j U) 0 CL 0 w Q- UJ 0 0 w z <....:............... m 0 w uj � M D cr C) w cr- w Z (0-) 0 w CL z LLJ 0 F- X W LU uj 5 0 p z IIIININIIIIIIII��IIIIIIIIIIIII oz cn �IIC�IIIIIIIIIIIIIINIIIIIIIIIIf 10 w iiiiiiiiiiiiiiiiiii 0 U IIIIIIIIIIINIIIIIII ry CL w 11 I.e 1111 (D < w r m i 0 0 'el se11111 ...... w (D z C) Z w =) (-)0 02 QQ 00 t- z F- < C) w � 2 F- �- z U) 0 (-)0 w wLL "r LL F- < w a U) Z < U) -j H w r > F- 0 w w U) w w w 3: ter:. TITAN ELECTr210AL TO: Riley Eres Contractor Belsaas & Smith Construction FROM: Ian Toms Subcontractor Titan Electrical LLC CHANGE TITLE I Grinder Installation (Base Total) THIS CONTRACT WILL BE MODIFIED AS FOLLOWS: Project: Lower Valley Transfer Station 2603 Green Ave Ellensburg, WA 98926 Subcontract # Date: 6/8/2026 Change # 34 Amount: $80,462.50 Initiated By: Titan Electrical Reason: Design Change Type: Additive - Lump Sum Grinder Installation and Shed Wiring ■ F&I raceways, conductors, and connections for grinder control cabinet and equipment ■ Exterior raceways to be run above grade in GRC from shed to equipment per Owner direction ■ F&I branch circuit for shed light, (1) 120V 20A convenience receptacle, and (1) 120V 20A receptacle for existing AC unit ■ F&I Ground rods and electrode for shed structure Mill Motor Wiring **NOT INCLUDED IN TOTAL BELOW, PLEASE SEE ADDITIONAL SHEETS FOR OPTION A AND OPTION B PRICING** ■ Option A. Provide Belden 29534 VFD cable per Vermeer Installation wiring recommendation ■ Option B. Provide XHHW CU wire alternative Clarifications ■ Steel frame required for cabinet mounting to be fabricated and installed by others. Dimensions to be determined prior to installation ■ Setting and securing cabinet by others. Coordination with Titan will be required for feeder wire routing ■ Deviations from this scope and means/methods, commissioning of equipment, and alterations requested byAHJ are not included Cost Breakdown This Change: Labor $42,996.20 Material $24,055.88 Other O&P $13,410.42 Total $80,462.50 Page 1 of 2 Authorized By: CONTRACTOR Signature: Print Name: Title: Date: Accepted By: Signature: Print Name: Title: Date: SUBCONTRACTOR 0 N m 0 0 co 0 m 0 m 0 w (N m O a 0 0 0 m w 0 N 'IT to 0 0 0 0 0 0 m 0 0 0 0 0 0 'IT m CL (D 00 0 N 0 'r C14 0 (N m 0 to 0 to 0 r N co (N 00 0 0 0) M 0 (0 t-- 0 N N(M lzr N0 ---t 'It MM N — N 0 00 0 t-- 0 N6 N0 NN Cq x W 0 0 0 0 m 0 N m 0 0 LO 0 N 0 U) 00 0 0 N to OD U') 0 to 0 0 0 0 N U) LO 0 0 0 0 0 0 0 0 C) 0 to 0 LO f- 0 cc to — U-) 6 o 0 0 0) 6 C6 r- a co — o C5 — C� o 0 C) o o o CON o o ,-z o c) CIJ M 0 0 0 W W 0 W 0 0 f- 0 M M CO to 0 m C14 9 Ctr.-: Ci tfY to Ci (R OR CO q Qq N O m q " r+ N (P 9 9 (q t-- to M M M 2Cl) LO 0 m r- M m !P N 7m n LO 0 co 0 w g T 0 0 8 N to 0) "It r- -It — NN — W N to m 'D OD h.0 In CO u') N Ul r- co — W m 0 0 r- m N w r.- r- m 0 N P, 0 11 0 0 m 0 0 N t- 0 O H 0 It to 04 04 (7) (D o UJ "T 00 — r-� ID Cl) co CR F-- 0 OD to 0 cl) a, It r- ti to " 'It q 7 10 Cl) 10 r1' — — 6. y r- 0 00 0) M U) 00 �r 0 NCc 0 co 0 OD N N OD LO CV) t- 0 LO o -t M — M N N M to N ;zt- N 00 'q 'q CN M 0 LO m 00 LO U) qr to 0 to M N M M r, oo NCl) Cl) I- Cl) 1�1 to N �; co 0 1- U') Cl) cli C) to (0 (0 q q CO It 0 N Lf) 0 0 (D (D CIJ 0 0 a 0 0 0 V) to V) V) V) 0 cl) C*4 �r (0 0c)tfY C14 t- — V 0 0 x O 0 M C u N .2 V7 —M -0 CD -j co -ad -i m 'ro — a) 0 0 M .2 CD .0 0 co (D UJ r E c0 r- ig .2 z .0 0 x n E w m > CD 0 0 0 FD 2 " "5 U) 0 0 w CD E cu co z as z c 2 c (D o c . 0) In 0 0 CD 0) 06 co L O CD 0 m (D a CL 0CL > E E 0 CL co a) g 0 0 o o CL m 70 �5 — = LL 0 c x m = 8 -J >0 'T< W 0 — < L) �o CL X 3: a w 0 ca 'a 0 L) X (D U) co CL E m 0 m co ID uj :3 UJ E .2 2 C WM L) m 0) U) x (D z m 13, N M 0 (D cn 0 w M O 0 :3 0 M "S 0) co Is O R . k rN> I - Q F-U- 15 w NCL CL F- c) w T , U. z x a h U 5 h U E E x cr x - 0 0 a) -T W a. ui w ui Q> D C) x ;o 200 co�R It: 2 cr 0 0 w 0 :n Lli 0 0 0 CN po co ob =T �T 2T 140t . = -C\l q- !6 4 A !6 4 !6 U CN Cl) �t 04 N N N N N co O tD M m m m w M LO 0 N to r- m 't (l Cl) G U) U) w 0 m 00 M w m 0 m w 0 rl- 0 w m Cl) co Cl) Cl) t� t2 C� 0 m f, 0 t-- m m 0 m i a �R ON Cq w to � �R C14 N N N C) to 0 to to to 0 Ul) m (0 (D co �� 0 00 00 0 M LO �t 0 tzr CO N -It o C) o o to M c) OD o 03 CO 0) o N 0 C> <Y r V' -,t LLJ w w w w w w w w U ul 0 1- r- 0 M N U) Nr 0 0 w 0 o C,4 C,4 c) co N C) OD 0 U-) — o CN o o N o o 6 o o I- o N 0 N ld d, r (0 CO "r 0 N Nco 00 a) 0 r- N.0 N CO oo C> co cl) In — t-- 0 co (Ij " LO tr) -,t 0 -ct (1) M 0 M 0 0- 04 0 N M 'IT Cl) cl) CO 00 w :)W(-)Qww(.)Uwu2wm 4) 1- 0 0 't 0 to to M — M 0 0 Q 7 co (q co q 00 llq LO m t,- 0 0 O. C-4 Ln N co CD �; M 0 0 O Cl)- — Cl) LO 0 to �o CII 0 CV 4) C\f V S 0 u 0 0 co co M 0 co w r r E o z 0 E E ca ca ca a) a) > 0 iy 0 '0 c tM 0)C C C. 0 M 0 0 NLoOa 0 co M r 0 CL ED Q 2 M co a: (D w W w 'Cli N cli CV C14 Go O C14 w It 04 Ce) E 000 am) co mt �2 9 Cml) ow) V ru—') ONO 00 'A) I co— �2 1v v ICIII 21 ZIT N- 0 a (0 w 0 N M 0 Cow 0 to 0 0 0 (D 0 N C\j U, U) N 00 Co Co Co (A 0 Ce) to F- N 0 0 w CO ;1- M o vi —, P� . W M r 0 0 N 0 to 0 N q M r r M Fl- I- 'IT Cl) to M 0 C, 7 M U� Co (R q (0 LO to N co co N 00 f, w M N CO O to OR q q CR et O O h . CO 0 M U') N00 in 00 00 0) OD 00N '4T (o 0) M(0 N r- fl- 04 CO t- O 0 > LL U) 0 1% M c Q. 0 0 > 79 v -D Z 0) c C: U) U) :3 0) C C 2 .2 .o t M M 75 (n rn .0 co r w 0 z z Co r Vs M = '5 r - = 1-- () CEL E F- -14 0 a ca 2WO028205 CL -i 00 04 w 0 o 0 w -i CL 0 cli to w co N 0) N N N M C14 LO -T 0) 0 lzr 0 Cl) t- CO CO co N N (0 co w co 0) 0 LO co Co 00 0 0 O M Ln (D CO co co Cl) N N CD N cn 0 0 0 'IT to Ln to w w — — — — — — — U) 00 (D N It CD 0 0 m IL No U) 0) N m b cli 6 N 6 in fl- r- 0 m 0 LO N 6 M N r- 0 OD r W :3 LLJ U g w 0 w w 0 0 w 0 w U U 0 w w w w w w w w 0 0 0 u 0 (0 C) 0 C) 0 0 — 0 0 04 0 U) 0 0 0 0 0 M 0 0 In 0 (D N M 0 0 C) OD 0 0 0 0 0 0 't N w w 0 0 0 0 0 to 0 LO 04 't:r 00 — r M — LO O 't V: 0 0 0 6 C,4 6— a; t-.: o o C� o c) o LO t,: r- 0 0 0 0 0 0 0 0 N CO 0 0 0 m — — — — 04 cl) — m Cl) co Cl) V: C)� U� " C14 to 0 m m t- C) m f- t-- 'IT t- m w 9 0 0 U� 7 C? f (I 0 " . L u) 00 1- N 0 'T N OD 0 r- Cl) r- m 0 1, co (0 (N w CO 0 g 0 m to ce) �t N It 'cr N. V N P, MN c� pl-i co (D N N Cl) W 04 muummmm Ui()WW()WQUW 4) U) I;r 0 C4 0') 't (IR 0) U� p--: m r- OD 0 t- a 0 C) o, V� 00 q Cl? ll� tl- C? �2 Nul 0 (D u) to 0 7 c:> U) r- N (D C14 (0 Q� W U') N q 0 Iq 10 It U') C14 .0 G. LO N NOD N 0 N N m 0 N t- (D . w w :2 c ,0 0 N 1-- 0 0 w t, ItT r- m t- N w w m w to 0 N M to 0 W M M M (1) Cl) r ;: r M CD N r et 0 r N cli 00 U-) r-- O C4 LO N r IT N N T et M CD Cl) co (o Cp M r M W N W N 0 00 0 0 N h r C14 N IT — — Ci 0 -V M 2 t: 0 CL o IL 0 0 co Yco .2 0- E 0 W C 0 = = z < m to 0 n E W C: E z m 0-1 Cl) 0 E ca x c a c 0 c co C) (D a a > co a) m C :3 0 0 0 co Z- x C > C? M X 0 Co co -r- CL m ca 0 a) m 0 U de ca .0 0 :3 E r- C V, C"' x N C�5 D c 4D :3 f- .0 .2 0 a '= w [L 0) (D 6 0 z :D r- 1: x Co r cm m 0 CD m —C, S z z LT ZD o (D 'r-0 CC ML -j 06 15 10 3: = 3: M CL x a co IL in - 1 2 5 E E z o o c < a) CL to (D D — x x OD 00 co C:, w -j 0 0 -j CL (9 m D X 0) m 4) :3 C; T- c) In co R C-4 O 04 m E C14 CO N N N N M N 'Ir to r- "T M 0 N N to w to w w 0 m N LO N Ln 11 N d.M d I-- co (D co 00 CO C') Co to o C) Cl) Cl) Cl) Cl) t (0 CN 0) 0) co 0) 0) m N N N co R to S LO Ul) LO to vi (D to m Cl) 0 Q 00 O to �r N o o 0 0 r- U) 0 N 0 0 0 -It 0 w w 0 w w N w w 0 0 0 U) Q 0 0 0 0 M 0 0 1h- 0 M N M N N N 0 N W M - -'T 0 0 T C> N I- M M CL .0 O Q r r r r C5 C6 6 6 -" 6 6 0 C; 6 -" C; 6 6 6 6 6 6 6 r r N -, o 6 6 6 6 ui ui U w U U U U w w w w w w w w w w w w w U U U w 2 2 2 w w w w 00 0 a 0 tn 0 0 c 0 :� �t 0 N �2 w 0 0 0 0 0 LO to to LO 0 C) f- tn C) NCO CO CO 0 0 0 0 M00 0 0 N Cl) - - o 0) o t- o d r-- C6 6 6 o . 6 0 o 6 o o 6 6 o 6 4 4 6 6 6 N 6 6 6 6 04 - m 4) (o (0 (3) 0 co C) 00 10h OM q CO r t0 w to 0 r- (0 0 w 0 0 m N r 0 w 0 Q Q m m t0 m rl- w 't 04 00 r 04 0 (71 OT (0 CN N (0 Cl) r Cl U*, CO O 14) 0 It r C) Ci U) - G.m r- c) o r- o to m m 0 N 't (D - - 0 - N OD N OD C� 0 N CO M r, 'IT C> M Cl) OD 4 to co m to ce) tc) v co uj Lu 0 ui U 0 U U L) C) L) C) C) 0 C) 0 (.) w w 0 U U U v U g Lu ui (D 04 0) 0 P- 0 U0 fl- 0 t0 o W 00 N Q 00 'It U) CO 0 t- N 0 LO r 0 M 04 00 (D M IT LO 04 to h- 00 LO UO q 04 CO h 00 OA q M U) N 0 r O M C14 0 CO r (0 M N tb U) t0 'IT Nr IL P- 0 OD 0 (o N r, Nf�- 00 0 0) (D f- 00 Cr) N (D 1'- CO 00 0 OD it00 0) r'- t*:: M(0 LO LO LO 00 co U) 0 N m 'IT m (0 LO Cl) U) It N -It Cl) ON NM N m m oc� Q N In C) to co 0 U) "T CN - 0 0 0 N 'T N It N N "T N N q� "T N -4* M M M N N N C\l N w S 0 X 0 4 m p m a 0 .2 0 00 7i m m .2 r ui tu :2 z c :3 ca 0 m E to E N ca m 4) 0 N 0 > (D (D 0 c m .h- c o c b 0 0 �e a. c c 0) Im U 06 ,. 0 0 c 0 a) > G 0 CL a 0 8 u a5 > Co Co CL E x :2 00 (D z z 1 0. i-, m U) 7� .6 -0 -0 2 o (n U) c Q "- — E (n U) o U) U) o cL a 5 -6 (D U) U) E - 0 E C:a, (D r 0 0 g 220 cp' e L) E o CL (L z z Z (D 0 Co CL 0) 0- U) z z U) 0) '5 Z *5 2 X X ?�, E w 0 LL 0 E E 06 'a X 1: m co 0 0 u Q 0 - - a 3 m Z: 0 :3 F— L > ry 0) M co a. cn U) (n 0 cr a, a 3 co R N LO O CM N C14 0) N LO 00 00 0 m m o 'o g 't co .g CO0 0 co m co w r- Cl) LO N CO w 0 'IT T mo N N m It Ul) CO0 �o r- COo �2 �? v — li � 'L� !� CO�R v a m m w N N N CN N N N N m 'IT 'IT I�r 8 W) 4) tm 2CO 0) 00 N �.4 0 04 GO o o (o W jaa6o6 o o6 aN i C6 w D ui o 0 U ui LLJ ui LLJ U') 0 0 § § LO % 0 c) m (m N c) C:) o co m 0 1,. (0 00 00 0 0 0 00 cl 17 tP " q q cl OR .0 r-MNOLOOOOOO) (L in tr) C14 to w :D 0 2 (.) LLJ 0 0 uj 0 .0 Lo 0 C') N to (o Ul 0 'It m 17 O� C) q r.- 00 CN C) 8 c) N LO a t3l 't C\j 2 C14 V .r- 0 0 y � CL m .2 0 "D \ § k ) co V w 0 C 0 n E LUX E CL O)a CO .—a uj m co CD 0 = (D c m c 0 iM 5 a) z U) Lu CL (n co 0 CL ■ 'a 2 x (D C-4 N E m c) m 'T co 8 v;z — 7 �! w 2 to CD r- r- P- 6/4/2026 2:20:20 PM Titan Electrical LLC Page 1 Lower valley transfer station, (kittitas) : PCO 034- Grinder Wiring Totals (Summary) - Bid Summary: Grinder Installation Breakout Material Non -Quoted $24,055.88 Quotes 0.00 Sales Tax (0.00%) 0.00 Total Material $24,055.88 Labor Direct (373.88 hours @ $115,00) $42,996.20 Non -Productive Labor 0.00 Total Labor (373.88 hours) $42,996.20 Direct Job Expenses $0.00 Tools and Miscellaneous Materials 0.00 Subcontracts 0.00 Job Subtotal (Prime Cost) $67,052.08 Overhead (10.00%) 6,705.21 Profit (10.00%) 6,705.21 Job Total $80,462.50 Actual Bid Price $80,462.50 Material to Direct Labor ratio: 0.36 Prime Cost per square foot $0.00 Job Total per square foot $0.00 Actual Bid Price per square It $0.00 Labor cost per square foot $0.00 Labor hours per square foot 0.00 Gross Profit % 16.67 Gross Profit $ $13,410.42 Net Profit % 8.33 =1 r=. TITAN E L E C T R I C A L TO: Riley Eres Contractor Belsaas & Smith Construction FROM: Ian Toms Subcontractor Titan Electrical LLC Project: Lower Valley Transfer Station 2603 Green Ave Ellensburg, WA 98926 Subcontract # Date: 6/8/2026 Change # 34 Amount: $63,125.15 Initiated By: Titan Electrical Reason: Design Change Type: Additive - Lump Sum CHANGE TITLE I Grinder Installation (Option A- VFD Cable) THIS CONTRACT WILL BE MODIFIED AS FOLLOWS: Mill Motor Wiring ■ Option A. Provide Belden 29534 VFD cable per Vermeer Installation wiring recommendation Clarifications ■ Steel frame required for cabinet mounting to be fabricated and installed by others. Dimensions to be determined prior to installation ■ Setting and securing cabinet by others. Coordination with Titan will be required for feeder wire routing • Deviations from this scope and means/methods, commissioning of equipment, and alterations requested by AHJ are not included Cost Breakdown This Change: Labor $16,717.55 Material $35,886.74 Other O&P $10,520.86 Total $63,125.15 Page 1 of 2 6/8/2026 11:22:04 AM Titan Electrical LLC Page I Lower valley transfer station, (kiftitas) : PCO 034- Grinder Wiring Totals (Summary) - Bid Summary: Mill Motor (VFD Cable Option) Material Non -Quoted $35,886.74 Quotes 0.00 Sales Tax (0.00%) 0.00 Total Material $35,886.74 Labor Direct (145.37 hours @ $115.00) $16,717.55 Non -Productive Labor 0.00 Total Labor (145.37 hours) $16,717.55 Direct Job Expenses $0.00 Tools and Miscellaneous Materials 0.00 Subcontracts 0.00 Job Subtotal (Prime Cost) $52,604.29 Overhead (10.00%) 5,260A3 Profit (10.00%) 5,260.43 Job Total $63,125.15 Actual Bid Price $63,125.15 Material to Direct Labor ratio: 0.68 Prime Cost per square foot $0.00 Job Total per square foot $0.00 Actual Bid Price per square It $0.00 Labor cost per square foot $0.00 Labor hours per square foot 0.00 Gross Profit % 16.67 Gross Profit $ $10,520.86 Net Profit % 8.33 0 0. 0 0 fl 4 0 0 M o 00 U. M 0 > — 0 o LU E 0 0 z 0 LT x n E LU E r N m 4) in 0 -i c 0 a C-4 co IT 0) U) m I�r co (D m 'IT co rl- Cl) 0 m 00 0 — 0 co m 4 N cli 6 r 6 4 4 4 in 'IT 'IT N — N 6 L6 — 0 0 0 w w w w w w w w w w 0 0 2 2 w w 0 0 0 O 0 p N r- m w m LO t.- 0 0 0 LO w r- lp O) 0 M Cl) (P U? U) CO U) W O) IR q N M 10 U) N (D 0 w 0 0 w N 0 0 N 0 w m w 0 0 �r I;r r,! "tt 'It r*-: V: 9 9 0� r-: 0� cq q 1� 9 9 r,� P.: m f.0 A N m :� 0 w 0 0 Z; m m 0 0 0 0 M r� Nr co co N 0 co co co 00 04 m N q, — M N m co co N r 0) Cto l) m to N 0 w u w w w w w 0 0 w 0 w w Q 2 2 w w m N �; �! 0 �e 0 0 w m U)0 m (D w w w 0 0 f- U) (l: . (p N 'IT U) <0 0 Cl Cl) CO . It CO 0 0 ce) (D M MN U) LO LO N 0) T mco m Cl) � C\l 0) LO 0 0 — M 'r V — � (D r r N Uo !g 0 NM N ce) (D ces z 0 cu m 0 0) > 2 0 0 C F- U- .0 0 0 Z5 , cc m m 0 0 It > -j m co C) .2 2 c . 0 0) 0 aCD E .2 0 CO r- 'm -S x m m 20 0 aQ) a) F- (D M U- 0 LL, LLI 'Z5 'M o E E & .2 M Ir o o 0 .2 i5 CD ui :3 a s 0 D U) M�2 of !�2 — �2 �R �2 24 N'N'- MO 'zrr 'Tt 0 1r TITAN ELEC "rR L- 10 1 TO: Riley Eres Contractor Belsaas & Smith Construction FROM: Ian Toms Subcontractor Titan Electrical LLC Project: Lower Valley Transfer Station 2603 Green Ave Ellensburg, WA 98926 Subcontract # Date: 6/8/2026 Change # 34 Amount: $56,964.10 Initiated By: Titan Electrical Reason: Design Change Type: Additive - Lump Sum CHANGE TITLE I Grinder Installation (Option B-XHHW CU) THIS CONTRACT WILL BE MODIFIED AS FOLLOWS: Mill Motor Wiring ■ Option B. Provide XHHW CU wire alternative Clarifications ■ Steel frame required for cabinet mounting to be fabricated and installed by others. Dimensions to be determined priorto installation ■ Setting and securing cabinet by others. Coordination with Titan will be required for feeder wire routing ■ Deviations from this scope and means/methods, commissioning of equipment, and alterations requested byAHJ are not included Cost Breakdown This Change: Labor $24,505.35 Material $22,964.73 Other O&P $9,494.02 Total $56,964.10 Page 1 of 2 6/4/2026 2:13:03 PM Titan Electrical LLC Page 1 Lower valley transfer station, (kittitas) : PCO 034- Grinder Wiring Totals (Summary) - Bid Summary: Mill Motor (XHHW CU Option) Material Non -Quoted $22,964.73 Quotes 0.00 Sales Tax (0.00%) 0.00 Total Material $22,964.73 Labor Direct (213.09 hours @ $115.00) $24,505.35 Non -Productive Labor 0.00 Total Labor (213.09 hours) $24,505.35 Direct Job Expenses $0.00 Tools and Miscellaneous Materials 0.00 Subcontracts 0.00 Job Subtotal (Prime Cost) $47,470.08 Overhead (10.00%) 4,747.01 Profit (10.00%) 4,747.01 Job Total $56,964.10 Actual Bid Price $56,964.10 Material to Direct Labor ratio: 0.48 Prime Cost per square foot $0.00 Job Total per square foot $0.00 Actual Bid Price per square ft $0.00 Labor cost per square foot $0.00 Labor hours per square foot 0.00 Gross Profit % 16.87 Gross Profit $ $9,494.02 Net Profit % 8.33 a. W IL ti 0 �p M 0 o co x 00 x m U) m 0 j0 uj :.8 m c E = _0 0 z m n 0 E M wX E V) m 0 -i c 0 CL N w N N N CO CO LO 0 N NU) CO 0) 0) 10 0 0 0 0 t-- co w — to t-- 00 4 4 6 c) o zi — —, m 00 'T 06 m 6 to N u 0 0 w w w w w w w w w w 0 0 2 2 :E w w 0 0 0 M M M �R t, N N "t M to 0 0 0 Lo W 11, Cl) W0 O� ?I- O� 0 10 U CO llz' N N 10 N I- N M to 0 M 0 N 0 0 0 '- 0 M 0 Ln CV M 0 0 co co - cl) <,o - m 0 w a "r 0 w to 0 0 0 w m m 0 0 0 m m O� tq V: U� "t Un U� q OR C? Ci 1p O� 9 q r-� fll� r-w9V'"mmmo;:ommOwow000,lT I�r I-T f�- ItT 1-1 w 'IT fl. -It w r- W 'Zr LQ m - r- 0 to N m co Ln C14 m m 0) Cq Cq cli N owQwwwwwQowuwwum2mww 0 0 -It m 1,. 0 m r- 0 0 w 0 Lo 0 w 0 0 OD C� r-� Iq C? *,t " C9 9 " CO q Cli Cq 9 9 m 0 N N w w m m m to 0 m N 9 0 Ul) r.- 0 0 0 m r- f- N r- m to Ir m 00 0 W C.0 0 Cl) W r� N 0) tD N CN th Cl) 0 0 0 N 0 M r- — M �! N �� 'T �2 0 N 0 LO LO CN cl, r, Cl) O Cl) N 0) N ID CL 0 0 C CL > 0 0 ID 3: 0 a 0 Nx C: (D .0 cc C: E w E 0 w CL Q. m o x ._J 0 o o 5 5 U 3: 0 co . 0 a: I= 3: X E E V5 F- o o m _, 0 (D G u uj -j ZE o (D D D Lu Lu 3: & & & N & & 2 2 m 0 N CV xO n' C:) A A M A A A A A A A A m m A A :m it w W 0 M N N N N 'T Lo W 0 M 0 0 M N N 0 C) to to CG l) 0) 1- m 0- �; m m r- m m m m :� :; � �? ;: �2 ce) ;! �2 �2 CO - ?R �2 QN 'N" ON CONCc,) 'T V' BELSAA SMITH BELSASCO330H June 18,2026 Re: Grinder Shed Building Construction P.O. BOX 926 / 103 EAST 4T" AVE, SUITE 209 ELLENSBURG, WA 98926 509-925-9747 FAX: 509-962-3031 brandon@beismith.com Per the description below, we present the following change order proposal #75 (COP#75). COP #74 includes all the labor and materials needed to construct the grinder shed. As determined in our meetings the grinder shed is a stick built 20' x 6' building used the house the grinder control panel. The building scope includes: • 2x6 framing • One man door • One roller door • Siding and roofing • Plug in AC unit • Insulation • Interior sheeting • Grinder control panel stand Please note that the electrical package for this was captured in COP 74 and that the majority of the work was performed as a force account per the county. The only work currently remaining is the insulation, panel stand placement, and interior sheeting. Total cost added to contract: Time extension required: 0 Days Sincerely, Riley Eres, Belsaas & Smith Construction FA #06: $21,981.77 + WSST COP #75: $11,698.78 + WSST Complete Scope: $33,680.55 + WSST LO I- 04 0 ui ui z 0 ui CO z co cL 0 w 0 w 0 tn 76. g CL 04 4- 0 C14 uj Lu TZ Z 0 P In CL 0 Cl) w co al co 0 w w :D w a w C) 0 w w W w Z (0-) 0 F- ll� z n w 0 w w w z w 0 z U) 3: U) Z w::) (.)0 C) 0 F- 0 Z F- < C) w g 2 F- F- z (D 0 F- ()o w W LL 2: U- F- < w H w cl Z < U) w F- > F- :D 0 w w (1) w w w *9 LL ui r co z 0 < w ca F- z LL Illllullllll�lllll LL N 0 C14 F- w w U)iiiiiiiiii�un LU w z m Ilbllllllllllllalt 0 C) D LLJ Cl) z 0 C/5iiii�iiiiiiiiiii 0 CL 0 50 w Cl) 06 Lij Cl) ry 0 w (D j z 0 Lij < r....:............... A '111 -A t VALLEY STEEL WORKS, LLC 4530 Badger Pocket Rd Ellensburg, WA 98926 509-306-2119 vafleysteelworks@gmail.com I Flame /Address I Belsaas & Smith Construction P.O. Box 926 Ellensburg, WA 98926 Estimate Date Estimate # 6/10/2026 E24124 Project Item Description Qty Rate Total Fabrication Transfer Station Chipper power box stand 4" sq tube construction, bare steel 144"X24"X 12" 1 3,300.00 3,300.00 Subtotal $3,300.00 Sales Tax (8.3%) $0.00 Total $3,300.00 B E LSA AS P.O. BOX 926 / 103 EAST 4TH AVE, SUITE 209 ELLENSBURG, WA 98926 & 509-925-9747 FAX: 509-962-3031 SMITHbrandon@belsmith.com no BELSASC0330H June 20,2026 Re: MRW North Wall Per the description below, we present the following change order proposal #76 (COP#76). COP #76 includes all the labor and materials needed to construct the additional northern wall of the MRW Facility. The items included in this proposal are as shown below. • Steel Framing and misc. need brackets • All fasteners and anchors • Metal siding and trim • Gutter extension • Any needed equipment A more detailed cost breakdown is shown below along with the plans that we will be building off. If the plans have changed or if you have any additional questions, please feel free to reach out. Total cost added to contract: Time extension required: 0 Days Sincerely, Riley Eres, Belsaas & Smith Construction $70,477.93+WSST IIIIIIIIIIIIIIIIIIIIIIIIII IIII �IIIIIIIIIIIIIIIIIIIIIIIIIII IIII CD IlAlllllllllll 0 dl�lll�llllll ui w IIIIIINIIIIgllllll U) LU ui z IIIIIIIIINIAAIIII 0 ui ry co 10 U) 0 Q- 0 Ui Q ui z < mommommoommommom INS 0 W 0 w cl UJ w w W w Z C) 0 0 z W 0 F- w w C) W 2 0 p z W (9 z U) Z LL, 0 0dd Or) F- z w < 2 F- z U) 0 F- (-)0 W wLL F- r LL < W F- W C) Cl) Z < D U) WF- > r 0 0 w w U) w w w 3 00 V— C) �Q = 9 C c U) < o no ui OP z U) Lo 1 T- p F- Z < W < caa z in w < ly LL r --I Z LU 0—J w z 0(5 0 0 0 w 0 Zo LL 1- C6 < F- Q 0 00 (L 00 � CIL >. W Y) t�; oc uj C) w 0 le N N l w l l l l Z .2D a C 0 F Z < CL Z� 0 m 2 -j LL w U) Z 9z (n LL 0 0 LL 0 0 e w z A w ui D 9 .P A � C-4 Lj C) Y U) < 11 V) z U) Z Z 90, (j) U) 2 CL iz r z m< wz wa WU) 0, < 00 Ui 0 rr WW j< QX (D 0 CL w W p W U) Z wz Up 0 02p. 55 0 TW F- 'F' fw_ Z) 0 W D MW2 - I.- a ❑ (D � o w < w LL 0 0 U, W F- U) -Z < z 5-: 6-5 K JF U�- I-i WZ � 0 Q z 7Q F- 0 0 w w C3 w < < 2 2 8 P 0 4- ca F: F— OK IZD (Z' WW Owl" FE zi p W 421) aj U)o (n W2 w o ca M. :CS, 0) O7w I- �L o 0 U) - w w 0 F p : z 0- :r w 0. 0. w cc o C), iz z a 0 -W Z F- m IZ j< WO WW <j > 0 L) 0 :)a CL :<z A "n -j 1, — z C� 0 0 Ir W F- W 0 CL < Wj (D:c w L) W F- U) .J O U m 2 w a in vi 0 0 v NWF Q� `1p UU U Y a om e, G Q U ma m�QYy dF Q 2' o I YN ¢ No AMU Q0 wxm u z Q a z O 0 z D 0 LL 0 z_ J D � m Z Q a Q f'• Q U) z z W Q U U) 0 O U m 2i w r W_ 0 H O I I N w J U U KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS STAFF REPORT STUDY SESSION DATE: August 11, 2026 ACTION REQUESTED: Informational discussion regarding remediation of the former transfer station site. BACKGROUND: Solid waste operations have moved from the former transfer station to the new facility. Before the former site is returned to the City of Ellensburg, the County must develop an appropriate approach for addressing conditions associated with its prior use. Parametrix has prepared a draft remediation plan to begin defining the work that may be necessary. DISCUSSION: The draft remediation plan has been provided to Waste Management for review because both the County and Waste Management have responsibilities associated with the former site. Staff intends to work with Waste Management to develop a coordinated approach before beginning discussions with the City of Ellensburg. This process will help clarify the scope of work, responsibilities, anticipated costs, and the steps necessary to return the property in an acceptable condition. FISCAL IMPACT: The fiscal impact has not yet been determined. Costs will depend on the final remediation scope and the allocation of responsibilities between the County and Waste Management. RECOMMENDATION: Discuss the status of remediation planning for the former transfer station site. No formal action is requested. ATTACHMENTS: None LEAD STAFF: Jesse Cox, Solid Waste Director KITTITAS COUNTY BOARD OF COUNTY COMMISSIONERS STAFF REPORT STUDY SESSION DATE: August 11, 2026 ACTION REQUESTED: Direction to proceed with establishing a separate study session for the Solid Waste Department. BACKGROUND: Solid Waste, Maintenance, and Project Management are currently scheduled together for a combined study session with the Board of County Commissioners. These functions have different operational responsibilities, priorities, and reporting needs. Solid Waste has a sufficient number of regulatory, financial, contractual, and capital -planning matters to support a separate departmental study session. DISCUSSION: A separate Solid Waste study session would provide dedicated time for the Board and department staff to discuss Solid Waste operations and long-term planning without competing with unrelated departmental topics If the Board supports the change, staff would coordinate with BOCC Administration and legal staff to determine the required process and prepare a resolution, calendar amendment, and other documentation necessary to establish a separate Solid Waste study session. FISCAL IMPACT: No direct fiscal impact is anticipated. The change may require minor administrative adjustments to the Board's study session calendar. RECOMMENDATION: Authorize the proposed study session separation. ATTACHMENTS: None LEAD STAFF: Jesse Cox, Solid Waste Director KITTITAS COUNTY Board of County Commissioners STUDY SESSION STAFF REPORT AGENDA DATE: August 11, 2026 ACTION REQUESTED: Saniglaze Discussion BACKGROUND: Kittitas County Maintenance would like to discuss the process of getting Saniglaze applied in the main public restrooms for the Courthouse. This is a viable option to give more of an updated look, easier surfaces to clean, and a lesser cost than remodel. INTERACTION: Maintenance, BOCC. RECOMMENDATION: No Action requested at this time. HANDLING: N/A ATTACHMENTS: Saniglaze documents LEAD STAFF: Cody Cupp, Facilities Maintenance Director PACIFIC AODULAR ►i�1 Pacific Modular - WA 820 SW 34th St #E Renton, WA, 98057 Office: 425-243-1866 public@pacificmodular.com pacificmodular.com Reid Bucy Business Development rbucy@12acificmodular.com pacificmodular.com m: 503.504.8194 Services Qty Item Service Details Service Location: 205 West 5th Avenue Ellensburg, WA, 98926 Proposal #10121-Men's Restroo m: Saniglaze Installati on Aug 3, 2026 Client Kittitas County Cody Cupp 205 West 5th Avenue Ellensburg, WA, 98926 509-962-7509 cody.cupp.ma@co.kittitas.wa.us 1 VariGLAZE MAX Q Process A multi -step process utilizing proprietary chemicals and compounds that removes embedded contaminants and surface soils from ceramic tile and other hard surfaces, and installs a durable, chemical and urine resistant, opaque tinted Xolite or epoxy based coating over the entire surface. Next a full broadcast of quartz -based solids is spread evenly over the surface while the coating is uncured. After the coating has cured, the loose solids are removed and an encapsulation coat of chemical and urine resistant, clear epoxy coating is applied over the surface. When the encapsulation coat cures, a final coat of a high- performance urethane -based coating is applied over the entire surface. Flake Color TBD Process specified for floors only 1 ChromaGLAZE Process A multi -step process utilizing proprietary chemicals and compounds that removes embedded contaminants and surface soils from ceramic tile and other hard surfaces, and installs a durable, chemical and urine resistant, opaque tinted Xolite-based coating over the entire surface. For walls only Color TBD Unit Price Line Subtotal $8,000.00 $8,000.00 $4,000.00 $4,000.00 Qty Item Unit Price Line Subtotal ChromaGLAZE Process A multi -step process utilizing proprietary chemicals and compounds that removes embedded contaminants and surface soils from ceramic tile and other hard surfaces, and installs a durable, chemical and urine resistant, opaque tinted Xolite-based coating over the entire surface. Color TBD For partitions only Miscellaneous Services that fall outside of the floor and textile norm. Pricing for housing and per diem Materials Notes • Terms Net 30 Sales tax not included in pricing Priced using prevailing wage Mobilization and housing included in pricing Pac Mod is not responsible for removal and replacement of wall fixtures Inspection pricing attached separately Terms and conditions sheet attached separately Project to be completed two separate weekends Sourcewell and Omnia certificate attached separately $1,500.00 $1,500.00 $2,250.00 $2,250.00 $3,500.00 $3,500.00 Service Subtotal $19,250.00 Total $19,250.00 This program was designed for your facility to provide the highest possible level of appearance, improve indoor air quality, and maximize the life of your flooring and textiles. These fixed prices include all labor, materials, equipment, and supervision necessary to perform the specified services. All work will be done in a safe, professional manner in accordance with all applicable Federal, State, and local laws, codes, regulations, and ordinances. For additional visits outside the scope of this maintenance program, a minimum trip fee will apply. Name (Print) Signature KITTITAS COUNTY Board of County Commissioners STUDY SESSION STAFF REPORT AGENDA DATE: August 11, 2026 ACTION REQUESTED: Project Updates BACKGROUND: Jail Project — Door Install, Skylight Update, Floors Rodeo Grandstands — Back Punch Aug 12 EOC/SAR — Building Erection, Concrete, Gen Set Delivery INTERACTION: Maintenance, BOCC. RECOMMENDATION: No Action requested at this time. HANDLING: N/A ATTACHMENTS: N/A LEAD STAFF: Cody Cupp, Facilities Maintenance Director $OJeA C'kite ure PROJECT: New Regional Search and Rescue/EOC Facility Kittitas County 2021 Airport Rd Cle Elum, WA 98922 TO: Belsaas & Smith Construction inc. INITIATION DATE: PO Box 926 Ellensburg, WA 98926 ARCHITECT'S PROJECT NO.: CONTRACT FOR: Notice to Proceed Date: Substantial Completion Date: The following work has been completed and incorporated as changes in this Contract: COP-07 Secondary Conductors from Meter to Building COP-09 Credit for Sewer Cleanout Revisions COP-10 Culvert at Airport Road COP-11 Pressure Tank & switch for Well COP-12 Widen drive north of building/generator COP-13 Additional tree removal July 30, 2026 2516 General Construction November 3, 2025 July 31, 2026 CHANGE ORDER NO.: 3 revised Amount Days $35,454.24 65 ($1,096.00) 0 $4,563.43 2 $8,999.90 2 $5,802.90 0 $2,045.85 0 TOTAL $55,770.32 69 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. The original Contract Sum was................................................................................................................ $2,955,300.00 Net change by previously authorized Change Orders......................................................................... $93,062.40 The Contract Sum will be (increased) by this Change Order.................................................................. $55,770.32 The new Contract Sum including this Change Order will be............................................................... $3,104,132.72 Net change in Contract Time by previously authorized Change Orders ................... 5 The Contract Time will be changed per this Change Order 69 The Date of Substantial Completion is now............................................................... October 13, 2026 Authorized: $D"ckitecture, nllc Kittitas County Belsaas & Smith Construction inc. ARCHITECT OWNER CONTRACTOR 1320 North 16th Avenue, Suite C 205 West 5th Ave PO Box 926 Yakima, Washington 98902 Ellensburg, WA 98926 Ellensbur A 2 I By By Date 07/30/2026 Date / t 0 Date � MW "jFA I BO"Crvitetture PROJECT: New Regional Search and RescuelEOC Facility Kittitas County 2021 Airport Rd Cie Elum, WA 98922 TO: Belsaas & Smith Construction inc. INITIATION DATE: PO Box 926 Ellensburg, WA 98926 ARCHITECT'S PROJECT NO.: CONTRACT FOR: Notice to Proceed Date: Substantial Completion Date The following work has been completed and incorporated as changes in this Contract COP-07 Secondary Conductors from Meter to Building COP-09 Credit for Sewer Cleanout Revisions COP-10 Culvert at Airport Road COP-11 Pressure Tank & switch for Well COP-12 Widen drive north of building/generator COP-13 Additional tree removal July 30, 2026 2516 General Construction November 3, 2025 July 31, 2026 Not valid until signed by both the Owner and Architect. Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. Theoriginal Contract Sum was................................................................................................................ Net change by previously authorized Change Orders......................................................................... The Contract Sum will be (increased) by this Change Order.................................................................. The new Contract Sum including this Change Order will be............................................................... Net change in Contract Time by previously authorized Change Orders ................... The Contract Time will be changed per this Change Order The Date of Substantial Completion is now............................................................... B'Mmkit a"re, vllc Kittitas County ARCHITECT OWNER 1320 North 16th Avenue, Suite C Yakima, Washington 98902 205 West 5th Ave f Ellensburg, WA 98926 By --7— gy f Date 07/30/2026 Date / rf CHANGE ORDER NO.: 3 reviser Amount Days $35,454.24 65 ($1,096.00) 0 $4,563.43 2 $8,999.90 2 $5,802.90 0 $2,045.85 0 TOTAL $55,770.32 69 $2,955,300.00 $93,062.40 $55,770.32 $3,104,132.72 5 69 October 13, 2026 Authorized: Belsaas & Smith Construction inc. CONTRACTOR PO Box 926 Ellensburg, A 98 6 By Date '2/ )3 li�v KITTITAS COUNTY Board of County Commissioners STAFF REPORT AGENDA DATE: August 11, 2026 ACTION REQUESTED: Request to Approval to proceed with Change Order Proposal 7, and 9- 13 for the Search & Rescue/EOC to incorporate into a Change Order. BACKGROUND: The Sheriff's office in conjunction with public works received Federal funds to assist with building a new Emergency Operations Center sited with the new Search and Rescue facility. Phase one of the project included clearing and rough grading of the site along with the installation of a well. This portion of the work has been completed. Phase 2 of the project went out to bid and on September 18, 2025, 10 bids were received. After review of the bids it was determined that Belsaas and Smith Construction Inc., was the lowest responsive bidder. The following proposals have been reviewed by the architect and recommended for board's approval to move forward with adding to the contract. Change Order Proposal 7, Secondary Conductors from Meter to Building Change Order Proposal 9, Credit for sewer cleanouts. Change Order Proposal 10, Culvert on Airport Road Change Order Proposal 11, Pressure Tand & switch for Well Change Order Proposal 12, Widen driveway to the north of building Change Order Proposal 13, Additional tree removal. INTERACTION: BORArchitecture RECOMMENDATION: Request Boards Approval for chairs signature on Change Order No. 3 for the Search & Rescue/ EOC. HANDLING: Return copy to maintenance ATTACHMENTS: Change Order No. 3 LEAD STAFF: Patti Stacey, Facilities and Waste Operations Director